Aue power plant

from Wikipedia, the free encyclopedia
Aue power plant
Baden KraftwerkAue.jpg
location
Aue power plant (Canton of Aargau)
Aue power plant
Coordinates 665 754  /  258.1 thousand coordinates: 47 ° 28 '13 "  N , 8 ° 18' 39"  O ; CH1903:  six hundred and sixty-five thousand seven hundred fifty-four  /  258 100
country Switzerland
Waters Limmat
Data
Type Canal power plant
Primary energy Hydropower
power 4.1 MW
owner Regionalwerke AG Baden
Project start 1907
Start of operations 1909
turbine Two Kaplan bulb turbines, two bevel gear bulb turbines
Website Aue power plant
f2

The Aue power plant is a run-of-river power plant on the Limmat in Baden in the canton of Aargau . It is located near the high bridge and has belonged to Regionalwerke AG Baden (formerly Elektrizitätsgesellschaft Baden AG ) since 1904 .

history

The Spoerry spinning mill, built in 1835/36, the oldest factory in Baden and one of the largest cotton mills in Switzerland at the time , was destroyed by a major fire in 1904.

The spinning mill owner decided not to rebuild and sold the entire area with the hydropower plant to Elektrizitätsgesellschaft Baden AG in the same year. This converted the power plant to generate electrical energy. In 1909 the first two machine groups were put into operation. Together with the Kappelerhof power plant and the steam reserve system, the power requirements of the city of Baden at that time could be met.

In 1925 a cone Francis turbine (machine group 3, output 1 MW) was installed. This was supplemented in 1966 with two Kaplan turbines (today's machine groups 1 and 2) and a hydraulic weir system with flaps and segment gates was installed.

In the years 2011 to 2014 there was an expansion and the new license was granted until 2074. The Konus Francis turbine was replaced with a new Francis turbine from Andritz Hydro Ravensburg (former subsidiary of Escher Wyss AG ). Due to the new water protection law, the remaining water quantities had to be increased in order to allow the living beings in the river more optimal living conditions.

To use this higher residual water volume, a doping power plant was built above the drop height of the weir for the production of renewable energy. A fish ladder was built with a fish descent aid so that the fish can safely get from the upper water to the lower water. The boaters received a new crossing point at the weir and the canoeists a new white water stretch.

Today's production

As of 2017, the three machine groups and the doping turbine at the weir are producing 30  GWh per year and supplying around 7,000 households with renewable energy from the region. The maximum flow through the four turbines is 130 m 3 / s. The gross head is around 5 m.

See also

literature

Web links

Commons : Kraftwerk Aue  - Collection of images, videos and audio files

Individual evidence

  1. ^ Badener Neujahrsblätter 2004: The major fire of the Spoerry spinning mill
  2. ^ Badener Neujahrsblätter 1973: This is how Baden lost its oldest industry
  3. ZekHydro, October 2014: Baden operators rely on revitalization in the dive
  4. Swiss television from December 5, 2013: Transport and installation of the XXL turbine
  5. Baden regional works: Aue power station
  6. IM Maggia Engineering AG, Locarno: Aue power plant - new doping power plant and reconstruction of Group 3