Ferlach-Maria Rain run-of-river power plant
| Ferlach-Maria Rain run-of-river power plant | |||
|---|---|---|---|
| location | |||
|
|
|||
| Coordinates | 46 ° 32 '47 " N , 14 ° 17' 55" E | ||
| country | Austria | ||
| Waters | Outside | ||
| Data | |||
| power | 75 MW | ||
| owner | VERBUND Hydro Power AG | ||
| operator | VERBUND Hydro Power AG | ||
| Project start | 1971 | ||
| Start of operations | 1975 | ||
| turbine | Two Kaplan turbines | ||
| Energy fed in per year | 318 GWh | ||
The Ferlach-Maria Rain run-of-river power plant is a run-of- river power plant on the Drau between the communities of Ferlach and Maria Rain . The power plant dams the Drau over ten kilometers to the Feistritz / Ludmannsdorf power plant above, thus forming the Ferlach reservoir .
Technical specifications
The power plant was built between 1971 and 1975 by the ÖDK in cooperation with Kelag . It is unmanned and controlled from the Feistritz / Ludmannsdorf power station. The nominal output is 75 MW . The annual production is 318 GWh . The water level is approx. 17 m; To increase the head, the river bed below the power plant was lowered by 4.5 m. The two Kaplan turbines each produce a maximum of 39 MW, the associated three-phase synchronous generators a maximum of 50 MVA.
See also
Web links
- Ferlach-Maria Rain run-of-river power plant. Verbund AG , accessed on July 23, 2013 .