Fukuoka subway

from Wikipedia, the free encyclopedia
Map of the routes of the subway
Type 2000 train in Meinohama subway station
Interior of the train type 2000
Train for the Nanakuma line, type 3000 with linear motor, design by Alexander Neumeister

The subway Fukuoka ( Japanese 福岡 市 営 地下 鉄 , Fukuoka-shiei chikatetsu , dt. Urban subway Fukuoka ) is the subway network of the southern Japanese city ​​of Fukuoka .

After the decision to shut down the city's tram system by the end of the 1970s, a new public transport system was needed. In 1973 it was decided to build a subway and in 1975 construction began. Lines 1 and 2 (8.5 km) share part of the 30.5 km and 34 stops of the underground system. In addition, some trains on Line 1 continue as local trains on the JR Chikuhi Line (44 km) via the western terminus at Meinohama. The trains run exclusively underground, with the exception of the two final stops Meinohama and Kaizuka. The operating times are from 5:30 am to 11:30 pm, the frequency is between 4 and 9 minutes and 3–4 minutes during rush hour .

Line 1: Airport Line ( 空港 線 , Kūkō-sen )

Timetable Line 1 - Kuko Line ( March 23, 2008 )
Fukuokakuko (Airport)
Higashi-hie 3
Hakata 5
Gion 7th
Nakasu-Kawabata 9
Tenjin 11
Akasaka 13
Ohorikoen 15th
Tojinmachi 17th
Nishijin 19th
Fujisaki 21st
Muromi 22nd
Meinohama 25th

On July 26, 1981, the airport line was opened with a length of then 5.8 km. The last expansion took place in 1993 when the connection to Fukuoka Airport went into operation. There is a connection to line 2 (Hakozaki) at the Nakasu-Kawabata station. Today it is 13.1 km long and has 13 stops, the two end stops are Fukuokakuko (airport) and Meinohama.

Line 2: Hakozaki Line ( 箱 崎 線 , Hakozaki-sen )

Timeline Line 2 - Hakozaki Line ( March 23, 2008 )
Kaizuka
Hakozaki Kyudaimae 2
Hakozaki-Miyamae 4th
Maidashi-Kyudaibyoinmae 6th
Chiyo kenchoguchi 7th
Gofukumachi 9
Nakasu-Kawabata 10

The second line was opened on April 20, 1982 and in 1986 reached its current length of 4.7 km. At its western terminal station, Nakasu-Kawabata, there is a connection to the airport line, at the eastern terminal station, Kaizuka, there is a connection to the Miyajidake line of the private Nishitetsu train. In rush hour, the trains go over to the airport line and go to Meinohama.

Line 3: Nanakuma Line ( 七 隈 線 , Nanakuma-sen )

Timeline Line 3 - Nanakuma Line (March 23, 2008)
Tenjin-minami
Watanabe-dori 1
Yakuin 3
Yakuin-odori 4th
Sakurazaka 6th
Ropponmatsu 8th
Befu 9
Chayama 11
Kanayama 13
Nanakuma 14th
Fukudai-mae 16
Umebayashi 17th
Noke 19th
Kamo 21st
Jiromaru 22nd
Hashimoto 24

On February 3, 2005, the Nanakuma line went into operation. It is 12 km long and has 16 stations . It runs underground for its entire length from Tenjin-minami station in a south-westerly direction and ends in Hashimoto . It has no direct connection to the other two subway lines, only to the main line of the private Nishitetsu railway. In Tenjin, the airport line is around 500 meters from the train station.

Opening dates

Opening dates
line date route km
1 07/29 1981 Muromi - Tenjin 5.8
1 April 20 1982 Tenjin - Nakasu-Kawabata 0.8
2 April 20 1982 Nakasu-Kawabata - Gofukumachi 0.5
1 22.03. 1983 Muromi - Meinohama 1.5
1 22.03. 1983 Nakasu-Kawabata - Hakata (prov.) 1.4
2 04/27 1984 Gofukumachi - Maidashi-Kyudaibyoinmae 1.6
1 03.03. 1985 Hakata (prov.) - Hakata 0.3
2 March 31 1986 Maidashi-Kyudaibyoinamae - Hakozaki-Kyudaimae 1.6
2 11/21 1986 Hakozaki-Kyudaimae - Kaizuka 1.0
1 03.03. 1993 Hakata - Fukuoka Airport 3.2
3 03.02. 2005 Tenjin-minami - Hashimoto 12.7

Technical specifications

The track width of the airport and Hakozaki lines is 1,067 mm and the supply voltage of 1500 volts ( direct voltage ) is provided by an overhead line . The trains consist of 6 wagons and have a maximum speed of 90 km / h. The platform length is 120 m, which can be reached via escalators and elevators . The gauge of the Nanakuma line is 1435 mm, it is driven by a linear motor , and the power is also supplied by an overhead line with 1500 volts direct current.

Further expansion

Future plans include building a link from Yakuin Station on the Nanakuma Line to Hakata Station on the Airport Line to connect to the Central Station (Hakata). There are also plans to connect the port district to the subway network via the Tenjin stop (the only station served by all three lines). The Hakozaki Line is to be extended to the northeast via the Miyajidake Line of the Nishitetsu.

Individual evidence

  1. Hitachi Transportation Systems (a column by Alexander Neumeister): "Technology and Design in Harmony" - the New Fukuoka Linear Metro ( Memento of March 10, 2008 in the Internet Archive ) (English), accessed on June 13, 2009

Web links

Commons : Fukuoka Subway  - Collection of Images, Videos and Audio Files