Alternating path
Aspang Market-Friedberg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route number : | 167 01 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Course book route (ÖBB) : | 520 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route length: | 21.473 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Gauge : | 1435 mm ( standard gauge ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route class : | D3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum slope : | 22.5 ‰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum radius : | 250 m | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Wechselbahn is a railway line in Lower Austria and Styria from Aspang to Friedberg . It connects the Aspangbahn with the Thermenbahn (from Friedberg to Fehring ) and the Pinkatalbahn (from Friedberg to Oberwart ).
The railway line is named after the mountain range of the Wechsel , over which it leads to its edge.
history
The construction of the Wechselbahn took place in the course of the construction of the "New Alpine Railways" with which the Austro-Hungarian state tried to break the transport monopoly of the private southern railway company to Trieste. The railway line opened on October 11, 1910 and opened to traffic the following day. 16 workers were killed and more than 1,600 people were injured during construction.
The Hartberg tunnel near Mönichkirchen was used by the moving Führer headquarters “Spring Storm” from April 1941 as a place to lead the Balkan campaign.
vehicles
Since the beginning of 2005, the railcars ÖBB 5022 (Desiro) from Siemens and VT 5047 have been used on the passenger route, and the 2016 Hercules series on locomotive-hauled trains (mostly city shuttle trains ) . Freight trains are usually also hauled with this type. Up to this point in time, the VT 5047 and VT 5147 and the locomotives of the 2143 and 2043 series were running on the route .
More pictures
The former stopping and loading point Mönichkirchen was the seat of Hitler's "Spring Storm" in 1941
literature
- Hannes Mohr : Geology of the Wechselbahn (especially the Groszen Hartberg tunnel) . Hölder, Vienna 1913. ( Permalink Austrian Library Association ).
- Rosa Allerbauer: Festschrift for the 75th anniversary of the Wechselbahn, 1910–1985 . Tourist office diving, diving 1985. ( Permalink Austrian library network ).
- Peter Wegenstein (texts, route sketch), Hellmuth Fröhlich (photo): The route over the change. This volume covers the routes Wiener Neustadt-Fehring, Bierbaum-Neudau, Friedberg state border next to Rechnitz and Oberwart-Oberschützen . Bahn im Bild, Volume 77, ZDB -ID 52827-4 . Pospischil, Vienna 1991.
- Franz Trimmel: Wechselbahn - Episodes from the life of a 100-year-old . 1st edition. KRAL publishing house, Berndorf 2010, ISBN 978-3-902447-97-5 . ( Permalink German National Library ).
Web links
Individual evidence
- ↑ Little Chronicle. (...) Awards on the occasion of the completion of the alternate career. In: Neue Freie Presse , Abendblatt, No. 16572/1910, October 11, 1910, p. 1, bottom left. (Online at ANNO ). .
- ↑ The opening of the Wechselbahn. In: Neue Freie Presse , Morgenblatt, No. 16573/1910, October 12, 1910, p. 12, bottom left. (Online at ANNO ). .