Neuchâtel – Le Locle-Col-des-Roches railway line

from Wikipedia, the free encyclopedia
Neuchâtel – Le Locle
NPZ at Le Locle train station
NPZ at Le Locle train station
Timetable field : 223
Route length: 38.21 km
Gauge : 1435 mm ( standard gauge )
Power system : 15 kV 16.7 Hz  ~
Maximum slope : 31 
BSicon .svgBSicon .svgBSicon ABZg + r.svg
from Biel / Bienne and from Bern
BSicon .svgBSicon .svgBSicon BHF.svg
75.29 Neuchâtel 479  m above sea level M.
BSicon .svgBSicon .svgBSicon DST.svg
73.96
1.37
Neuchâtel-Vauseyon 475  m above sea level M.
BSicon .svgBSicon .svgBSicon ABZgl.svg
SBB Jura foot line to Lausanne
BSicon .svgBSicon .svgBSicon STR.svg
and SBB to Pontarlier
BSicon .svgBSicon .svgBSicon TUNNEL1.svg
Gibet (678 m)
BSicon .svgBSicon .svgBSicon HST.svg
3.10 Les Deurres 510  m above sea level M.
BSicon .svgBSicon .svgBSicon BHF.svg
4.32 Corcelles - Peseux 531  m above sea level M.
BSicon .svgBSicon .svgBSicon TUNNEL2.svg
Luche (116 m)
BSicon .svgBSicon .svgBSicon TUNNEL2.svg
Sauge (117 m)
BSicon .svgBSicon .svgBSicon ABHFl + l.svg
10.40 Chambrelia 685  m above sea level M.
BSicon .svgBSicon .svgBSicon HST.svg
14.06 Montmollin - Montezillon 777  m above sea level M.
BSicon .svgBSicon .svgBSicon BHF.svg
16.90 Les Geneveys-sur-Coffrane 850  m above sea level M.
BSicon .svgBSicon .svgBSicon BHF.svg
20.99 Les Hauts-Geneveys 954  m above sea level M.
BSicon .svgBSicon .svgBSicon tSTRa.svg
Les Loges (3259 m)
BSicon .svgBSicon .svgBSicon tGIPl.svg
24.82 Culminating point 1048  m above sea level M.
BSicon .svgBSicon .svgBSicon tSTRe.svg
BSicon .svgBSicon .svgBSicon eBHF.svg
25.85 Convers wedge station 1047  m above sea level M.
BSicon .svgBSicon exSTRq.svgBSicon eABZgr.svg
until 1895 to Le Creux – Biel / Bienne
BSicon .svgBSicon .svgBSicon TUNNEL1.svg
Mont-Sagne (1354 m)
BSicon .svgBSicon STR + r.svgBSicon STR.svg
from Biel / Bienne – Le Creux
BSicon .svgBSicon tSTRa.svgBSicon tSTRa.svg
Combe (230 m) / La Combe (254 m)
BSicon STR + l.svgBSicon tKRZ.svgBSicon tKRZ.svg
TRN from Les Ponts-de-Martel
BSicon HST.svgBSicon tSTRe.svgBSicon tSTRe.svg
La Chaux-de-Fonds-Grenier
BSicon ABZg + r.svgBSicon ABZg + l.svgBSicon STRr.svg
CJ from Saignelégier
BSicon KBHFe.svgBSicon BHF.svgBSicon .svg
77.83
29.49
La Chaux-de-Fonds 994  m above sea level M.
   
30.64 La Chaux-de-Fonds -Ouest 1000  m above sea level M.
   
32.18 Les Eplatures 1012  m above sea level M.
Stop, stop
33.31 Le Crêt-du-Locle 1015  m above sea level M.
BSicon KBHFa.svgBSicon BHF.svgBSicon .svg
37.06 Le Locle 946  m above sea level M.
BSicon STRr.svgBSicon STR.svgBSicon .svg
TRN to les Brenets
Bridge (medium)
Col des Roches (89 m)
Station, station
38.86 Le Locle - Col-des-Roches 915  m above sea level M.
   
Col-des-Roches (318 m by 436 m)
   
39.58
481.74
State border CH – F 907  m above sea level M.
   
SBB – RFF ownership limit
   
Col-des-Roches (118 m by 436 m)
Route - straight ahead
RFF route to Besançon

The Neuchâtel – Le Locle-Col-des-Roches line is a single - track, standard - gauge railway line operated by the Swiss Federal Railways (SBB).

history

Neuchâtel railway station around 1897
In Chambrelien station the steam locomotives with a tender had to be turned on the turntable.
La Chaux-de-Fonds station, 1904
Col-des-Roches is the last stop on Swiss soil.

The railway line from Neuchâtel to La Chaux-de-Fonds and on to Le Locle was built in four stages between 1857 and 1860 by the Jura industriel (JI). The JI was taken over by the Jura bernois (JB) in 1875 , which changed its name to Jura – Bern – Lucerne Railway (JBL) in 1884. The JBL extended the railway to the Swiss-French border at Le Locle-Col-des-Roches (then Brenets-Col-des-Roches) and connected it through the Col-des-Roches tunnel via Besançon to the French railway network of the Paris company -Lyon-Méditerrané (PLM).

On January 1, 1886, the 38.21 kilometer long Neuchâtel – Le Locle-Col-des-Roches line was outsourced from the Jura-Bern-Lucerne Railway (JBL) and integrated into the newly founded Jura neuchâtelois (JN), which served the Canton Neuchâtel belonged.

The federal government bought the railway from the canton of Neuchâtel and incorporated it into the network of the Swiss Federal Railways (SBB) on July 1, 1913 . In 1931, the SBB electrified the line to Le Locle- Col-des-Roches with 15 kV 16⅔ Hz alternating current. The subsequent French line is not electrified.

Route description

Shortly after the Neuchâtel train station , the line to Le Locle separates from the main line to Lausanne and, after a short tunnel, comes to the Les Deurres stop and Corcelles - Peseux train station . The trains continue to gain height quickly and travelers can enjoy the panorama over Lake Neuchâtel . In the station Chambrelien one is hairpin necessary so that trains can continue on their way. Since the SBB only use shuttle trains on this route , it is no longer necessary to change the locomotive. After the change of direction, the trains gain height and travel to Les Geneveys-sur-Coffrane . After the larger town of Les Hauts-Geneveys, trains pass through the Loges and Mont-Sagne tunnels. After the second tunnel, the track is parallel to the narrow-gauge line from Les Ponts-de-Martel . Shortly before La Chaux-de-Fonds, the lines from Neuchâtel and Biel / Bienne run together through a tunnel to the station.

On the 8-kilometer stretch between La-Chaux-de-Fonds and Le Locle, there used to be several stops that have been closed over time. However, the Le Crêt-du-Locle stop was put back into operation in August 2007. Most trains from La Chaux-de-Fonds end in Le Locle, where the narrow-gauge TRN enables the onward journey to Les Brenets . The few railcars that continue to France arrive at Le Locle-Col-des-Roches station after a steep incline and crossing a steel bridge. There you drive into the Col-des-Roches tunnel, in the middle of which is the national border.

Transrun

On September 23, 2012, the Neuchâtel voters narrowly rejected the so-called “Transrun”, a direct S-Bahn connection between Neuchâtel and La Chaux-de-Fonds. The railway line, which cost around one billion francs, would have made the cumbersome hairpin in Chambrelien superfluous, shortened the route from 29.5 to 16.7 kilometers and cut the journey time by half from 27 minutes. This would have required the construction of a 6.2 km long tunnel through the Chaumont and a 5.7 km long cut under the Vue des Alpes . In the open section in between, the trains would have crossed at Cernier station .

business

French diesel multiple units operate on the La Chaux-de-Fonds – Le Locle– Morteau route.

Since December 13, 2015, a RegioExpress and a regional train have been running between Neuchâtel and La Chaux-de-Fonds every hour , serving the Corcelles-Peseux, Chambrelien and Les Geneveys-sur-Coffrane stations every half hour. The RE trains are linked from Bern to La Chaux-de-Fonds. There are EW III -Pendelzüge the BLS with locomotives of the series Re 465 used. The regional trains continue to Le Locle via La Chaux-de-Fonds.

The offer is supplemented by a second hourly regional train connection between La Chaux-de-Fonds and Le Locle. The stops in the lower section of the route are served by the Neuchâtel - Corcelles-Peseux regios that run every half hour. This offer results in three-hour motor vehicle rotations Neuchâtel - Le Locle - La Chaux-de-Fonds - Le Locle - Neuchâtel - Corcelles-Peseux - Neuchâtel - Corcelles-Peseux - Neuchâtel. Two RABe 524 ( TILO - Flirt ) multiple units of the SBB and a RABe 527 of the Neuchâtel transport company transN are used .

Between La Chaux-de-Fonds and Morteau there are also several diesel-powered trains for cross-border commuters (4 trains per day from La Chaux-de-Fonds, 6 in the opposite direction), which also use the border station Le Locle-Col -des-Roches serve. The Franche-Comté region has purchased type X 73500 railcars to operate this route . Four of them, X 73752 to 73755, have been equipped with the Swiss Signum train protection system since 2010 , but without ZUB and ETM .

literature

References and comments

  1. Abbreviation from Transport entre Régions Urbaines Neuchâteloises German, for example, traffic between the urban regions of Neuchâtel
  2. Andrea Kucera: Narrow no to the Transrun underground rapid transit system. In: NZZ Online. September 23, 2012, accessed April 16, 2014 .
  3. Le tracé en coupe du Transrun. Transrun SA, accessed April 16, 2014 (French).
  4. As of the 2014 timetable
  5. ^ Neuchâtel region. Timetables. SBB, accessed on April 18, 2014 .