Lucendro power plant

from Wikipedia, the free encyclopedia
Lucendro power plant
Airolo in 1967, during the construction of the equalization basin under the Lucendro headquarters in Airolo
Airolo in 1967, during the construction of the equalization basin under the Lucendro headquarters in Airolo
location
Lucendro power plant (Canton Ticino)
Lucendro power plant
Coordinates 688922  /  153462
country SwitzerlandSwitzerland Switzerland
Canton of TicinoCanton of Ticino Ticino
Waters Reuss , Ticino
Data
Type Storage power plant
Primary energy water
power 58 MW (Lucendro headquarters)
owner Azienda Elettrica Ticinese (AET)
Project start 1942
Start of operations Lucedro headquarters: 1945
Sella small power station: 1991
Energy fed in 2017 100 GWh
Website ATEL: Impianto idroelettrico Lucendro
was standing 2018
f2

The Lucendro power plant ( Italian Impianto idroelettrico Lucendro ), sometimes also called Airolo power plant after the location of the main headquarters , is a storage power plant in the Gotthard region . which lies in the territory of the municipality of Airolo in the canton of Ticino .

history

The Atel received in 1942 by the cantons of Uri and Ticino the concession to use the waters in the St. Gotthard Pass. The first license expired on December 31, 1984 and was extended to December 31, 2024. The canton of Ticino and the canton of Uri have decided to declare a reversal. A cantonal law obliges the canton of Ticino to assert a reversal and to operate the power plant itself when each water right license expires. This is also the reason why Alpiq Holding sold the subsidiary Alpiq Hydro Ticino AG to Azienda Elettrica Ticinese (AET) in 2015 .

investment

The power plant operated by Alpiq Hydro Ticino SA was built between 1942 and 1948 and partially started operation in 1945. At first, the power plant only ran from January 29 to April 13, 1945, then from January 3 to April 13, 1946 and in the winter of 1946/47, before it went into permanent operation. The final invoice of March 31, 1949 showed a total of 65,200,000 Swiss francs for the preparation. 55% of electricity production belongs to the Canton of Uri and 45% to the Canton of Ticino.

The plant uses this with the reservoirs Lucendro , north of the Gotthard pass in the catchment area of ​​the Reuss , and Sella in the catchment area of ​​the Ticino . The entire catchment area of ​​the two lakes is 23.3 square kilometers.

The water from the Lucendro reservoir is fed through a 4.8 km long inlet tunnel to a 1.9 km long pressure pipeline, which supplies the Lucendro headquarters in Airolo with water with a 996 meter gradient. In the machine house planned by Ticino architects Carlo Tami and Rino Tami , two Pelton turbines drive two electric generators with an installed output of 29  MW each . Around 100  GWh of electricity are generated annually .

The Sella reservoir is connected to the Sella headquarters via a 1 km long pressure line, which releases the water into the inlet tunnel from the Lucendro reservoir. In this small power station, which was built between 1990 and 1991, the water is used by a Francis turbine that drives a 2 MW generator.

The Tremola pumping station pumps water from Lago dei Morti and from a water intake on the Sella into the inlet tunnel. Two pumps with an output of 470 kW each are installed.

investment Names location Installation Machine house
[m. ü. M.]
el. power in MW Turbines Maximum raw fall height in m Expansion flow in m³ / s comment
Headquarters Lucendro 688922  /  153462 1947 1139 58 2 Pelton turbines 996 7.0 Lucendro is the name of the headquarters of Azienda Elettrica Ticinese, in the headquarters is called Airolo , but the whole power plant is called Lucendro .
Headquarters Sella 688040  /  156334 1991 2139 2 Francis turbine 117 2.0
Pumping station Tremola 686934  /  156288 1947 2041 1 2 storage pumps 89 1.2 Tremola is the name given to the pumping station by Azienda Elettrica Ticinese, in which the pumping station is called Tremola / Sella .

Situation map

Lucendro power plant

literature

Individual evidence

  1. District Administrator Uri (ed.): Report and motion of the Government Council of February 13, 2001 to the District Administrator to transfer the Lucendro concession from Atel to Atel Hydro Ticino SA . February 13, 2001 ( ur.ch [PDF]).
  2. Alpiq sells Alpiq Hydro Ticino SA. Alpiq, August 31, 2017 .;
  3. ^ "Guide through the Swiss water and electricity industry" 1949 Volume 2 page 620
  4. Federal Office for Energy SFOE (Ed.): Statistics of the hydropower plants in Switzerland . January 1, 2018 ( admin.ch - system numbers 600100 and 600200). Statistics of the hydropower plants in Switzerland ( Memento of the original from December 9, 2018 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.bfe.admin.ch
  5. a b c d Lucendro hydropower plant. Azienda Elettrica Ticinese, accessed December 9, 2018 .
  6. Impianto idroelettrico Lucendro. Azienda Elettrica Ticinese, accessed December 9, 2018 (Italian).
  7. Federal Office for Water Management (Ed.): Statistics of hydropower plants in Switzerland . 1st January 1973.
  8. a b Federal Office for Energy SFOE (Ed.): Statistics of the hydropower plants in Switzerland . January 1, 2018 ( admin.ch ). Statistics of the hydropower plants in Switzerland ( Memento of the original from December 9, 2018 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.bfe.admin.ch