Sōya main line

from Wikipedia, the free encyclopedia
Sōya main line
Diesel multiple unit “Super Sōya” at Onoppunai
Diesel multiple unit “Super Sōya” at Onoppunai
Sōya main line stretch
Route length: 259.4 km
Gauge : 1067 mm ( cape track )
Power system : partly 20 kV 50 Hz  ~
Maximum slope : 20 
Minimum radius : 200 m
Top speed: 120 km / h
Dual track : Asahikawa - Nagayama
Society: JR Hokkaidō
Route - straight ahead
Hakodate main line 1898–
BSicon exKBHFa.svgBSicon BHF.svgBSicon .svg
0.0 Asahikawa ( 旭川 ) 1898–
BSicon xKRWgxl + l.svgBSicon KRWgr + xr.svgBSicon .svg
BSicon STRr.svgBSicon STR.svgBSicon .svg
Furano line 1899–
BSicon exSTR + l.svgBSicon eABZgr.svgBSicon .svg
BSicon exLSTR.svgBSicon STR.svgBSicon .svg
BSicon exHST.svgBSicon HST.svgBSicon .svg
1.8 Asahikawa-Yojō ( 旭川 四条 ) 1957–
BSicon exSTRr.svgBSicon STR.svgBSicon .svg
Higashigawa Line 1927-1973
Bridge over watercourse (medium)
Ushishubetsu-gawa
Station, station
3.7 Shin-Asahikawa ( 新 旭川 ) 1922–
BSicon exKBSTaq.svgBSicon eABZgr.svgBSicon .svg
Nippon Paper Industries Co. 1939-1997
Gleisdreieck - straight ahead, to the right, ex from the right
Sekihoku main line 1922–
Station without passenger traffic
6.6 Kita-Asahikawa freight yard 1968–
BSicon .svgBSicon STR + GRZq.svgBSicon ELCe.svg
BSicon .svgBSicon eHST.svgBSicon .svg
7.2 Nishi-Nagayama ( 西 永 山 ) 1955-1967
Station, station
9.3 Nagayama ( 永 山 ) 1898–
Bridge over watercourse (medium)
Nagayama-shinkawa
Stop, stop
11.4 Kita-Nagayama ( 北 永 山 ) 1947–
   
Ishikari
Stop, stop
14.7 Minami-Pippu ( 南比布 ) 1955–
Station, station
17.1 Pippu ( 比 布 ) 1898–
Stop, stop
20.2 Kita-Pippu ( 北 比 布 ) 1955–
Bridge over watercourse (medium)
Pippu-gawa
Station, station
22.8 Ranru ( 蘭 留 ) 1898–
   
Hokkaidō Highway
Station, station
28.4 Shokari ( 塩 狩 ) 1924–
   
Hokkaidō Highway (2 ×)
Station, station
36.3 Wassamu ( 和 寒 ) 1899–
Stop, stop
41.4 Higashi Rokusen ( 東 六 線 ) 1956–
Bridge over watercourse (medium)
Kembuchi-gawa
Station, station
45.2 Kembuchi ( 剣 淵 ) 1900–
Stop, stop
50.2 Kita-Kembuchi ( 北 剣 淵 ) 1959–
Bridge over watercourse (medium)
Inūshibetsu-gawa
Bridge over watercourse (medium)
Kembuchi-gawa
BSicon uexKHSTa.svgBSicon BHF.svgBSicon .svg
53.9 Shibetsu ( 士 別 ) 1900–
BSicon uexSTRr.svgBSicon STR.svgBSicon .svg
← Shibetsu train 1920-1959
BSicon .svgBSicon eABZgl.svgBSicon exKBSTeq.svg
Nippon Beet Sugar Co. 1936-1986
   
Teshio-gawa
Stop, stop
58.3 Shimo Shibetsu ( 下士 別 ) 1955–
Stop, stop
61.7 Tayoro ( 多 寄 ) 1903–
Stop, stop
64.5 Mizuho ( 瑞 穂 ) 1956–
Station, station
68.1 Fūren ( 風 連 ) 1903–
Bridge over watercourse (medium)
Fūrenbetsu-gawa
Stop, stop
72.6 Higashi-Fūren ( 東風 連 ) 1956–
BSicon .svgBSicon eABZg + l.svgBSicon exKBSTeq.svg
Hokuyōseishi Co. 1961-1996
BSicon .svgBSicon eABZg + l.svgBSicon .svg
Shinmei lineage 1937-1995
BSicon .svgBSicon eABZg + r.svgBSicon .svg
Nayoro main line 1919-1989
Station, station
76.2 Nayoro ( 名 寄 ) 1903–
Bridge over watercourse (medium)
Nayoro-gawa
Stop, stop
80.2 Nisshin ( 日 進 ) 1959–
BSicon .svgBSicon eHST.svgBSicon .svg
84.9 Chitō ( 智 東 ) 1924-2006
Stop, stop
89.3 Hokusei ( 北 星 ) 1959–
Stop, stop
91.2 Chiebun ( 智 恵 文 ) 1911–
Stop, stop
93.3 Chihoku ( 智 北 ) 1959–
Stop, stop
95.6 Minami-Bifuka ( 南美 深 ) 1956–
Bridge over watercourse (medium)
Penkeniupu-gawa
BSicon .svgBSicon eABZg + r.svgBSicon .svg
Bikō line 1964-1985
Station, station
98.3 Bifuka ( 美 深 ) 1911–
Stop, stop
101.9 Hatsuno ( 初 野 ) 1948–
Stop, stop
105.0 Momponai ( 紋 穂 内 ) 1911–
Stop, stop
112.1 Onnenai ( 恩 根 内 ) 1911–
Station, station
117.9 Toyoshimizu ( 豊 清水 ) 1946–
Stop, stop
121.5 Teshiogawa Onsen
Route - straight ahead
( 天 塩 川 温泉 ) 1956–
Stop, stop
124.7 Sakkuru ( 咲 来 ) 1912–
Station, station
129.3 Otoineppu ( 音 威 子 府 ) 1912–
BSicon .svgBSicon eABZgr.svgBSicon .svg
Tenpoku line 1914-1989
Stop, stop
135.6 Osashima ( 筬 島 ) 1922–
BSicon .svgBSicon eBST.svgBSicon .svg
143.1 Dodge Kamiji 1922-1985
Station, station
153.8 Saku ( 佐 久 ) 1922–
BSicon .svgBSicon eHST.svgBSicon .svg
158.2 Kotohira ( 琴 平 ) 1955-1990
Station, station
161.9 Teshio-Nakagawa ( 天 塩 中 川 ) 1922–
BSicon .svgBSicon eHST.svgBSicon .svg
165.8 Shimo-Nakagawa ( 下 中 川 ) 1955-2001
Stop, stop
170.3 Utanai ( 歌 内 ) 1923–
BSicon uexSTR + r.svgBSicon STR.svgBSicon .svg
← Horonobe urban train 1930-1971
BSicon uexKHSTe.svgBSicon HST.svgBSicon .svg
175.8 Toikambetsu ( 問 寒 別 ) 1923–
Bridge over watercourse (medium)
Toikambetsu-gawa
Stop, stop
178.0 Nukanan ( 糠 南 ) 1955–
BSicon .svgBSicon eHST.svgBSicon .svg
181.5 Kami-Onoppunai ( 上 雄 信 内 ) 1955-2001
BSicon .svgBSicon eKRWgl.svgBSicon exKRW + r.svg
old route 1923-1965
BSicon .svgBSicon TUNNEL1.svgBSicon exSTR.svg
Shimodaira tunnel (1256 m)
BSicon .svgBSicon eKRWg + l.svgBSicon exKRWr.svg
new route 1965–
Station, station
183.7 Onoppunai ( 雄 信 内 ) 1925–
Stop, stop
189.7 Yasuushi ( 安 牛 ) 1925–
Stop, stop
191.6 Minami horonobe ( 南 幌 延 ) 1959–
Stop, stop
194.6 Kami horonobe ( 上 幌 延 ) 1925–
Bridge over watercourse (medium)
Penkeopoppe-gawa
BSicon uexSTR + r.svgBSicon STR.svgBSicon .svg
← Horonuma line 1929-1948
BSicon uexKHSTe.svgBSicon BHF.svgBSicon .svg
199.4 Horonobe ( 幌 延 ) 1925–
BSicon .svgBSicon eABZgl.svgBSicon .svg
Haboro line 1935-1987
BSicon .svgBSicon eHST.svgBSicon .svg
205.6 Minami-Shimonuma ( 南下 沼 ) 1957-2006
Stop, stop
207.2 Shimonuma ( 下 沼 ) 1926–
BSicon .svgBSicon eABZg + r.svgBSicon .svg
← Horonobe coal train 1940-1972
Station, station
215.9 Toyotomi ( 豊 富 ) 1926–
Stop, stop
220.9 Tokumitsu ( 徳 満 ) 1926–
BSicon .svgBSicon eHST.svgBSicon .svg
226.6 Ashikawa ( 芦 川 ) 1926-2001
Station, station
230.9 Kabutonuma ( 兜 沼 ) 1924–
BSicon .svgBSicon STR.svgBSicon uexSTR + l.svg
→ Yūchi line 1944-1958
BSicon .svgBSicon HST.svgBSicon uexKHSTe.svg
236.7 Yūchi ( 勇 知 ) 1924–
Station, station
245.0 Bakkai ( 抜 海 ) 1924–
BSicon .svgBSicon eABZg + r.svgBSicon .svg
Tenpoku line 1922-1989
Station, station
256.7 Minami-Wakkanai ( 南 稚 内 ) 1922–
BSicon .svgBSicon eABZg + r.svgBSicon .svg
← Urban port railway
   
259.4 Wakkanai ( 稚 内 ) 1928–
BSicon .svgBSicon exHST.svgBSicon .svg
Wakkanai-sanbashi ( 稚 内 桟 橋 ) 1938-1945
BSicon .svgBSicon exTRAJEKT.svgBSicon .svg
Ferry to Ōdomari ( Korsakow ) 1923-1945

The Sōya main line ( Japanese 宗 谷 本 線 , Sōya-honsen ) is a railway line on the Japanese island of Hokkaidō , which is operated by the Hokkaido Railway Company (JR Hokkaido). It runs from Asahikawa via Nayoro to Wakkanai and is the most northerly stretch of the country. The name is derived from the sub-prefecture Sōya . The oldest part of the line opened in 1898 and was completed in 1928.

description

As is usual in Japan, the main Sōya line is laid in Kapspur (1067 mm). In terms of passenger transport, it opens up 53 train stations and stops, plus a freight station operated by JR Freight on the northern outskirts of Asahikawa. The predominantly single-lane route is 259.4 km long and is used by diesel trains. The only exception is the 6.6 km long section between the Asahikawa station and the Kita-Asahikawa freight station in the far south : this section has two lanes and is electrified with 20 kV 50 Hz alternating current so that electric freight trains can also run there.

The maximum speed between Asahikawa and Nayoro is 120 km / h and 95 km / h on the rest of the route. The Sōya Main Line, one of the longest railway lines in Japan, runs largely through mountainous terrain and sparsely populated areas. For this reason, accidents with wildlife are quite common. In addition, the section between Nayoro and Wakkanai is affected by unstable geological conditions and regularly occurring storm damage.

Trains

In long-distance traffic, JR Hokkaido offers three pairs of express trains a day. One of them is the Super Sōya from Sapporo to Wakkanai . The other two are the Sarobetsu trains between Asahikawa and Wakkanai. A connection to and from Sapporo is offered in Asahikawa. The Asahikawa – Wakkanai route takes about 3 hours and 45 minutes by train. All of these trips are carried out with tilting diesel multiple units of the type KiHa261.

The local transport offer depends on the different low population density of the regions passed through. In the section between Asahikawa and Nayoro , passenger trains run approximately every one to two hours. The section between Nayoro and Otoineppu is driven four times a day, the section between Otoineppu and Wakkanai three times a day.

history

The Japanese Reichstag passed the Hokkaidō Railway Construction Act in 1896, which obliged the state to promote the economic development of the island by building railway lines. For this purpose, the state company Hokkaidō Kansetsu Tetsudō was founded, which among other things had the order to build a line from Asahikawa to the north of the island. On August 12, 1898, it opened the first section of the line between Asahikawa and Nagayama, which was initially called the Teshio Line ( 天 塩 線 , Teshio-sen ). Short extensions followed in stages: on November 25, 1898 to Ranru, on November 15, 1899 to Wassamu, on August 5, 1900 to Shibetsu and on September 3, 1903 to Nayoro .

On April 1, 1905, the Hokkaidō Kansetsu Tetsudō went on in the newly created Railway Office (later the Railway Ministry ). In the same year, after the Russo-Japanese War , Japan was awarded the southern half of Sakhalin Island . Then the decision was made to continue the Teshio Line to the northern tip of Hokkaidō to create a connection to the new Karafuto Prefecture . On November 3, 1911, the Railway Authority opened the Nayoro – Onnenai section and on September 21, 1912, the entire previously constructed line was named Sōya Line ( 宗 谷 線 , Sōya-sen ). A few weeks later, on November 5, 1912, it reached Otoineppu .

It was actually planned to continue building the Sōya line from Otoineppu via Horonobe immediately . However, the Ministry of Railways decided to establish an alternative route along the coast of the Sea of Okhotsk first , even though it was over 20 kilometers longer. The line , later called the Tenpoku Line , was temporarily considered part of the Sōya Line. It was built in six stages and reached the terminus of Wakkanai (today Minami-Wakkanai ) on November 1, 1922.

The section from Otoineppu to Teshio-Nakagawa, which was opened on November 9, 1922, formed the first part of the originally planned route, which was given the provisional designation Teshio-Südlinie ( 天 塩 南 線 , Teshio-nan-sen ). This was extended to Toikambetsu on November 10, 1923. Next came the section from Minami-Wakkanai to Kabutonuma, which went into operation on June 25, 1924 as the Teshio Northern Line ( 天 塩 北 線 , Teshio-hoku-sen ). On July 20, 1925, the southern line reached Horonobe . The gap between Horonobe and Kabutonuma was closed on September 25, 1926, making the northernmost city of Hokkaidōs accessible on two different routes. The new continuous connection was now called the Teshio Line. Another extension was added on December 26, 1928, from Minami-Wakkanai to the new Wakkanai-minato port station (today's Wakkanai station ). The Sōya line between Asahikawa and Otoineppu and the subsequent Teshio line have been referred to as the Sōya main line since April 1, 1930.

As early as May 1, 1923, there was a ferry line operated by the Ministry of Railways between the cities of Wakkanai and Ōdomari (today Korsakow ) on the southern tip of Sakhalin on the La Pérouse road . To improve the transfer relationships, a track was laid on the pier north of the port station and on October 1, 1938, a stop called Wakkanai-sanbashi was established there. When the Red Army occupied the southern half of Sakhalin shortly before the end of the Pacific War and drove out the Japanese living there, this stop lost its function. It was closed on August 25, 1945 and the railway line for passenger traffic was withdrawn to the port station on the same day.

With the cessation of traffic to Sakhalin, the Sōya main line lost its importance. The Japanese State Railways , responsible from 1949, first used diesel multiple units in 1956 . South of Onoppunai, the route led through an area that was very often affected by avalanches and landslides . The 1256 m long Shimodaira tunnel, which went into operation on July 15, 1965, was built there to increase operational safety. The 3.7 km long section between Asahikawa and Shin-Asahikawa was relocated to a viaduct and double-tracked; the work was completed on September 29, 1973. On May 5, 1975, the last train pulled by a steam locomotive ran between Asahikawa and Horonobe , and 13 days later also on the remaining route to Wakkanai.

As a result of the state railroad privatization , the Sōya main line went into the possession of the new company JR Hokkaido on April 1, 1987 , while JR Freight took over the freight traffic. The double lane was extended by another 2.9 km to the Kita-Asahikawa freight yard on November 4, 2002, and the entire double-track section was electrified on May 10, 2003 . In November 2016, JR Hokkaido announced an extensive rationalization program, which affects the Nayoro – Wakkanai section, among other things. The railway company wants to persuade the neighboring communities to bear part of the operating and maintenance costs. Should no agreement be reached by 2019, shutdown would also be conceivable. However, such a measure would run counter to plans to build a Sakhalin-Hokkaidō tunnel .

List of train stations

Surname km Connecting lines location place
A28 Asahikawa ( 旭川 ) 000.0 Hakodate main line
Furano line
Coord. Asahikawa
A29 Asahikawa-Yojō ( 旭川 四条 ) 001.8 Coord.
A30 Shin-Asahikawa ( 新 旭川 ) 003.7 Sekihoku main line Coord.
W31 Nagayama ( 永 山 ) 009.3 Coord.
W32 Kita-Nagayama ( 北 永 山 ) 011.4 Coord.
W33 Minami-Pippu ( 南比布 ) 014.7 Coord. Pippu
W34 Pippu ( 比 布 ) 017.1 Coord.
W35 Kita-Pippu ( 北 比 布 ) 020.2 Coord.
W36 Ranru ( 蘭 留 ) 022.8 Coord.
W37 Shiokari ( 塩 狩 ) 028.4 Coord. Wassamu
W38 Wassamu ( 和 寒 ) 036.3 Coord.
W39 Higashi Rokusen ( 東 六 線 ) 041.4 Coord. Kembuchi
W40 Kembuchi ( 剣 淵 ) 045.2 Coord.
W41 Kita-Kembuchi ( 北 剣 淵 ) 050.2 Coord.
W42 Shibetsu ( 士 別 ) 053.9 Coord. Shibetsu
W43 Shimo Shibetsu ( 下士 別 ) 058.3 Coord.
W44 Tayoro ( 多 寄 ) 061.7 Coord.
W45 Mizuho ( 瑞 穂 ) 064.5 Coord.
W46 Fūren ( 風 連 ) 068.1 Coord. Nayoro
W47 Higashi-Fūren ( 東風 連 ) 072.6 Coord.
W48 Nayoro ( 名 寄 ) 076.2 Coord.
W49 Nisshin ( 日 進 ) 080.2 Coord.
W50 Hokusei ( 北 星 ) 089.3 Coord.
W51 Chiebun ( 智 恵 文 ) 091.2 Coord.
W52 Chihoku ( 智 北 ) 093.3 Coord.
W53 Minami-Bifuka ( 南美 深 ) 095.6 Coord. Bifuka
W54 Bifuka ( 美 深 ) 098.3 Coord.
W55 Hatsuno ( 初 野 ) 101.9 Coord.
W56 Momponai ( 紋 穂 内 ) 105.0 Coord.
W57 Onnenai ( 恩 根 内 ) 112.1 Coord.
W58 Toyoshimizu ( 豊 清水 ) 117.9 Coord.
W59 Teshiogawa Onsen ( 天 塩 川 温泉 ) 121.5 Coord. Otoineppu
W60 Sakkuru ( 咲 来 ) 124.7 Coord.
W61 Otoineppu ( 音 威 子 府 ) 129.3 Coord.
W62 Osashima ( 筬 島 ) 135.6 Coord.
W63 Saku ( 佐 久 ) 153.6 Coord. Nakagawa
W64 Teshio-Nakagawa ( 天 塩 中 川 ) 161.9 Coord.
W65 Utanai ( 歌 内 ) 170.3 Coord.
W66 Toikambetsu ( 問 寒 別 ) 175.8 Coord. Horonobe
W67 Nukanan ( 糠 南 ) 178.0 Coord.
W68 Onoppunai ( 雄 信 内 ) 183.7 Coord.
W69 Yasuushi ( 安 牛 ) 189.7 Coord.
W70 Minami horonobe ( 南 幌 延 ) 191.6 Coord.
W71 Kami horonobe ( 上 幌 延 ) 194.6 Coord.
W72 Horonobe ( 幌 延 ) 199.4 Coord.
W73 Shimonuma ( 下 沼 ) 207.2 Coord.
W74 Toyotomi ( 豊 富 ) 215.9 Coord. Toyotomi
W75 Tokumitsu ( 徳 満 ) 220.9 Coord.
W76 Kabutonuma ( 兜 沼 ) 230.9 Coord.
W77 Yūchi ( 勇 知 ) 236.7 Coord. Wakkanai
W78 Bakkai ( 抜 海 ) 245.0 Coord.
W79 Minami-Wakkanai ( 南 稚 内 ) 256.7 Coord.
W80 Wakkanai ( 稚 内 ) 259.4 Coord.

Web links

Commons : Sōya main line  - collection of images, videos and audio files

Individual evidence

  1. 平 成 26 年 3 月 ダ イ ヤ 改正 に つ い て . (PDF) JR Hokkaido, December 24, 2013, accessed April 4, 2017 (Japanese).
  2. 当 社 単 独 で は 維持 す る こ と が 困難 な 線 区 . (PDF) JR Hokkaido, November 18, 2016, accessed April 4, 2017 (Japanese).
  3. Notice to Passengers ... JR Hokkaido, February 27, 2017, accessed on May 29, 2020 .
  4. ^ Trains bound for Wakkanai. JR Hokkaido, April 3, 2020, accessed May 29, 2020 .
  5. a b Kazuo Tanaka: 写真 で 見 る 北海道 の 鉄 道 (Hokkaidō's railroad in photos) . tape 1 . Hokkaidō Shinbunsha, Sapporo 2002, ISBN 978-4-89453-220-5 , pp. 314 .
  6. a b c Tanaka: 写真 で 見 る 北海道 の 鉄 道 , pp. 88–89.
  7. a b Tanaka: 写真 で 見 る 北海道 の 鉄 道 , pp. 90–91.
  8. a b Tanaka: 写真 で 見 る 北海道 の 鉄 道 , pp. 266–267.
  9. Satoru Sone: 週刊 歴 史 で め ぐ る 鉄 道 全 路線 国 鉄 ・ JR . tape 20 . Asahi Shimbunsha, Osaka 2009, p. 15 .
  10. Sone: 週刊 歴 史 で め ぐ る 鉄 道 全 路線 国 鉄 ・ JR . P. 16.
  11. Sone: 週刊 歴 史 で め ぐ る 鉄 道 全 路線 国 鉄 ・ JR . P. 17.
  12. JR Hokkaido says it can't maintain half of its railways. The Japan Times , November 19, 2016, accessed April 4, 2017 .
  13. Russia dreams of Trans-Siberian Railway link to Hokkaido. Asahi Shimbun , December 12, 2016, accessed April 4, 2017 .