Lockheed Martin F-35 Lightning II: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Reverted unexplained changes by 20.133.0.14; LM is the the lead contractor, and there are other indus. partners
→‎Related content: Moved F-22 to "Related" field, which is where we should have had it to begin with ("Duh!" to myself for missing that!)
Line 239: Line 239:
{{aircontent
{{aircontent
|related=
|related=
* [[F-22 Raptor]]
* [[Lockheed Martin X-35]]
* [[Lockheed Martin X-35]]


Line 246: Line 247:
* [[Dassault Rafale]]
* [[Dassault Rafale]]
* [[Eurofighter Typhoon]]
* [[Eurofighter Typhoon]]
* [[F-22 Raptor|Lockheed Martin F-22 Raptor]]
* [[Mikoyan Project 1.44]]
* [[Mikoyan Project 1.44]]
* [[Yakovlev Yak-141]]
* [[Yakovlev Yak-141]]

Revision as of 15:53, 16 March 2007

Template:Infobox Aircraft

The F-35 Lightning II—descended from the X-35 of the Joint Strike Fighter (JSF) program—is a single-seat, single-engined military strike fighter, a multi-role aircraft that can perform close air support, tactical bombing, and air-to-air combat. Its development is being funded by the United States, the United Kingdom, and other partner governments. It is being designed and built by an aerospace industry team led by Lockheed Martin and major partners BAE Systems and Northrop Grumman. Demonstrator aircraft flew in 2000;[1] a production model first took flight on 15 December 2006.[2]

Requirement

Original F-35 Joint Strike Fighter Logo
File:F35LightIIlogo.jpg
F-35 Lightning II/JSF Logo

The JSF program was created to replace various aircraft while keeping development, production, and operating costs down. This was pursued by building three variants of one aircraft, sharing 80% of their parts:

International participation

The primary customers and financial backers are the United States and the United Kingdom. Eight other nations are also funding the aircraft's development and will decide in 2006 whether or not to purchase it. Total program development costs are estimated at over US$40 billion (underwritten largely by the United States), while procurement of an estimated 2,400 planes is expected to be an additional US$200 billion.[3]

There are three levels of international participation. The United Kingdom is the sole 'Level 1' partner, contributing slightly over US$2 billion, about 10% of the development costs.[4] This is a result of a 1995 Memorandum of Understanding which saw the UK officially join the Joint Strike Fighter project.[5] Level 2 partners are Italy, which is contributing US$1 billion, and the Netherlands, US$800 million. Level 3 partners are Canada, US$440 million; Turkey, US$175 million; Australia, US$144 million; Norway, US$122 million; and Denmark, US$110 million. The levels generally reflect the financial stake in the program, the amount of technology transfer and subcontracts open for bid by national companies, and the priority order in which countries can obtain production aircraft. Israel and Singapore have also joined as Security Cooperative Participants.[6]

Some of the partner countries have wavered in their public commitment to the JSF program, hinting or warning that unless they receive more subcontracts or technology transfer, they will forsake JSF for the Eurofighter Typhoon, Gripen, Dassault Rafale or simply upgrade their existing aircraft. Norway has several times threatened to put their support on hold unless substantial guarantees for an increased industrial share is provided. Despite this Norway has signed all the Memorandums of Understanding, including the latest one detailing the future production phase of the JSF program. They have, however, indicated that they will increase and strenghten their cooperation with both competitors of the JSF, the Eurofighter Typhoon and the Gripen. "[7]

United Kingdom participation

The UK became increasingly frustrated by a lack of US commitment to grant access to the technology that would allow the UK to maintain and upgrade its F-35s without US involvement. For five years, British officials sought an ITAR waiver to secure greater technology transfer. This request, which has the blessing of the Bush administration, has been repeatedly blocked by US Representative Henry Hyde, who says that the UK needs to tighten its laws protecting against the unauthorized transfer of the most advanced US technology to third parties.[8]

BAE Systems CEO Mike Turner complained that the US had denied his company access to the aircraft's source code. On 21 December 2005, an article in the Glasgow Herald quoted the chairman of the House of Commons Defence Select Committee as saying "the UK might have to consider whether to continue in the programme" if no access were granted.[9] Lord Drayson, Minister for Defence Procurement, took a firmer stance during a March 2006 visit to Washington: "We do expect the software technology transfer to take place. But if it does not take place we will not be able to purchase these aircraft," and he said there was a 'Plan B' if the deal fell through.[10] This may have been the development of a navalized Typhoon.[11]

On 27 May 2006, President George W. Bush and Prime Minister Tony Blair announced that "Both governments agree that the UK will have the ability to successfully operate, upgrade, employ, and maintain the Joint Strike Fighter such that the UK retains operational sovereignty over the aircraft."[12] Despite this, concerns were still expressed about the lack of technology transfer as late as December 2006. Nevertheless, on 12 December 2006, Lord Drayson signed an agreement which met the UK's demands for further participation, i.e., access to software source codes and operational sovereignty. The agreement allows "an unbroken British chain of command" for operation of the aircraft. Drayson said Britain would "not be required to have a US citizen in our own operational chain of command". [13] Drayson also said, however, that Britain is still considering an unspecified "Plan B" alternative to buying the Joint Strike Fighter.

Australian participation

Australian Minister for Defence Dr Brendan Nelson signing the JSF Production, Sustainment and Follow-on Development Memorandum of Understanding in December 2006.

In May 2005, the Australian government announced that it would delay its planned 2006 decision on buying the JSF to 2008, and thus past the term of the present government. Australia, like the UK, has insisted it must have access to all software needed to modify and repair aircraft. Analysis conducted by the Royal Australian Air Force has determined that the F-35 "is the most suitable aircraft for Australia’s needs".[14]

There has been debate in Australia over whether the F-35 is the most suitable aircraft for the RAAF. Some media reports, lobby groups and politicians have raised doubts that the aircraft will be ready in time to replace the RAAF's aging fleet of General Dynamics F-111 strike aircraft and F/A-18 Hornet fighters. Some critics say the F-22 or the Eurofighter may be better choices, both offering better range, dogfighting capability, and supercruise at a cost that may not be much more than the F-35[15] — claims that as of July 2006 are being examined in a parliamentary inquiry.[16]

In a statement released in early August 2006, Australian Defence Minister Dr. Brendan Nelson revealed that whilst the F-35 still had governmental support, Australia is starting to investigate other possible aircraft should the F-35 prove to be unfeasible.[17] In October 2006 the deputy chief of the Air Force, Air Vice Marshal John Blackburn, publicly stated that the RAAF had ruled out the purchase of interim strike aircraft to cover any delays to the F-35 program and believed that the F-35 was suitable.[18] However, on the 6th of March 2007, Australian Defence Minister Brendan Nelson announced the Australian Government would purchase 24 F/A-18F Super Hornets from Boeing to fill the gap left by the retiring F-111 strike bombers at a cost of potentially A$6 billion.[19]

On 13 December 2006, Minister Nelson signed the JSF Production, Sustainment and Follow-on Development Memorandum of Understanding. This agreement provides the cooperative framework for the acquisition and support of the JSF over its life.[20] Australia is expected to purchase 100 F-35As at a cost of approximately $12 billion AUD.[21]

JSF Program history

Origins and X-32 vs. X-35

File:X-32 X-35 Cdp misc 004.jpg
Boeing X-32 (left) and Lockheed Martin X-35 prior to down-select in 2001, where the X-35 was chosen. DoD photo

The Joint Strike Fighter evolved out of several requirements for a common fighter to replace existing types. The actual JSF development contract was signed on 16 November 1996.

The contract for System Development and Demonstration (SDD) was awarded on 26 October 2001 to Lockheed Martin, whose X-35 beat the Boeing X-32. DoD officials and the UK Minister of Defence Procurement said the X-35 consistently outperformed the X-32, although both met or exceeded requirements. The designation of the fighter as "F-35" came as a surprise to Lockheed, which had been referring to the aircraft in-house by the designation "F-24."[22]

On February 19, 2006, the first F-35 (USAF version) was rolled out in Fort Worth, Texas. The aircraft underwent extensive ground testing at Edwards Air Force Base in fall 2006. On September 15, 2006 the first engine run of the F135 afterburning turbofan was conducted in an airframe, with the tests completed on 18 September after a static run with full afterburner. The engine runs were the first time that the F-35 was completely functional on its own power systems.[23] On December 15, 2006, the F-35 completed its maiden flight.

Naming

On July 7 2006, the U.S. Air Force officially announced the name of the F-35: Lightning II,[24] in honor of Lockheed's World War II-era twin-prop P-38 Lightning and the Cold War-era jet English Electric Lightning. English Electric's aircraft division was incorporated into BAC, a predecessor of F-35 partner BAE Systems. Other names previously listed as contenders were Kestrel, Phoenix, Piasa, Black Mamba, and Spitfire II. Lightning II was also an early company name for the aircraft that became the F-22 Raptor.

Variants

The F-35 is planned to be built in three different versions to suit the needs of its various users.

F-35A

The F-35A is the smallest, lightest version of the F-35 series. It is primarily intended to replace both the U.S. Air Force's F-16 Fighting Falcons and A-10 Thunderbolt IIs. Of the three F-35 variants, only the F-35A is equipped with an internal gun, the GAU-12/U. This 25 mm cannon, a development of the 20 mm M61 Vulcan carried by USAF fighters since the F-104 Starfighter, is also carried by the USMC's AV-8B Harrier II.

The F-35A not only matches the F-16 in maneuverability, instantaneous and sustained high-g performance, but also outperforms it in stealth, payload, range on internal fuel, avionics, operational effectiveness, supportability, and survivability.[citation needed] It also has an internal laser designator and infra-red sensors.

F-35B

File:F-l3 lift fan.jpg
X-35B lift fan; the VTOL propulsion system is designed and manufactured by Rolls-Royce plc.

The F-35B STOVL aircraft is intended to replace the later derivatives of the Harrier Jump Jet, which was the world's first operational short-takeoff / vertical-landing fighter. The RAF and Royal Navy will use this variant to replace the Harrier GR9s. The U.S. Marine Corps will use the F-35B to replace both its AV-8B Harrier II and F/A-18 Hornet fighters. The F-35B is similar in size to the Air Force F-35A, trading fuel volume for vertical flight systems. Like the Harrier, guns will be carried in a ventral pod. Vertical flight is by far the riskiest, and in the end, a decisive factor in design.

Instead of lift engines, or rotating nozzles on the engine fan and exhaust like the Pegasus-powered Harrier, the F-35B uses an innovative shaft-driven Lift Fan, patented by Lockheed Martin and developed by Rolls-Royce.[25] Somewhat like a turboprop embedded into the fuselage, engine shaft power is diverted forward via a clutch-and-bevel gearbox to a vertically mounted, contra-rotating lift fan located forward of the main engine in the center of the aircraft. Bypass air from the cruise engine turbofan exhausts through a pair of roll-post nozzles in the wings on either side of the fuselage, while the lift fan balances the vectoring cruise nozzle at the tail.

In effect, the F-35B power plant acts as a flow multiplier, much as a turbofan achieves efficiencies by moving unburned air at a lower velocity, and getting the same effect as the Harrier's huge, but supersonically impractical, main fan. Like lift engines, this added machinery is dead weight during flight, but increased lifting power increases takeoff payload by even more. The cool fan also reduces the harmful effects of hot, high-velocity air which can harm runway pavement or an aircraft carrier deck. Though potentially risky and complicated, it was made to work to the satisfaction of DOD officials.

During concept definition, two Lockheed airframes were flight-tested: the Lockheed X-35A (which was later converted into the X-35B), and the larger-winged X-35C.[26] Both the Boeing X-32 and X-35 power plants were derived from Pratt & Whitney's F119, with the STOVL variant of the latter incorporating a Rolls-Royce Lift Fan module.

Arguably the most persuasive demonstration of the X-35's capability was the final qualifying Joint Strike Fighter flight trials, in which the X-35B STOVL aircraft took off in less than 500 feet, went supersonic, and landed vertically -- a feat that Boeing's entry was unable to achieve.[27]

F-35C

The F-35C naval variant will have a larger, folding wing and larger control surfaces for improved low-speed control, and stronger landing gear for the stresses of carrier landings. The larger wing area provides increased range and payload, with twice the range on internal fuel compared with the F/A-18C Hornet, achieving much the same goal as the much heavier F/A-18E/F Super Hornet. The U.S. Navy intends to buy 480 F-35Cs to replace the F/A-18A, -B, -C, and -D Hornets, which replaced subsonic but long-ranged attack types such as the A-7 Corsair and A-6 Intruder. It will also serve as a stealthier complement to the Super Hornet. [28]

Design characteristics

The F-35A being towed at its inauguration ceremony on 7 July 2006.

The F-35 appears to be a smaller, slightly more conventional, one-engine sibling of the sleeker, two-engine F-22 Raptor, and indeed, drew elements from it. The exhaust duct design was inspired by the General Dynamics Model 200, a 1972 VTOL aircraft designed for the Sea Control Ship.[29]

Lockheed had some contact with the Yakovlev Design Bureau in the 1990s, which has led to some speculation about ties with the quite different Yakovlev Yak-141 'Freestyle'.[30]

Stealth technology makes the aircraft hard to detect as it approaches short-range tracking radar.

Some improvements over current-generation fighter aircraft are:

  • Durable, low-maintenance stealth technology;
  • Integrated avionics and sensor fusion that combine information from off- and onboard sensors to increase the pilot's situational awareness and improve identification and weapon delivery, and to relay information quickly to other command and control (C2) nodes;
  • High speed MIL-STD-1394B data networking[31]
  • Low life-cycle costs.

Although helmet-mounted displays have already been integrated into some fourth-generation fighters such as the Swedish JAS 39 Gripen, the F-35 will be the first in which helmet-mounted displays replace a heads-up display altogether.[32]

Thrust-to-weight ratio

The F-35B variant was in danger of missing performance requirements because it weighed too much — reportedly, by one metric ton (2,200 pounds) or 8%. In response, Lockheed Martin added engine thrust and shed more than a ton by thinning the aircraft's skin; shrinking the weapons bay and vertical tails; rerouting some thrust from the roll-post outlets to the main nozzle; and redesigning the wing-mate joint, portions of the electrical system, and the portion of the aircraft immediately behind the cockpit.[33]

The internal weapons are stored offline to the external air flow, which will complicate weapons certification testing.[citation needed]

Manufacturing responsibilities

Specifications (F-35 Lightning II)

File:Sdd f35test 009.jpg
The F-35 Lightning II takes to the air for the first time on 15 December 2006

Some information is estimated. General characteristics

  • Crew: 1
  • Secondary (High Performance), in development: 1× General Electric/Rolls-Royce F136 afterburning turbofan, >178 kN (40,000 lbf)
  • Lift fan (STOVL): 1× Rolls-Royce Lift System in conjunction with either F135 or F136 power plant, 18,000 lbf (80 kN)

Performance

F-35A and F-35C Armament

Armament

  • 1 × GAU-12/U 25 mm cannon — slated to be mounted internally with 180 rounds in the F-35A and fitted as an external pod with 220 rounds in the F-35B and F-35C.
  • Internally (current planned weapons for integration) — up to four AIM-120 AMRAAM, AIM-9X Sidewinder or AIM-132 ASRAAM internally or two air-to-air and two air-to-ground weapons (up to two 2,000 lb weapons in A and C models; two 1000 lb weapons in the B model) in the bomb bays. These could be AMRAAM, the Joint Direct Attack Munition (JDAM) — up to 2,000 lb (910 kg), the Joint Standoff Weapon (JSOW), Small Diameter Bombs (SDB) — a maximum of 4 in each bay, the Brimstone anti-armor missiles, Cluster Munitions (WCMD) and High Speed Anti-Radiation Missiles (HARM). The MBDA Meteor air-to-air missile is currently being adapted to fit internally in the missile spots and may be integrated into the F-35.
  • At the expense of being more detectable by radar, many more missiles, bombs and fuel tanks can be attached on four wing pylons and two wingtip positions.[citation needed] The two wingtip pylons can only carry short-range air-to-air missiles (AIM-9s), while the Storm Shadow and Joint Air to Surface Stand-off Missile (JASSM) cruise missiles can be carried in addition to the stores already integrated. An air-to-air load of 12 AIM-120s and 2 AIM-9s is conceivable using internal and external weapons stations, as well as a configuration of six two thousand pound bombs, 2 AIM-120s, and 2 AIM-9s.

Directed-energy weapons

Directed-energy weapons may be installed in conventional takeoff F-35 Lightning IIs, whose lack of a direct lift fan frees up about 10 ft³ (0.28 m³) of space and whose engine provides more than 27,000 hp (20 MW) for electrical power.[35] Some concepts, including solid state lasers and high-power microwave beams, may be nearing operational status.[36]

Notes and references

  1. ^ Lockheed Martin statement
  2. ^ Lockheed Martin press release
  3. ^ Washington Post article, 2005-03-15
  4. ^ Team JSF.
  5. ^ "US, UK sign JAST agreement". Aerospace Daily. McGraw-Hill. 1995-11-25. p. 451. {{cite news}}: |access-date= requires |url= (help)
  6. ^ Katherine V. Schnasi Joint Strike Fighter Acquisition: Observations on the Supplier Base US Accounts Office. Retrieved 2006-02-08.
  7. ^ Defense Industry Daily F-35 Lightning II Faces Continued Dogfights in Norway
  8. ^ Financial Times UK denied waiver on US arms technology. Retrieved 2006-10-11.
  9. ^ UK Defence Committee Statement MoD 'slippage' set to leave forces with reduced capability, says committee UK Parliament. Retrieved 2006-02-08.
  10. ^ Matt Chapman Britain warns US over jet software codes vunet.com Retrieved 2006-03-16.
  11. ^ Evidence to UK Defence Select Committee. Retrieved 2006-04-01.
  12. ^ Financial Times Bush gives way over stealth fighter. Retrieved 2006-05-27.
  13. ^ "Update 2 — UK signs memo with US on Joint Strike Fighter". Reuters. 2006-12-12. Retrieved 2006-12-13.
  14. ^ "Joint Strike Fighter" (Press release). The Hon. Dr Brendan Nelson, Minister for Defence. 2007-02-01. Retrieved 2007-02-01. {{cite press release}}: Check date values in: |date= (help)
  15. ^ Related discussions and analyses on Air Power Australia web site although the F-22 is not for sale internationally.
  16. ^ Inquiry into Australian Defence Force Regional Air Superiority, Joint Standing Committee on Foreign Affairs, Defence, and Trade, Australian Parliament
  17. ^ US decisions 'threaten' fighter project. The Age, 4 August 2006. Retrieved 2006-08-19.
  18. ^ Max Blenkin RAAF 'won't need' interim jet. News.com.au. 2006-10-10.
  19. ^ "Australia to buy 24 F-18 Super Hornets from Boeing" (Press release). Thanhnien News. 2007-03-06. Retrieved 2007-03-06. {{cite press release}}: Check date values in: |date= (help)
  20. ^ Australia commits to F-35 strike fighter The Age, 2006-12-13.
  21. ^ Geoff Elliot Troubled stealth fighter tackles first test flight.The Australian. 2006-12-18.
  22. ^ Designation Systems.
  23. ^ "Mighty F-35 Lightning 2 Engine Roars To Life." Lockheed Martin news release, 2006-09-22.
  24. ^ "Lockheed Martin Joint Strike Fighter Officially Named 'Lightning II.'" Official Joint Strike Fighter program office press release. July 7 2006.
  25. ^ Lockheed Martin. Design News magazine's Engineer of the Year award goes to lift fan inventor at Lockheed Martin. 2004-02-26.
  26. ^ Joint Strike Fighter official site - History page
  27. ^ PBS: Nova transcript "X-planes"
  28. ^ http://www.fas.org/man/dod-101/sys/ac/f-35.htm FAS F-35
  29. ^ Vertiflight (Jan. 2004). Journal of the American Helicopter Society.
  30. ^ John Hayles. Yakovlev Yak-41 'Freestyle'. Aeroflight. March 28, 2005. Accessed August 6, 2006.
  31. ^ "The Electric Jet." Philips, E. H. Aviation Week & Space Technology. February 5, 2007.
  32. ^ Jenkins, Jim (2001). "Chief test pilot gives brief on F-35". dcmilitary.com. Retrieved 2006-04-10.
  33. ^ Fulghum, David A.; Wall, Robert (19 September 2004). USAF Plans for Fighters Change. Aviation Week and Space Technology Retrieved 2006-02-08.
  34. ^ a b "Lockheed-Martin Media Kit Fact Sheets (Zip File)".
  35. ^ Fulghum, David A. (8 July 2002). Lasers Being Developed for F-35 and AC-130. Aviation Week and Space Technology Retrieved 2006-02-08.
  36. ^ Fulghum, David A. (22 July 2002). Lasers, HPM Weapons Near Operational Status. Aviation Week and Space Technology Retrieved 2006-02-08.

Further reading

External links

Media

Template:Multi-video start Template:Multi-video item Template:Multi-video item Template:Multi-video item Template:Multi-video end

Related content

Related development

Aircraft of comparable role, configuration, and era

Related lists

Template:Link FA Template:Link FA