Autoceļš A8

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking street / Maintenance / LV-A
Autoceļš A8 in Latvia
Autoceļš A8
 E77-LV.svg
map
Course of the A8
Basic data
Operator: Latvijas Valsts ceļi Latvijas Valsts ceļi
Start of the street: Riga
( 56 ° 56 ′  N , 24 ° 8 ′  E )
End of street: Eleja
( 56 ° 22 '  N , 23 ° 40'  O )
Overall length: 76 km
Course of the road
node Riga A10 E22
node Baloži A5 E77
crossing Cena P100
Junction Jelgava P93
Roundabout Jelgava P94
Roundabout Eleja P103
EU border crossing Latvia - Lithuania
Lithuania Further on A12

Autoceļš A8 is a "State Main Road" ( lett . Valsts galvenie A utoceļi ) belonging to Latvia's state roads . It connects the capital Riga with the Lithuanian border near Meitene , where it continues as Magistralinis kelias A12 . The A8 is part of the European route 77 . The total length is 76 kilometers. The average traffic volume was 10,293 vehicles per day in 2010.

In 2011, the A8 at Jelgava was expanded like a motorway, the other sections were available with two lanes or as an alternating three-lane road . In 2011 work began on modernizing the A8 in two sections. The first section comprises a lane between the 10th and 19th kilometers and is to be completed by 2014 [obsolete] . The second section comprises the other, left-hand lane from 19th to 30th kilometers and is to be completed by 2013 [obsolete] . In October, the modernization of a third section began, which includes both lanes from 32 to 43 kilometers. The modernization should last until the end of 2014 [obsolete] . The investment costs 4.59 million lati .

According to the plans, the remaining sections of the A8 are to be modernized by 2020 and signposted as a motorway or motorway-like road.

Web links

Individual evidence

  1. Par četriem miljoniem renovēs autoceļu A8
  2. Informācija saistībā ar autoceļu finansējumu, pašreizējo stāvokli un turpmāk veicamajiem darbiem reģionos ( Memento of the original from June 24, 2014 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. (Latvian) @1@ 2Template: Webachiv / IABot / lvceli.lv
  3. Overview of all projects in the investment period up to 2013 on a map ( memento of the original from April 7, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. (Latvian) @1@ 2Template: Webachiv / IABot / lvceli.lv
  4. Overview of all projects in the investment period from 2014 to 2020 on a map ( memento of the original from September 20, 2013 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. (Latvian) @1@ 2Template: Webachiv / IABot / lvceli.lv