The E-Flexer class is a ferry class under construction from the Swedish shipping company Stena RoRo.
history
The RoPax - Ferries are from the Chinese AVIC-Weihai- shipyard built. The construction contract for four units, which are to be delivered in 2019 and 2020, was signed on March 11, 2016. An option for four more ships was also agreed in the construction contract.
The ships are to be used by Stena Line in the Irish Sea and operate between Holyhead and Dublin and Belfast and Liverpool .
Construction of the first ship, the Stena Estrid, began in August 2017, and the keel was laid on February 2, 2018. The Stena Estrid was delivered on November 15, 2019 . Since January 2020 it is between Holyhead and Dublin technology where the Stena Superfast X replaced.
The second ship of the class, the Stena Edda , was delivered on January 15, 2020 and has been in service between Belfast and Liverpool since March 2020, replacing the Stena Lagan there .
The third ship in the class, the Galicia , has been chartered to Brittany Ferries for an initial five years . It is due to be delivered in spring 2020 and will operate between the UK and Spain . It is adapted to Brittany Ferries' needs during construction. So it is z. B. get additional cabins for passengers.
In April 2018, Stena RoRo ordered a fifth ship in the series which, after delivery , will be chartered to DFDS Seaways for ten years with an option to buy . It is to be used under the name of Côte d'Opale in the English Channel between Calais and Dover.
In May 2018, a sixth ship was ordered, which will be delivered in 2021 and again chartered to Brittany Ferries. The ship, named Salamanca, will be powered by LNG.
In July 2018, Stena Line ordered two more ships of the class, which are to be delivered in 2022 and used in the Stena Line network. With a length of 239.7 meters and a loading capacity of 1,200 passengers and 3,600 lane meters, the ships will be larger than the previous ships in the class. At the same time, an option for three more ships in the class was agreed.
The first option was exercised in March 2019 with another ship to be chartered out to Britanny Ferries. The ship is to be named Santoña and will be completed in autumn 2023.
description
The ships were designed and energetically optimized by Stena together with Deltamarin and should emit 25% less CO 2 than the ferries previously used by Stena RoRo in the Irish Sea. It is powered by two twelve-cylinder - four stroke - diesel engines , each with 12,600 kW power . The engines are to be operated with marine diesel oil and prepared for a later installation of scrubbers and the conversion to drive with liquefied natural gas and methanol. The sixth ship in the series, the Salamanca , is to be built from the outset with a propulsion powered by liquefied natural gas.
There are 3,100 lane meters available on the RoRo decks . There is space for 927 passengers on board. The ships will be equipped with 175 cabins. The seventh and eighth ship of the class will be larger with 3,600 gauge meters and 1,200 passengers in 263 cabins.
units
E-Flexer class | ||||
---|---|---|---|---|
Building name | Build number | IMO number |
Keel laying, launching, delivery |
Later names and whereabouts |
Stena Estrid | W0263 | 9807293 | February 2, 2018 January 16, 2019 November 15, 2019 |
in motion |
Stena Edda | W0264 | 9807308 | June 15, 2018 April 15, 2019 January 15, 2020 |
in motion |
Stena Embla | W0266 | 9807322 | May 22, 2019 - - |
under construction |
Galicia | W0267 | 9856189 | January 16, 2019 September 10, 2019 - |
under construction |
Cote d'Opale | W0268 | 9858321 | October 15, 2019 May 2020 - |
under construction |
Salamanca | W0269 | 9867592 | January 16, 2019 - - |
under construction |
W0270 | 9862994 | under construction | ||
W0271 | 9863003 | under construction | ||
Santoña | W0272 | 9886847 |
Individual evidence
- ↑ a b Stena signs contract for four new RoPax ferries , press release, Stena RoRo, April 5, 2016.
- ↑ a b Stena Estrid. DNV GL, accessed on January 16, 2020 .
- ↑ a b Stena Edda. DNV GL, accessed on January 16, 2020 .
- ↑ a b Stena RoRo signs contract for new build for long-term charter to DFDS. Stena RoRo, April 26, 2018, accessed April 26, 2018 .
- ↑ Stena Line confirms plans for new ferries ( Memento from June 13, 2018 in the Internet Archive ), Hansa - International Maritime Journal , June 13, 2018.
- ^ A b Philippe Holthof: Brittany Ferries confirms charter of Chinese-built E-Flexer from Stena. Shippax, August 24, 2017, accessed November 9, 2017 .
- ↑ Keel laying for the first new Stena Line building in China. Ferries currently, February 6, 2018, accessed on February 6, 2018 .
- ↑ AVIC lays keel for first of Stena's E-Flexer ferries. Baird Maritime, February 6, 2018, accessed April 26, 2018 .
- ↑ AVIC Weihai delivers first Stena E-Flexer. Shippax, November 15, 2019, accessed November 16, 2019 .
- ^ Stena Line's Stena Edda goes into service with maiden voyage from Birkenhead to Belfast. March 9, 2020, accessed on March 10, 2020 .
- ^ Stena orders "Gas Ready" RoPax for charter to DFDS. MarineLog, April 26, 2018, accessed April 26, 2018 .
- ^ New vessels for Brittany Ferries UK-Spain routes. BBC News, May 24, 2018, accessed May 25, 2018 .
- ↑ Brittany Ferries prepares the renouvellement of the fleet. Mer et Marine, July 20, 2018, accessed July 20, 2018 (French).
- ↑ Stena RoRo signs contract for a ninth Stena E-flexer. Press release. Stena RoRo, March 27, 2019, accessed on January 17, 2020 .
- ↑ Brittany Ferries confirms fourth new cruise-ferry, post-Brexit. Press release. Britanny Ferries, March 26, 2019, accessed March 27, 2019 .
- ↑ Stena Stories - Full-Scale Models. Stena AB, accessed January 17, 2020 .
- ^ André Germann: Steel cut for the "E-Flexer" , THB - Deutsche Schiffahrtszeitung , August 31, 2017.
- ↑ a b c Facta om Fartyg: Stena Embla. Facta om Fartyg, accessed February 24, 2020 (Swedish).
- ↑ a b c d e f g new-ships.com. Retrieved March 4, 2020 .
- ↑ a b GALICIA floated, first steel cutting for SALAMANCA. Shippax, September 10, 2019, accessed September 11, 2019 .
- ^ Keel laid for new Dover - Calais Ferry. New Holyhead Ship Undertaking Sea Trials. NI Ferry Site, October 19, 2019, accessed February 5, 2020 .
- ^ New ferry for the channel reaches another milestone in construction. DFDS, October 18, 2019, accessed February 5, 2020 .
- ↑ DFDS: la construction du Côte d'Opale débute. Mer et Marine, June 3, 2019, accessed July 14, 2019 (French).
- ↑ https://www.facebook.com/shippax/photos/pb.171281966238128.-2207520000.1568354249./2610194025680231/?type=3&theater
- ^ M / S Salamanca. Facta om Fartyg, accessed February 24, 2020 (Swedish).
- ↑ M / S Stena NB 270. Fakta om Fartyg, accessed February 24, 2020 (Swedish).
- ↑ 第 8 艘 高端 客滚船 开 建. May 29, 2020, accessed June 30, 2020 (Chinese).
- ↑ a b Styrkebesked från Stena Line: Nya superfärjorna har börjat byggas. June 29, 2020, accessed June 30, 2020 (Swedish).
- ↑ M / S Stena NB 271. Fakta om Fartyg, accessed February 24, 2020 (Swedish).
- ^ M / S Santoña. Facta om Fartyg, accessed February 24, 2020 (Swedish).