Augustaburg tunnel
Augustaburg tunnel | ||
---|---|---|
North portal
|
||
use | Railway tunnel | |
traffic connection | High-speed line from Nuremberg to Erfurt | |
length | 1404 m | |
Number of tubes | 1 | |
cross-section | 92 m² above the top of the rail. | |
Largest coverage | 22 m | |
construction | ||
Client | DB network | |
building-costs | approx. 28 million euros | |
start of building | 2003 | |
completion | 2005 | |
business | ||
release | 2017 | |
location | ||
|
||
Coordinates | ||
Northeast portal | 50 ° 56 ′ 12 " N , 10 ° 58 ′ 34" E | |
Southwest portal | 50 ° 55 ′ 46 " N , 10 ° 57 ′ 36" E |
The Augustaburg Tunnel is a 1,404-meter-long railway tunnel on the new Ebensfeld – Erfurt line near Erfurt between the line kilometers 183.637 and 185.041.
With an overburden of 11 to 22 meters, the structure passes under the Augustaburg ridge five kilometers west of Erfurt city center near the Bischleben district . It was built from 2003 to 2005 and cost a total of around 28 million euros (of which the contract was worth 20.7 million). The tunnel sponsor was Christine Lieberknecht , former chairwoman of the CDU parliamentary group in the Thuringian state parliament and later Prime Minister of the State of Thuringia.
The railway tunnel has a clear height of 9.23 m from the top of the rail and a clear width of 13.64 m, with a mouth profile with a usable cross-sectional area of 92 m² above the top of the rail.
The slab track was installed as the superstructure, which merges into a conventional ballast superstructure near the east portal towards Erfurt. The track spacing is 4.5 m. The speed limit in the tunnel is 230 km / h.
geology
The tunnel tube crosses loose rock layers of the upper shell limestone with alternating layers of limestone , mudstone and marlstone . The groundwater level is up to 10 m above the tunnel roof , so the tube is watertight .
history
Construction work
The groundbreaking ceremony for the Augustaberg construction section of the new line was celebrated on September 11, 2002. The tunnel was built by Hochtief Construction AG and Alpine Bau GmbH .
The double-shell tunnel was excavated mechanically with a tunnel excavator , sometimes with blasting, from the northern portal between October 2003 and October 2005 with a cross-sectional area of around 160 m² . The cross-section was divided into a dome, bench and bottom and secured with a shotcrete lining according to the new Austrian tunnel construction method. The tunnel excavation was approximately 200,000 m³. A total of 1364 m was excavated by mining, 40 m using the open cut method.
The breakthrough at the southern portal took place in August 2004, the inner shell was manufactured from January 2005.
Installation
On June 10, 2017, a rescue exercise with 690 emergency services and 121 people assumed to be injured took place in the tunnel. About 30 people were assumed to be unable to walk. More than 100 emergency vehicles were also involved in the exercise.
It was the sixth of eleven planned rescue exercises at VDE 8.1.
Rescue concept
According to the tunnel guideline of the Federal Railway Authority , the tunnel structure u. a. Via rescue areas at both portals and an emergency exit at km 184.077, 440 m from the southern tunnel portal. This exit has a lock and a storage space and leads to the outside via a 19 m long cross tunnel and a 22 m deep staircase system .
Roads connecting the public road network were built at both rescue stations. Extinguishing water tanks with a volume of 100 m³ each were installed at the portals. The slab track is passable for road vehicles.
Web links
- Location and course of the tunnel on the OpenRailwayMap
- Images of the tunnel
- Pictures of the tunnel shell in 2011
Individual evidence
- ↑ a b Schüßler plan : Route brochure for the new VDE 8.1 line from Breitengüßbach to Erfurt. (PDF; 22.4 MB) DB Netz AG , June 1, 2017, p. 169 , accessed on September 24, 2019 .
- ↑ a b c d e f NBS Ebensfeld-Erfurt Tunnel Augustaburg. Study Society for Underground Transport Systems , accessed on September 24, 2019 .
- ^ Deutsche Bahn AG (ed.): The railway is building for Thuringia . Halle / Erfurt, approx. 2002, p. 14.
- ↑ Project information Tunnel Augustaburg. (No longer available online.) Archived from the original on September 28, 2007 ; accessed on October 14, 2019 .
- ↑ a b c Trial by fire in the ICE tunnel passed . In: DB World . No. 7 + 8 , July 2017, pp. 12 .
- ↑ Rescue teams train rescue in the event of a train fire on the new ICE line. In: insuedthueringen.de. June 10, 2017. Retrieved June 11, 2017 .
- ↑ Kai Mudra: Rescue workers must continue to improve cooperation . In: Thuringian General . June 12, 2017, p. 4 ( online for a fee ).
- ↑ Guideline requirements of fire and disaster control for the construction and operation of railway tunnels as of November 1, 2001