Shell Haven

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 91.107.18.103 (talk) at 00:35, 7 January 2009 (→‎Shell Refinery). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Shell Haven
OS grid referenceTQ728815
Unitary authority
Ceremonial county
Region
CountryEngland
Sovereign stateUnited Kingdom
Post townSTANFORD-LE-HOPE
Postcode districtSS17
Dialling code01375
PoliceEssex
FireEssex
AmbulanceEast of England
UK Parliament
List of places
UK
England
Essex

Shell Haven is the historic name for the port on the north bank of the Thames Estuary at the eastern end of Thurrock, Essex, England. DP World, which now owns the port, received planning consent in May 2007 for a new major deep water container port at the site, which is known as London Gateway.

Shell Haven was mentioned in Samuel Pepys Diary on June 10th 1667. Samuel Pepys Diary

The site previously known as Shell Haven or Shellhaven was originally an inlet on the north bank of the Thames, about a mile to the west of Canvey Island. This was the mouth of Shell Haven Creek, which runs east and south of the village of Fobbing, and originally separated Corringham Marsh from Fobbing Marsh. To the east was Shell Haven House. Sources differ on when Shell Haven first became associated with the oil industry; the first edition Ordnance Survey map of the early 1800s shows Oil Mill Farm a mile or so up Shell Haven Creek. Shell Haven was for over 80 years the site of a large Shell oil refinery, but there seems to be no evidence for the company taking its name from the site.

Thames Haven

In the 1850s a branch line was constructed from the London Tilbury and Southend Railway (LT&SR) to a new port immediately to the west of Shell Haven, to be known as Thames Haven (sometimes written Thameshaven). The name of Shell Haven would probably have been eclipsed, but for the failure of Thames Haven to prosper, and the later arrival of the Shell oil company.

Coryton

In 1895 the ammunition firm Kynochs purchased Borley Farm, to the east of Shell Haven Creek, in order to build an explosives factory. This opened in 1897, with a small estate called Kynochtown. Kynochs also built the Corringham Light Railway (CLR), with a passenger branch from the works to Corringham and a goods branch to the LT&SR at Thames Haven. The Kynoch works closed in 1919. The site and CLR were taken over by coal merchants Cory Brothers Ltd of Cardiff to build an oil storage depot, with Kynochtown being renamed Coryton. The oil depot eventually became Coryton Refinery (run from 1950 until recently by Mobil and its antecedents), which remains in production, between Shell Haven Creek and Hole Haven to the east.

Shell Refinery

Shell Oil first arrived in the form of the Asiatic Petroleum Company Ltd, a sales company formed by Royal Dutch Petroleum and the British company Shell Transport and Trading Company, prior to their merger as Royal Dutch Shell. A licence was obtained in 1912 to store petroleum at Shell Haven, in iron tanks, each containing not more than 4,000 tonnes. The maximum storage allowed for the whole site was 80,000 tonnes. Refinery operations began on a 40 hectare (100 acre) site in 1916 with a distillation plant which produced fuel oil for the Admiralty. In 1919 this unit was converted to manufacture road surfacing bitumen. In 1925, a bench still was erected for the manufacture of lubricating oils; the first high viscosity oils were produced in 1937. Other plants were erected before the outbreak of war, including a blending plant for producing horticultural chemical products.

During World War 2 the refineries and oil storage tanks at Thames Haven, Shell Haven and Coryton became a sitting target for air raids, notably in September 1940 during the Battle of Britain.

In 1946 a plant producing high grade paraffin wax for candles, paper, etc. was commissioned. In 1947 expansion began on a 400 hectare (1,000 acre) site west of the original refinery.

In 1948 financial sanction was approved by the Board of Shell Petroleum Co Ltd for the construction of a new large crude oil refinery, based primarily on the processing of Kuwait crude.

The facilities were to include: a Crude Distillation Unit, with a design intake of 6,000 tonnes/day of Kuwait Crude. It was given the designation CDU1.

A High Vacuum Unit with a design intake of 3,500 tonnes/day of Kuwait Long Residue. Designated HVU for CCF (cat cracker feed).

A Thermal Reformer with a design intake of 1,200 tonnes/day Kuwait Naphtha.

A Gasoline Doctor Treater

Three 17bar Steam Boilers (MP Boilers 3, 5 and 6) and a once through salt cooling water system.

In 1950 the Crude Distillation Unit, the Doctor Treater and MP Boilers 3, 5 and 6 were commissioned.


Crude Distiller 1
Crude was brought in by oil tankers to the jetties, usually 'B Jetty'. This was then pumped into 100,000 ton capacity tanks.

Once the tanks had been checked for water it was then pumped to the Crude Distiller.

It was passed through a Desalter unit which washed out salt from the crude oil before it entered the distillation unit.

The distiller produced long residue, waxy distillate, butane, propane, kerosene, gas oil (Heavy and Medium)and naphtha.

methane and other waste gasses produced went to the refinery flare system to be recovered and burnt as fuel in the refinery furnaces.

High Vacuum Unit

The High Vacuum Unit was originally designed to process 3,500 tonnes/day of Kuwait Long Residue. The Vacuum was produced using steam ejectors with salt cooling water condensers.

The HVU produced three streams. Short Residue, Waxy Distillate and Blowing Flux.

Short Residue was either feed for the Bitumen or used to blend fuel oil.

Blowing Flux was used in the production of Blown Bitumen.

In later years the HVU run on North Sea Long Residue.

When the Hydrocracker was commissioned in 1979 the HVU's Waxy Distillate became the HCU's feed. The operators called the HVU, feed prep.

Central Control Room

The Central Control Room was commissioned in 1992. It was built to provide better control and communications between the process units.

Most of the process units apart from the Sulphur recovery were controlled from here.

The Tank Farm and Waterfront were controlled from Road 6A Control Room.

The process plant in the background of the photo is the Hydrocracker.


Subsequently various units were added to produce valuable hydrocarbons from the distillation residue. In 1956 a catalytic reforming 'Platformer' was brought into service and in the same year, a petroleum chemicals unit to manufacture alkylbenzenes, the basis of household detergents. A second crude distillation unit was commissioned in 1959, and a second catalytic reformer in 1967. A kerosene hydrotreater was commissioned in 1972 and in 1977 a third reformer. In 1979 a hydrocracking unit was added to increase the proportion of light distillates. A new bitumen plant started production in 1981.

In 1992, a major capital investment was completed, adding a 'Naphtha Minus' complex which contained an isomerisation unit, benzene recovery and gas turbine power generation. A new Control Centre was added. By then the plant had a capacity of 4.6 million tonnes per annum, and covered 800 hectares (2,000 acres), with a 27km (17 mile) perimeter and its own generating plant, emergency and other services. It had five jetties, handling tankers of up to 300,000 tons capacity. The refinery delivered products by road and ship and UK oil pipeline network.

The Shell refinery closed in 1999; the neighbouring Coryton Refinery remains in operation.

Shell Haven Refinery was De-Commissioned and Demolished, apart from The Bitumen Plant and some Storage Tanks.

This is a photo of the refinery prior to decommissioning.

London Gateway

In 2006 the site was purchased by DP World, one of the largest marine terminal operators in the world, as part of the company’s purchase of P&O. In May 2007, DP World received outline planning consent for a major new deepwater port on the site, known as London Gateway. In addition to the new port, the development will include one of Europe’s largest logistics parks, providing access to London, the South East and the rest of the UK.

In May 2008, the Department for Transport issued a ‘Harbour Empowerment Order’ for London Gateway, which provided official and statutory powers for the new port and established London Gateway as a legally recognised authority. DP World is now set to invest over £1.5bn to develop the project over the next 10 to 15 years.