Dōtō Highway

from Wikipedia, the free encyclopedia
Template: Infobox high-level road / Maintenance / JP-A
Dōtō Highway in Japan
Dōtō Highway
map
Basic data
Operator: NEXCO Higashi-Nihon
Start of the street: Chitose
End of street: Kushiro
Overall length: 258 km
  of which in operation: 201 km
  of which under construction: 57 km

Prefecture :

Doto Expressway-tomamu, shimukappu-village, hokkaido, japan.JPG
New construction of the highway near Shimukappu .
Course of the road
node (4-1)  Chitose - Eniwa ( 千 歳 恵 庭 ) Hokkaidō Expwy
Junction on the left (1)  Chitose-higashi ( 千 歳 東 )R337
Rest stop Kiusu ( キ ウ ス PA)
Junction on the left (2)  Oiwakechō ( 追 分 町 )R234
Rest stop Yuni ( 由 仁 PA)
Junction on the left (3)  Yūbari ( 夕 張 )R274
Junction on the left (4)  Mukawa - Hobetsu ( む か わ 穂 別 )
tunnel Hobetsu Tunnel ( 穂 別 TN) length 4,332 m
Junction on the left (5)  Shimukappu ( 占 冠 )
Rest stop Shimukappu ( 占 冠 PA)
Junction on the left (6)  Tomamu ( ト マ ム )
tunnel Karikachi Daiichi Tunnel (狩 勝 第一 TN) length 2,351 m
Junction on the left Shintoku ( 新 得 )
Junction on the left (7)  Tokachi - Shimizu ( 十勝 清水 )R274
Rest stop Tokachi-heigen ( 十勝 平原 SA)
Junction on the left (8th )  Memuro ( 芽 室 )
node (9)  Obihiro ( 帯 広 )AObihiro-HirooR236
Junction on the left (10)  Otofuke- Obihiro ( 音 更 帯 広 )R241
Rest stop Osarushi ( 長 流 枝 PA)
Junction on the left (11)  Ikeda ( 池田 )R242
Toll booth Ikeda toll ( 池田 TB)
node (12)  Honbetsu ( 本 別 ) (Abashiri Range)
Junction on the left (13)  Honbetsu ( 本 別 )R242
Junction on the left (14)  Urahoro ( 浦 幌 )R274
tunnel Sensho tunnel ( 釧 勝 TN) length 4,460 m
Junction on the left Shiranuka ( 白 糠 )R392
Junction on the left Akan ( 阿 寒 )R240
Junction on the left Kushiro Airport ( 釧 路 空港 )
Junction on the left Kushiro ( 釧 路 )R38

The Dōtō-Autobahn ( Japanese 道 東 自動 車道 , Dōtō jidōshadō , dt. "East Hokkaidō-Autobahn") is a highway in Japan . The highway is equipped with 1 × 2 lanes and forms an east-west route on the northern island of Hokkaidō , from Chitose south of Sapporo to Kushiro , a larger city on the eastern part of Hokkaidō. The road is 201 kilometers long.

Street description

In the city of Chitose south of Sapporo, the Dōtō Highway begins at an intersection with the Hokkaidō Highway . The motorway is a 1 × 2 lane road, which means that the road has overpasses but only one lane with two lanes. The road runs through a flat area to the east. The mountains here are up to 1900 meters high and the area is heavily forested with only a few places. This section also has a number of tunnels including the Honbetsu Tunnel which is 4,332 m long and the Daiichi Karikachi Tunnel which is 2,351 m long and which is also the highest point on the highway on Hokkaidō at 626 meters above sea level . Then the town of Obihiro is followed by a flat agricultural part and the road turns northeast here. The main route is known as the Nemuro route ( 根 室 線 , Nemuro-sen ). In Honbetsu , the Abashiri route ( 網 走 線 , Abashiri-sen ) divides from it , which becomes Kitami Street ( 北 見 道路 , Kitami-dorō ) from Ashoro , which in turn is a bypass of National Road 39 . To the east of Honbetsu the road leads through a mountainous area. The route will end at the port city of Kushiro.

history

The Dōtō Highway is relatively new. On October 30, 1995 the first part opened at Tokachi-Shimizu in the middle part. On July 10, 1999, the western part of the Hokkaidō highway followed from Chitose to Yubari. On March 15, 2003, the part opened at Obihiro, which meant that traffic no longer had to be guided through the city. Later that year, on June 8th, the section at Honbetsu opened. In 2009 some parts between Chitosan and Obihiro were opened. The motorway is not yet fully developed.

Opening dates of the motorway

from to length date
Tokaichi-Shimizu Ikeda 50 km 10/30/1995
Chitose-Eniwa Yubari 42 km 07/10/1999
Ikeda Honbetsu 19 km 06/08/2003
Honbetsu Ashoro 13 km 06/08/2003
Tomamu Tokachi Shimizu 21 km 10/21/2007
Shimukappu Tomamu 26 km October 24, 2009
Honbetsu Urahoro 8 kilometers 11/21/2009
Yubari Shimukappu 34 km October 29, 2011

future

Further east the motorway ends at Urahoro . Another extension to the port city of Kushiro is under construction. In 2015 the open part between Shiranuka via Akan to Kushiro should be completed. The missing part between Urahoro and Shiranuka, where a longer tunnel is being built, is to be opened in 2014 [obsolete] . The Dōtō motorway then has a length of 258 kilometers.

Traffic volume

The volume of traffic on the Dōtō motorway is very low, which means that no further expansion to a 2 × 2 motorway is necessary. The busiest point is at the start on the Hokkaidō Highway, where 2500 vehicles travel a day. This drops to 1,600 vehicles at Obihiro and only 600 vehicles per day at Honbetsu.

Expansion of the roadways

from to length Lanes
Hokkaidō Highway Honbetsu 201 km 1 × 2