Aeolus (ship, 2014)

from Wikipedia, the free encyclopedia
Aeolus
2013 12 19 Aeolus 1 Sietas IMG 0438 P k b.JPG
Ship data
flag NetherlandsNetherlands Netherlands
Ship type Installation ship
Callsign PCRR
home port Rotterdam
Owner Aeolus BV
Shipyard Sietas shipyard , Hamburg
Keel laying December 23, 2011
Launch March 30, 2013
Ship dimensions and crew
length
139.4 m ( Lüa )
134.7 m ( Lpp )
width 38.06 m
Side height 9.12 m
Draft Max. 5.7 m
measurement 16,700 GT / 5,011 NRZ
Machine system
machine Diesel-electric drive
4 x Siemens - electric motor
Top
speed
12 kn (22 km / h)
propeller 2 × controllable pitch propellers
Transport capacities
Load capacity 6,500 dw
Others
Classifications DNV GL
Registration
numbers
IMO no. 9612636

The Aeolus is a installation ship from the Dutch company Van Oord . The type 187 ship was built at the Hamburg Sietas shipyard . The completion with the equipping of the four 87 meter long steel jack legs took place by July 2014 at the Lloyd shipyard in Bremerhaven . The ship is the first and only installation ship built at a German shipyard for the construction of offshore wind farms .

description

The Sietas shipyard took part in the development and design of installation vessels early on, and in December 2010 was the first German shipyard to receive an order for a third generation installation vessel. The ship is a combination of a transport ship, crane ship and offshore platform and was built for the Dutch hydraulic engineering company Van Oord. Van Oord placed the order for the first time in December 2010 with the Sietas shipyard, which was unable to process it as part of the insolvency proceedings . After a renewed agreement, the new order for the installation ship was placed in February 2012. The Sietas shipyard as the architect and integrator delivered the installation ship together with its former subsidiary Neuenfelder Maschinenfabrik (NMF), which has since been taken over by the Norwegian company of the TTS Group . NMF equipped the ship with a special offshore crane with a lifting force of up to 900  t .

The keel of the ship was laid on December 23, 2011. The hull was undocked on March 30, 2013 and the ship was handed over to the client on February 17, 2014. The delivery of the Aeolus was originally planned for the end of July 2013. After delivery, the lifting legs were installed at the Lloyd shipyard in Bremerhaven. The ship was christened on June 21, 2013 in Rotterdam . Godmother was the wife of the mayor of Rotterdam.

The Van Oord Group did not exercise the option to build a second ship at the Sietas shipyard because the construction of the offshore wind farms stalled.

Model of the Aeolus from the Sietas shipyard

The Aeolus is 139.4 meters long and 38 meters wide. The draft is 5.7 meters. The ship is designed for use in water up to 45 meters deep. It has a transport capacity of 6,500 tons (tdw) and a 3200 m², flexibly usable deck area with a fully integrated crane that can lift 900 tons of load with an outreach of 30 meters and work up to a height of about 120 meters above water . The ship is equipped with 26 single and 24 double cabins for the crew and service personnel, which is specified with 74 people. The great experience of the Sietas shipyard in the construction of heavy lift vessels leads to the special feature that the good stability of the Aeolus in port enables full crane operation without jacking operations.

Four main engines from Caterpillar with 4,500  kW each, together with four generators from Siemens, give the ship a speed of 12  knots via four electric traction motors and controllable pitch propellers .

Panoramic view of the Lloyd shipyard with three installation vessels. On the left is the Aeolus that has just arrived (this is where the lifting legs are installed). In the middle the installation ship Bold Tern and a view of Kaiserdock I, on the right in the background the jack-up platform Thor

See also

literature

  • Karl-Heinz Hochhaus: »Aeolus« - a wind turbine installation ship from the Sietas shipyard . In: Hansa , Issue 4/2013, special section Wind & Maritim 2013 , pp. 8–11, Schiffahrts-Verlag Hansa, Hamburg 2013, ISSN  0017-7504
  • Complex lifting system for the "Aeolus" . In: Schiff & Hafen , issue 4/2015, p. 37, DVV Media Group, Hamburg 2015, ISSN  0938-1643
  • Eckhard-Herbert Arndt: Strong tailwind for the "Aeolus" . In: Daily port report , November 18, 2014, p. 15, ISSN  2190-8753

Web links

Commons : Aeolus  - collection of images, videos and audio files

Individual evidence

  1. Peter Kleinort: Lloyd Werft completes installation ship · Delivery of the “Aeolus” in July . In: THB - Deutsche Schiffahrts-Zeitung , March 25, 2014, p. 4, ISSN  2190-8753 .
  2. Hope for Sietas shipyard: grace period until the end of March . In: Hamburger Abendblatt of February 19, 2013, accessed on March 11, 2013.
  3. Only one mission can save Sietas . In: Hamburger Abendblatt from January 11, 2013, accessed on March 11, 2013.
  4. a b Sietas begins production of the offshore wind turbine installation vessel for Van Oord ( Memento of January 13, 2014 in the Internet Archive ). Sietas shipyard press release (PDF; 57 kB), April 3, 2012.
  5. Björn Vasel: Sietas shipyard docks the installation ship Aeolus , Stader Tageblatt , March 31, 2013, accessed on April 2, 2013.
  6. New building “Aeolus” handed over ( Memento from February 21, 2014 in the Internet Archive ), THB - Deutsche Schiffahrts-Zeitung, February 18, 2014.
  7. Eckhard-Herbert Arndt: The Chinese are now with Sietas . In: THB - Deutsche Schiffahrts-Zeitung , October 17, 2013, p. 3.
  8. The most expensive Sietas new building to date leaves Hamburg , Hamburger Abendblatt, February 18, 2014, accessed on February 19, 2014.
  9. Eckhard-Herbert Arndt: First German builder ship handed over . In: THB - Deutsche Schiffahrts-Zeitung , February 18, 2014, p. 1/3.
  10. ^ "Aeolus" is now baptized in Rotterdam , THB - Deutsche Schiffahrts-Zeitung, June 18, 2014.
  11. Karl-Heinz Hochhaus: "Aeolus" - a builder ship for wind turbines from the Sietas shipyard . In: Hansa , issue 4/2013, special section Wind & Maritim 2013 , pp. 8–11.