Lech stage 3 - Urspring
| Lech stage 3 - Urspring | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
|||||||||||
|
|
|||||||||||
| Coordinates | 47 ° 42 '58 " N , 10 ° 49' 32" E | ||||||||||
| Data on the structure | |||||||||||
| Lock type: | Run-of-river power plant | ||||||||||
| Construction time: | 1966-1971 | ||||||||||
| Power plant output: | 10.2 MW | ||||||||||
| Operator: | Uniper power plants | ||||||||||
| Data on the reservoir | |||||||||||
| Altitude (at congestion destination ) | 722.0 m | ||||||||||
| Water surface | 130 ha | ||||||||||
| Reservoir length | 2.5 km | ||||||||||
| Reservoir width | 0.8 km | ||||||||||
The Lech barrage 3 - Urspring Lechsee is a barrage of the Lech between Schongau and Füssen .
geography
The barrage is located at river kilometer 143.0 in the municipality of Steingaden in the district of Weilheim-Schongau .
Technical specifications
The operator of the run- of -river power plant is Uniper Kraftwerke , the generated output is 10.2 MW with a drop height of 8.0 meters.
The expansion flow of the power plant is 142.5 m³ / s, the standard energy 43,726 MWh per year.
See also: List of hydropower plants in Germany
Natural space
The Lechstausee Urspring is used for swimming , surfing and sailing .
Individual evidence
- ↑ Holger Watter: Regenerative Energy Systems: Fundamentals, system technology and analyzes of executed examples of sustainable energy systems . Springer-Verlag, August 12, 2015, p. 457 .
- ↑ Analysis of the use of hydropower in Bavaria. Retrieved January 19, 2019 .
- ↑ Lakes & Swimming Pools - Lechbruck am See. Retrieved January 20, 2019 .