Lech stage 21 - Prittriching
Lech stage 21 - Prittriching | ||
---|---|---|
Southern reservoir viewed from the air | ||
location | ||
|
||
Coordinates | 48 ° 12 '38 " N , 10 ° 54' 15" E | |
country | Germany | |
place | Prittriching | |
Waters | Lech | |
Kilometers of water | km 63.9 | |
Height upstream | 536.1 m above sea level NHN | |
power plant | ||
operator | Uniper power plants | |
construction time | 1983-1984 | |
Start of operation | 1984 | |
technology | ||
Bottleneck performance | 12.1 megawatts | |
Average height of fall |
9.9 m | |
Expansion flow | 142.5 m³ / s | |
Standard work capacity | 59.5 million kWh / year | |
Turbines | 3 Kaplan bulb turbines | |
Others | ||
was standing | 2019 |
The Lech barrage 21 - Prittriching is a barrage of the Lech between Landsberg am Lech and Augsburg and is located at river kilometer 63.9 in the area of the municipality of Prittriching in the Landsberg am Lech district .
technology
The operator of the run- of -river power plant is Uniper Kraftwerke , the generated output is 12.1 MW with a head of 9.9 m using Kaplan turbines .
The power plant has been in operation since 1984 and is listed as BNA1234 in the power plant list of the Federal Network Agency .
The electricity generated is fed into the Bayernwerk AG network by a 20kV switchgear on site .
The expansion flow of the power plant is 142.5 m³ / s, the standard energy 59,457 MWh per year.
See also: List of hydropower plants in Germany
Reservoir
The reservoir to the south is about 3.6 km long and 0.4 km wide, it covers about 40 hectares. To the west, the Lechfeld with the Lechfeld air base extends .
The southern part of the reservoir is to be regarded as a flow path , depending on the drainage of the Lech barrage 20 .