Herbrum lock
Herbrum lock | ||
---|---|---|
View from the upper water onto the portals for the lifting gates, the new chamber on the left |
||
location | ||
|
||
Coordinates | 53 ° 2 '15 " N , 7 ° 19' 5" E | |
Country: | Germany / Lower Saxony | |
Place: | Papenburg , Herbrum district | |
Waters: | Dortmund-Ems Canal | |
Water kilometers : | km 212.6 | |
Data | ||
Owner: | Federal waterways and shipping administration | |
Responsible WSA : | Meppen | |
Construction time: | 1899 (old chamber) 1964–1966 (new chamber) |
|
Start of operation: | 1899 | |
lock | ||
Category: | Class IV (Europawasserstraße) | |
Usable length: | 165.0 m | |
Usable width: | 12.0 m | |
Height upstream : | 2 m above sea level NHN | |
Average height of fall : |
Depending on the tide, up to 2.7 m | |
Upper gate: | Lift gate | |
Lower gate: | Lift gate | |
Others | ||
Website: | Webcam | |
Was standing: | April 2017 |
The Herbrum lock is the northernmost lock on the Dortmund-Ems Canal . It is located in Herbrum , a district of the city of Papenburg in the Emsland district .
description
The Herbrum lock is the link between the Dortmund-Ems Canal and the Ems estuary, which is influenced by the tides . It is operated on site at set times, but due to the silt problem in the underwater, it can only be funneled on the Ems when the water level is sufficient . It is therefore of particular importance as access to the canalised inland waterway network .
- Old lock
The first lock chamber was built and put into operation in 1899 using the embankment method. It is 165 m long, 10 m wide and is closed with two lifting gates, the counterweights of which are each taken up by a striking steel portal.
- New lock
The new lock chamber was built in sheet piling from 1964 to 1966 . It is 165 m long, 12 m wide and is also closed with two lifting gates in steel portals.
In October 2016 a lifting gate failed and there was a risk that the waiting ships could touch the bottom in the underwater at low tide . In cooperation with the Lower Saxony State Agency for Water Management, Coastal Protection and Nature Conservation , the Ems barrage was closed and a sufficient water level was achieved to ward off the dangerous situation.
Web links
- Locks. WSA Meppen , accessed on April 18, 2017 .
- Webcam Herbrum lock
Individual evidence
- ↑ Operating times of the Herbrum lock. ELWIS , accessed November 27, 2017 .
- ↑ Closure of the Ems barrier due to the defective Herbrum lock. (PDF) WSA Meppen, October 25, 2016, accessed on April 18, 2017 .