Autocesta A13

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking street / Maintenance / HR-A
Autocesta A13 in Croatia
Autocesta A13
map
Autocesta A13
 In operation     In construction    In planning
Basic data
Operator: Hrvatske autoceste
Overall length: 86 km
  of which in operation: 10.6 km
  of which under construction: 16.9 km
  of which in planning: 58.5 km

County :

Development condition: 2 x 2 lanes
Course of the road
node (0.0)  Vrbovec 2 A12
Junction (10.6)  Farkaševac
Junction Gudovac
Junction (27.5)  Bjelovar
Junction (41.2)  Bedenik
Junction (72.0)  Virovitica
EU border crossing (86.0)  Border crossing Terezino Polje ( HR ) - Barcs ( HU )
Hungary Continue on  M60Pécs
  • Under construction
  • In planning
  • The Autocesta A13 ( Croatian for 'Motorway A13') is a motorway under construction in Croatia since April 27, 2009 , which will lead from Vrbovec to the Terezino Polje border crossing on the Croatian-Hungarian border.

    The future fully developed motorway is to lead from the Vrbovec 2 junction via Bjelovar and Virovitica to the Terezino Polje border crossing. Together with the A12 motorway , the A13 forms the so-called “ Podravina - Bilogorje Ypsilon”. The A13 provides a connection between Zagreb and the Podravina expressway (Croatian: Podravska magistrala ), which is currently being expanded, and is intended to provide better transport connections to Hungary. It should also contribute to the economic development of this area not far from Zagreb.

    The A13 branches off the A12 motorway at Vrbovec 2 . The logical continuation from Terezino Polje would lead in Hungary via Barcs and Szigetvár to Pécs via the M60 motorway . The section from Vrbovec 2 to Bjelovar is already under construction. In June 2012 it was decided not to turn the route into a motorway. Instead, it is to be built as the D12 expressway.

    The first, 10.6-kilometer section from the Vrbovec 2 node to Farkaševac was opened to traffic on April 16, 2019.

    See also

    Individual evidence

    1. Vlada.hr. Start of construction work on the Podravina-Ypsilon (April 27, 2009) ( Memento of the original from May 19, 2010 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. (Croatian)  @1@ 2Template: Webachiv / IABot / www.vlada.hr
    2. Vlada HAC-u odobrila novi kredit od 120 milijuna eura , tportal.hr of June 20, 2012
    3. Nakon punih 10 godina u promet puštena brza cesta Vrbovec - Farkaševac , jutarnji.hr of April 16, 2019

    Web links