GE Hitachi Nuclear Energy: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Reverting possible vandalism by 67.177.172.15 to version by Rangoon11. False positive? Report it. Thanks, ClueBot NG. (700984) (Bot)
Line 29: Line 29:


==History==
==History==
1955 Atomic Power Equipment Department established by GE
† GO JESUS!
<br>
1957 GE's first privately financed nuclear power reactor provides electricity for commercial use in [[Vallecitos Nuclear Center|Vallecitos, California]]
<br>
1960s BWR 1 and 2 constructed and begin operation
<br>
1970s BWR 2 through 4 constructed and begin operation
<br>
1980s BWR 5 and 6 constructed and begin operation
<br>
1997 [[ABWR]] design certified by the NRC
<br>
2005 [[ESBWR]] design certification filed by NRC


==Reactors ==
==Reactors ==

Revision as of 01:32, 4 November 2011

GE Hitachi Nuclear Energy
Company typePrivate
IndustryNuclear power
FoundedJune 2007
HeadquartersWilmington, N.C., U.S.
Area served
Worldwide
Key people
Caroline Reda (President and CEO)
Number of employees
3,000
ParentGeneral Electric
Hitachi
Websitewww.gepower.com/prod_serv/products/nuclear_energy/en/index.htm

GE Hitachi Nuclear Energy (GEH) is a provider of advanced reactors and nuclear services. It is located in Wilmington, N.C.. Established in June 2007, GEH is a global nuclear alliance created by General Electric and Hitachi. In Japan, the alliance is Hitachi-GE Nuclear Energy, Ltd.[1]

History

1955 Atomic Power Equipment Department established by GE
1957 GE's first privately financed nuclear power reactor provides electricity for commercial use in Vallecitos, California
1960s BWR 1 and 2 constructed and begin operation
1970s BWR 2 through 4 constructed and begin operation
1980s BWR 5 and 6 constructed and begin operation
1997 ABWR design certified by the NRC
2005 ESBWR design certification filed by NRC

Reactors

The Advanced Boiling Water Reactor (ABWR) is the world's first operational Generation III Class advanced light water reactor design. The NRC has docketed GEH's petition for renewal of ABWR certification.[2] The Economic Simplified Boiling Water Reactor (ESBWR), the Generation III+ Class design reactor, received a positive final safety evaluation report and final design approval in March 2011, and is expected to receive a license from the NRC by September 2011.[3][4]

GEH's Power Reactor Innovative Small Modular (PRISM) is a Generation IV reactor that uses liquid sodium as a coolant.

Nuclear services

As nuclear plants get older and worldwide demand for energy increases, GEH offers a wide range of valuable services that can improve performance, increase power output, and extend plant life.

Fuel services

GEH’s fuel cycle business supplies reliable fuel products and services to customers around the world.

References

  1. ^ http://www.ge-energy.com/content/multimedia/_files/downloads/geh_glance.pdf
  2. ^ http://federalregister.gov/a/2011-3734
  3. ^ "GE Hitachi Nuclear Energy's ESBWR Reactor Design Receives NRC's Final Design Approval, Clearing The Way For Global Sales". The Street. 2011-03-09. Retrieved March 12, 2011.
  4. ^ http://www.nrc.gov/reactors/new-reactors/design-cert/esbwr/review-schedule.html