List of rail routes in Sardinia
All rail routes in Sardinia are listed below. The lists include all routes in Sardinia in rail transport were operated or.
Railways (standard gauge)
route | Track wide mm |
The same se |
Length km |
Drive through |
from | to | Operation through |
comment |
---|---|---|---|---|---|---|---|---|
Cagliari – San Gavino Monreale | 1435 | 2 | 50.7 | diesel | 1871/83 | ib | FS | |
San Gavino Monreale – Golfo Aranci Marittima | 1435 | 1 | 254.4 | diesel | 1871/83 | ib | FS | |
Olbia – Olbia Marittima | 1435 | 1 | 2.4 | diesel | ? | ? | FS | reduced |
Decimomannu – Iglesias | 1435 | 1 | 37.1 | diesel | 1872 | ib | FS | |
Isili – Sorgono | 1435 | 1 | 83.1 | diesel | 1889 | ib | FS | |
Ozieri-Chilivani-Porto Torres Marittima | 1435 | 1 | 66.3 | diesel | 1874 | ib | FS | |
Villamassargia – Carbonia | 1435 | 1 | 22.3 | diesel | 1956 | ib | FS | |
Porto Torres - tank farm | 1435 | 1 | ~ 2.0 | diesel | ? | ? | reduced | |
Sanluri - Cellar Elettromeccanica | 1435 | 1 | ~ 8 | diesel | ? | ib | Siding |
Railways (narrow gauge)
route | Track wide mm |
The same se |
Length km |
Drive through |
from | to | Operation through |
comment |
---|---|---|---|---|---|---|---|---|
Gairo Taquisara-Jerzu | 950 | 1 | 8.7 | 1893 | 1956 | FCS | ||
Sarcidano – Villacidro | 950 | 1 | 64.0 | 1915 | 1956 | FCS | dismantled, partly cycle path since 1991 | |
Villamar-Ales | 950 | 1 | 26.2 | 1915 | 1956 | FCS | reduced | |
Monti-Luras | 950 | 1 | 28.3 | 1888 | 1958 | SFS | ||
Tirso – Chilivani | 950 | 1 | 78.8 | Steam, diesel | 1891/93 | 1969 | FCS | reduced |
Isili – Sorgono | 950 | 1 | 83.1 | diesel | 1889 | ib | FdS | Trenino Verde |
Macomer-Bosa | 950 | 1 | 45.9 | diesel | 1888 | ib | FdS | Trenino Verde |
Bosa Marina-Bosa | 950 | 1 | 2.2 | 1888 | 1981? | FdS | ||
Macomer-Nuoro | 950 | 1 | 57.8 | diesel | 1889 | ib | FdS | |
Mandas – Arbatax | 950 | 1 | 159.4 | diesel | 1894 | ib | FdS | Trenino Verde |
Monserrato-Isili | 950 | 1 | 71.1 | diesel | 1888 | ib | FdS | Trenino Verde |
Sassari – Alghero | 950 | 1 | 33.7 | diesel | 1889 | ib | FdS | |
Alghero – Alghero Porto | 950 | 1 | 1.3 | diesel | 1889 | 1988 | FdS | |
Sassari-Palau | 950 | 1 | 150.2 | diesel | 1931/32 | ib | FdS | Trenino Verde |
Sassari – Sorso | 950 | 1 | 9.9 | diesel | 1930 | ib | FdS | |
Siliqua – San Giovanni Suergiu | 950 | 1 | 58.3 | Steam, diesel | 1926 | 1968-74 | FMS | |
San Giovanni Suergiu – Sant'Antioco Ponti | 950 | 2 | 8.1 | Steam, diesel | 1926 | 1974 | FMS | |
Sant'Antioco Ponti – Calasetta | 950 | 1 | 12.9 | Steam, diesel | 1926 | 1974 | FMS | |
San Giovanni Suergiu – Carbonia | 950 | 2 | 7.4 | Steam, diesel | 1926 | 1969-74 | FMS | |
Carbonia-Iglesias | 950 | 1 | 25.7 | Steam, diesel | 1926 | 1969-74 | FMS |
Trams / light rail vehicles
route | Track wide mm |
The same se |
Length km |
Drive through |
from | to | Operation through |
comment |
---|---|---|---|---|---|---|---|---|
Cagliari tram | 950 | 1 | 800 V = | 1912 | 1973 | |||
Tramvia di Campidano Cagliari-Monserrato-Quartu S. Elena |
950 | 1 | ~ 10.0 | 800 V = | 1892 | 1961 | ||
Cagliari light rail Piazza della Repubblica - San Gottardo - Policlinico |
950 | 1 | ~ 6 | 750 V = | 2008 | ib | ||
Light rail Cagliari San Gottardo - Settimo San Pietro |
950 | 1 | ~ 6 | 750 V = | 2015 | ib | ||
Sassari Santa Maria di Pisa light rail - Sassari station - Emiciclo Garibaldi |
950 | 1 | 4.3 | 750 V = | 2006 | ib |
Werkbahnen
route | Track wide mm |
The same se |
Length km |
Drive through |
from | to | Operation through |
comment |
---|---|---|---|---|---|---|---|---|
Miniera di Monteponi – Portovesme | 950 | 1 | 20.1 | 1876 | 1963 | MM | ||
Pantaleo – Porto Botte | ? | 1 | 27.1 | 1887 | 1953 | MSL | ||
Miniera di S.Leone – La Maddalena | ? | 1 | 15.4 | 1862 | 1953 | MSL | ||
Pauceris – S. Lucia | ? | 1 | ~ 6.0 | 1862 | 1953 | MSL | ||
San Gavono-Sciria | 600 | 1 | 18.2 | 1876 | 1958 | SMM | ||
Piscinas – Tinacoi – Gennamari | ? | 1 | 7.2 | 1871 | 1943 | MGI | ||
Tinacoi-Naracauli | ? | 1 | 1.8 | 1871 | 1943 | MGI | ||
Porto Torres-Miniera di Monteferro-Canaglia | ? | 1 | 18.0 | ? | ? | ? |