Bochum Hauptbahnhof underground station

from Wikipedia, the free encyclopedia
Bochum Central Station
Stadtbahn.svg
U-Bahn station in Bochum
Bochum Central Station
Distribution level with shops
Basic data
District Bochum city center
Opened May 26, 1979
Tracks (platform) 6th
Coordinates 51 ° 28 '45 "  N , 7 ° 13' 21"  E Coordinates: 51 ° 28 '45 "  N , 7 ° 13' 21"  E
use
Stretch) Route I, II, III, IV
Line (s) U 35 302 306 308 310 318
Switching options BUS-Logo.svg S-Bahn-Logo.svg Deutsche Bahn AG-Logo.svg
Access to U35 towards Ruhr-Universität as well as 302 towards Laer and 310 towards Witten
Access to U35 towards Herne as well as 302 towards Gelsenkirchen and 310 towards Höntrop

The Bochum Hauptbahnhof underground station is located under Bochum Hauptbahnhof . It is served by lines U35 , 302, 306, 308, 310 and 318 of the Bochum Stadtbahn .

structure

The tower station has three levels. The top level serves only as a distribution level and has a few shops and a service office for the Bogestra . The meter-gauge lines (1000 mm) 306, 308 and 318 stop on the middle level. The two tracks are on two side platforms. On the lowest level, in two halls, there are the standard-gauge tracks (1435 millimeters) for the U 35 line and the meter-gauge tracks for the tram lines 302 and 310, with the two platforms between the standard-gauge tracks running in the middle and the outer meter-gauge tracks.

history

The opening took place on May 26, 1979 with the commissioning of the tunnel section for lines 308 and 318 from the main train station via Berliner Platz and the Schauspielhaus underground station to the ramp at the Bergmannsheil stop on Hattinger Straße .

The opening for the section to Herne of the U35 took place on September 2, 1989. It was extended in 1993 by the section to the Hustadt district .

Lines 302 and 310 have been running underground in the inner city since January 29, 2006.

Also in 2006 the underground connection of the line 306 between the town hall and the main train station was opened.

Screens have been installed on the platforms since 2012 to reduce the waiting time for passengers.

line Line course Tact
U 35 U  Herne , Schloß Strünkede - U  Herne Bf - Deutsche Bahn AG-Logo.svg Train U  Herne Mitte - U  Archeology Museum / Kreuzkirche - U  Hölkeskampring - U  Herne, Berninghausstraße - U  Bochum, Rensingstraße - U  Riemke Markt 2 - U  Zeche Constantin - U  Feldsieper Straße - U  Deutsches Bergbau -Museum - U  Bochum Town Hall (north) - U  Bochum Hbf - Deutsche Bahn AG-Logo.svg Train U  Oskar-Hoffmann-Straße - U  Waldring - Wasserstraße - Brenscheder Straße - Markstraße - Health Campus - Ruhr University - Lennershof BO - Bochum Hustadt (TQ)
The U 35 line is also called "CampusLinie"
10 min
302 Gelsenkirchen-Buer Rathaus - Gelsenkirchen Hbf - Bochum Hbf - Bochum - Laer Mitte - Langendreer Bf 10 min (Buer - Laer)
20 min (Laer - Langendreer)
306 Bochum Hbf - Bochum - Hamme - Wanne-Eickel Hbf 10 min
308 Bochum - Gerthe Schürbankstraße - Bochum Hbf - Bochum- Weitmar - Bochum- Linden - Hattingen center 10 min
310 Bochum- Höntrop church - Bochum main station - Witten town hall - Heven village 20 min
318 (Bochum-Gerthe Schürbankstraße -) Bochum Hbf - Weitmar - Linden - Dahlhausen train station 20 min

See also

Web links

Commons : U-Bahnhof Hauptbahnhof (Bochum)  - Collection of images, videos and audio files

Individual evidence

  1. ^ City of Bochum: Bochum main station.
  2. ^ Michael Weeke: City history. Former site manager remembers the construction of the light rail. In: WAZ Bochum, August 14, 2018
  3. Bogestra: 35 years ago: First urban railway line in Bochum. 2014