List of locks in the Danube

from Wikipedia, the free encyclopedia

The list of locks in the Danube includes all locks (barrages) in the Danube in 2013 .

The order is based on the kilometrage from the source to the mouth , so here in downward counting. The list is based on the publication of the Danube Commission.

In addition to the locks for large cargo or passenger ships, there are usually separate systems for pleasure craft . Also fish ladders or fish channels have been built.

photography Name of the lock country Place or object at km Fall height in m Length and
width in m
Remarks location
Railway power plant Bad Abbach 2 1.jpg Bad Abbach lock Germany Bad Abbach 2397.17 005.70 190
012
The lock is connected to the Bad Abbach run-of-river power plant in the Poikam district. location
Lock (seen in the foreground) Regensburg lock Germany regensburg 2379.68 005.20 190
012
The lock for large shipping is connected to the Regensburg power plant . It is located in the so-called Europakanal and works by radio remote control.
The picture shows the sport boat lock.
location
KraftwerkGeisling.jpg Geisling lock Germany Geisling 2354.29 007.30 230
024
The lock is located on the northern side of the Danube and is separated from the power station by an island . The lock can be seen on the right. location
Straubing lock 02.JPG Straubing lock Germany Straubing 2324.13 007.00 230
024
The associated Straubing power plant was built in 1992–1994. The location of the lock is indicated differently (both at km 2330 and at km 2322) because there is a gap of around 10 meters in the kilometering of the total length of the river. location
Kachlet Schleuse.jpg Kachlet lock Germany Kachlet 2230.60 009.80 226
024
The lock was built in 1922–1927 together with the Kachlet power station .
Jochenstein Lock Power Plant 2.jpg Jochenstein lock ,
2 chambers
Germany and Austria Untergriesbach and Engelhartszell 2203.20 010.37 227
024
The lock is connected to the Jochenstein power station , which can generate 132 MW with an average work capacity of 850 M Wh . map
The lock can be seen on the right. Aschach lock ,
2 chambers
Austria Aschach on the Danube 2162.67 016.90 230
024
The associated power plant in Aschach delivers a maximum of 290 MW.
lower picture - right in front the lock Ottensheim lock ,
2 chambers
Austria Between Ottensheim and Wilhering 2146.80 012.80 240
024
The associated power plant Ottensheim-Wilhering delivers a maximum of 170 MW. The picture below shows the lock on the right.
Winding 1.jpg Winding lock ,
2 chambers
Austria Wind down 2119.60 010.90 230
024
The associated hydropower plant delivers a maximum of 180 MW. The lock can be seen in the front left picture.
Wallsee-Mitterkirchen Kraftwerk.jpg Wallsee lock ,
2 chambers
Austria Wallsee 2095.10 012.80 230
024
The associated hydropower plant delivers a maximum of 210 MW. The lock can be seen in the left foreground.
Verbund Kraftwerk Ybbs-Persenbeug 1956.jpg Persenbeug lock ,
2 chambers
Austria Persenbeug 2060.42 012.30 230
024
The associated power plant in Ybbs-Persenbeug delivers a maximum of 190 MW. It was built together with the lock in the 1950s (see picture of construction).
Melk lock Austria Melk 2038.10 011.80 230
024
The associated hydropower plant delivers a maximum of 330 MW.
Altenwörth lock ,
2 chambers
Austria Altenwörth 1980.10 016.60 230
024
The associated hydropower plant delivers a maximum of 290 MW. location
Greifenstein power plant flood lock.jpg Greifenstein lock , 2 chambers Austria Greifenstein (municipality of St. Andrä-Wodge) 1949.20 014.60 230
024
The associated power plant in Greifenstein delivers a maximum of 290 MW.
Danube power plant Freudenau-03.jpg Freudenau lock ,
2 chambers
Austria Freudenau 1921.05 010.60 275
024
The associated hydropower plant delivers a maximum of 280 MW. In the foreground you can see the two lock basins. More than 10,000 ships pass through the power station's lock every year. Locking a ship here takes around 20 minutes.
Lock to branch off the Little Danube ( Mosoni Duna ) from the main Danube Hungary,
Slovakia
east of Rajka 1853 0 also connected to a hydroelectric power station map
Gabčíkovo sluice Slovakia.jpg Gabčíkovo lock ,
2 chambers
Slovakia Gabčíkovo 1819.15 020.40 280
034
The associated Gabčíkovo power plant delivers a maximum of 350 MW. The picture shows two ships in front of the lock gate that is just opening. map
Dam Serbia Djerdap 2.jpg Lock Đerdap I (Iron Gate I)
(double lock )
Serbia / Romania Iron Gate (Lake) (Djerdap) 0942.95
0941.5
020.00 /
014.00
310
034
The associated hydropower plant, which went into operation in 1971, can generate a maximum of 3 GW together with Đerdap II  . The lock basin can be seen in the foreground. map
Lock Đerdap II Serbia / Romania Iron Gate (lake) 0863 010.00 310
034
The associated hydroelectric power station can generate a maximum of 3 GWh together with Đerdap I. map

literature

  • Writings of the Association for European Inland Shipping and Waterways e. V. Various years. WESKA (Western European Shipping and Harbor Calendar), Binnenschifffahrts-Verlag, Duisburg-Ruhrort. OCLC 48960431 pp. A 200 - A 287
  • Herbert Böck: The construction of the Jochenstein Danube power plant. Emphasis. In: Austrian water management. Vol. 8, Vienna 1956.
  • Handout (as of 2012), issued by a river boat trip.

Individual evidence

  1. Locks on the Danube , accessed on August 28, 2013
  2. Regensburg lock at www.elwis.de ( Memento of the original from March 4, 2016 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.elwis.de
  3. Danube travel guide. From Passau to the Black Sea . Phönix-Reisen (Ed.), Bonn 2011; P. 81f