Severinstrasse underground station
Severinstrasse | |
---|---|
Underground station in Cologne | |
Underground station on the opening day |
|
Basic data | |
District | Altstadt-Süd |
Opened | November 9, 1959
December 13, 2015 |
Newly designed | around 2010 |
Tracks (platform) | 2 ( side platforms ) 2 ( central platform ) |
Coordinates | 50 ° 55 '45 " N , 6 ° 57' 24" E |
use | |
Line (s) | 3 4 17 |
Switching options | 106 132 |
The Severinstraße underground station is a tram stop in Cologne's Severinsviertel, where line 17 of the north-south light rail is linked with lines 3 and 4 over the Severinsbrücke . The stop is named after the Severinstraße above it .
history
Construction and opening
The part of the station located on the surface was built together with the connecting Severinsbrücke to Deutz and opened in November 1959. The side platforms of this stop are in the middle of the street and are connected by a pedestrian bridge at no height.
Since 1980 the tram has been running on the bridge and the access ramps on a special track .
business
Since it opened in 1959, lines 4 (Bickendorf - Höhenhaus), 7 (Müngersdorf - Holweide), 9 (Weidenpesch - Vingst), 14 (Sülz - Schlebusch) and G (Neumarkt - Bergisch Gladbach) have crossed the bridge.
In June 1967 it was the lines 3 (Bickendorf - Thielenbruch), 4 (Bocklemünd - Höhenhaus), 14 (Sülz - Schlebusch), 17 (Müngersdorf - Holweide) and 18 (Rudolfplatz - Ostheim).
After the line network redesign in 1970, lines 3 (Bocklemünd - Thielenbruch), 4 (Bickendorf - Schlebusch), 9 (Longerich - Königsforst), 15 (Ossendorf - Höhenhaus) crossed Severinsbrücke and served the stop.
In 1978 there were still lines 3 (Bocklemünd - Thielenbruch), 4 (Friesenplatz - Schlebusch) and 9 (Chorweiler - Königsforst).
Line 9 ran over the bridge until 1994 and MesseLine 14 (Dom / Hbf - Koelnmesse) from 1984 to 2003. Since then, the trains from lines 3 (Mengenich - Thielenbruch) and 4 (Bocklemünd - Schlebusch) have been running here.
Reconstruction of the station part on the surface
The old low platforms of the stop on the surface were demolished during the construction of the north-south light rail in July 2010. First of all, temporary wooden elevated platforms were built, which means that lines 3 and 4 are the first high-floor lines to manage without folding steps.
On January 23, 2014, the renewed station section on the surface was put into operation. The station is now barrier-free thanks to two elevators and the elevated platforms .
New construction of the tunnel station
A tunnel stop was built for the north-south light rail, which went into operation on December 13, 2015. For the time being, it is the terminus of line 17 coming from Sürth or Rodenkirchen. This is operated every 10 minutes on weekdays and condenses line 16 between Schönhauser Straße and Rodenkirchen or Sürth to a 5-minute cycle.
After the north-south tram is fully operational, line 17 is to be discontinued and instead lines 5 (Butzweilerhof - Dom / Hbf - Heumarkt - Chlodwigplatz - Marktstraße) and 16 (Niehl - Breslauer Platz / Hbf - Heumarkt - Chlodwigplatz - Sürth - Wesseling - Bonn) to be laid in the tunnel.
line | Line course | Tact |
---|---|---|
3 | Dellbrück, Thielenbruch - Holweide - Buchheim - Koelnmesse - Bf Deutz. / Lanxess Arena - Severinstraße - Post Road - Neumarkt - Appelhofplatz (Broad Street) - Friesenplatz - Hans-Böckler-Platz / Bahnhof West - Piusstraße - Körnerstraße - Venloerstraße / belt ( Bf Ehrenfeld ) - Leyendeckerstraße - Rochusplatz - Akazienweg - Bocklemünd - Mengenich - Görlinger center | 10 min |
4th | Leverkusen - Schlebusch - Cologne-Dünnwald - Höhenhaus - Mülheim Wiener Platz - Koelnmesse - Deutz / Lanxess Arena station - Severinstraße - Poststraße - Neumarkt - Appelhofplatz (Breite Straße) - Friesenplatz - Hans-Böckler-Platz / Bahnhof West - Piusstraße - Körnerstraße - Venloer Straße / Gürtel ( Ehrenfeld station ) - Leyendeckerstraße - Rochusplatz - Akazienweg - Bocklemünd | 10 min |
17th | Severinstraße - Kartäuserhof - Chlodwigplatz - Bonner Wall - Rodenkirchen (- Sürth only during peak hours ) | 10 min |
Previous station | Cologne light rail | Next station | ||
---|---|---|---|---|
Poststrasse ← Görlinger Center |
3 | Suevenstrasse Thielenbruch → |
||
Poststrasse ← Bocklemünd |
4th | Suevenstrasse Schlebusch → |
||
currently none, later Heumarkt ← Severinstrasse |
17 North-South light rail |
Carthusian court Rodenkirchen (-Sürth); → |
literature
- Höltge, Dieter and Reuther, Axel: Cologne, Düren, Aachen (= trams and light rail vehicles in Germany, Volume 7). EK-Verlag , Braunschweig 2001, ISBN 3-88255-338-3
Web links
- Project presentation of the underground station on the KVB website www.nord-sued-stadtbahn.de
Individual evidence
- ↑ a b Severinstraße: Commissioning of the new above-ground stop , press release of the Kölner Verkehrs-Betriebe from January 22, 2014
- ^ First day of operation of the new Severinstrasse stop on January 23, 2014 DSO Forum January 23, 2014
- ↑ Tim Attenberger: New KVB line 17 inaugurated. Kölner Stadt-Anzeiger, December 12, 2015, accessed on December 14, 2015 .
- ↑ Network after commissioning of the north-south light rail on the KVB website www.nord-sued-stadtbahn.de