Alessandria – Piacenza railway line

from Wikipedia, the free encyclopedia

Alessandria-Piacenza
Line of the Alessandria – Piacenza railway line
Route number (RFI) : 33
Course book series (IT) : 142
Route length: 96 km
Gauge : 1435 mm ( standard gauge )
Power system : 3 kV  =
Dual track : Yes
Route - straight ahead
from Arona and Turin
Station, station
0.000 Alessandria 96 m
   
to Cavallermaggiore , to Ovada and to Savona
   
Bormida
   
to Genoa
Station, station
7,568 Spinetta 99 m
Stop, stop
13.776 San Giuliano Piemonte station until 1999 111 m
   
from Novi Ligure
Road bridge
A7 - E62
   
Scrivia
   
from Genoa
Station, station
21.915 Tortona 117 m
BSicon exSTR + l.svgBSicon eABZgr.svgBSicon .svg
FS-SAFTPA connecting track
BSicon exLSTR.svgBSicon STR.svgBSicon .svg
BSicon exSTRl.svgBSicon eKRZo.svgBSicon .svg
to Castelnuovo Scrivia
Stop, stop
30.663 Pontecurone station until 2002 100 m
Bridge over watercourse (medium)
Curone
   
Piedmont - Lombardy
Station, station
38.118 Voghera formerly transition to FVV 93 m
   
Connecting track to the FVV in Varzi
   
to Mailand
   
Staffora
Bridge over watercourse (medium)
Coppa
Station, station
47,604 Casteggio 89 m
Stop, stop
52.366 Santa Giuletta to 2000 train station 77 m
   
from Pavia
Station, station
59.495 Broni 80 m
Station, station
63.290 Stradella 77 m
Bridge over watercourse (medium)
Versa
Station, station
67.987 Arena Po 70 m
   
Lombardy - Emilia-Romagna
Station, station
74.635 Castel San Giovanni 69 m
Stop, stop
78.998 Sarmato station until 2004 59 m
Bridge over watercourse (medium)
Tidone
Stop, stop
86,603 Rottofreno until 2000 station 64 m
Station, station
88.121 San Nicolò 62 m
   
Trebbia
   
from Milan
Station, station
96.513 Piacenza formerly transition to SIFT 53 m
   
Connecting track to the SIFT in Bettola
   
to Cremona
Route - straight ahead
to Bologna

The Alessandria – Piacenza railway is a railway line in Italy . The line is two-lane and electrified with 3000 volts direct current . It was built from 1858 to 1859 to connect the Piedmontese network with the Italian Central Railway, which was then under construction .

Opening dates

route date
Alessandria - Casteggio January 25, 1858
Casteggio - Stradella July 22, 1858
Stradella - Castel San Giovanni September 5, 1859
Castel San Giovanni - San Nicolò October 20, 1859
San Nicolò Bridge over the Trebbia November 20, 1859
Trebbia - Piacenza bridge January 19, 1860

Individual evidence

  1. ^ Impianti FS. In: I Treni No. 209 (November 1999), p. 7.
  2. Stazioni soppresse. In: I Treni No. 241 (October 2002), pp. 6-7.
  3. a b Impianti FS. In: I Treni No. 220 (November 2000), p. 6.
  4. ^ Impianti FS. In: I Treni No. 262 (September 2004), p. 6.
  5. Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 dicembre 1926

Web links

Commons : Alessandria – Piacenza railway  - Collection of images, videos and audio files