Autostrada A7 (Italy)

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking road / Maintenance / IT-A
Autostrada A7 in Italy
Autostrada dei Giovi (Serravalle)

Milano - Genova

Autostrada A7 (Italy)
 Italian traffic signs - strada europea 25.svg Italian traffic signs - strada europea 62.svg
map
Course of the A 7
Basic data
Operator:
Start of the street: Milan
( 45 ° 26 ′  N , 9 ° 10 ′  E )
End of street: Genoa
( 44 ° 25 ′  N , 8 ° 54 ′  E )
Overall length: 133.6 km

Regions :

Requirement for use: Toll obligation: closed system
toll-free : on the Milan section - node A50
Development condition: 2 × 2 and 2 × 3 lanes
Genova Bolzaneto 02.jpg
View of the A7 at the Bolzaneto junction
Course of the road
region Lombardy
Locality (-1.9)  Passage from Milano piazza Maggi
Template: AB / Maintenance / Empty 6-lane expansion
Autobahn beginning (-1.9)  Start of the motorway
Junction (-1.1)  Symbol: Down Famagosta solo parcheggio Italian traffic signs - parcheggio di scambio con tram.svg
Junction (0)  Symbol: Up Milano Cantalupa
Gas station Rest stop (0.5)  Icon: Left RightIcon: Left Right "Cantalupa" rest stop
Junction (0.6)  Symbol: Down Milano San Ambrogio - San Paolo Hospital - Cantalupa
Junction (2.0)  Assago Milanofiori
node (3.5)  West bypass Milan A50 E35 E62
Toll booth (4.1)  "Milano ovest" toll booth
flow Roggia Corana
Junction (10.5)  Binasco
flow Ticinello
parking spot (16.9)  Symbol: leftSymbol: leftParking lot " Battuda "
node (21.5)  Pavia motorway slip road A53
flow Ticino Bridge Ticino ( 252/252 m )
flow Roggia Castellana
Junction (30.6)  Gropello Cairoli - Pavia sud
Gas station Rest stop (33.6)  Icon: Left RightIcon: Left Right" Dorno " service area
flow Terdoppio
flow Po Bridge Po ( 850/750 m )
parking spot (43.4)  Symbol: leftSymbol: left" Corana " car park
flow Curone
Junction (50.0)  Casei Gerola
region Piedmont
Junction (54.0)  Castelnuovo Scrivia
flow Scrivia Bridge Scrivia ( 285/285 m )
Gas station Rest stop (60.6)  Icon: Left RightIcon: Left RightService area " Castelnuovo Scrivia "
node (62.8)  Torino - Brescia A21 E70
Junction (63.5)  Tortona
bridge Tortona ( 187/187 m )
node (72)  Junction Predosa - Bettole Autostrada A26-A7 Italia.svg
Template: AB / Maintenance / Empty from here 4-lane
Gas station Rest stop (80.3)  Icon: Left RightIcon: Left Right "Bettole" service area
parking spot (83.8)  Symbol: rightSymbol: right" Scrivia " car park
Junction (84.5)  Serravalle Scrivia
flow Scrivia Bridge Scrivia ( 172/124 m )
===Template: AB / Maintenance / BLD Conservation limit Milano Serravalle-Milano Tangenziali - Autostrade per l'Italia
flow Borbera Bridge Borbera ( 131/145 m )
Junction (88.6)  Vignole Borbera - Arquata Scrivia
bridge Spinti ( 56/56 m )
parking spot (92.1)  Symbol: rightSymbol: right" Vocemola " car park
Gas station Rest stop (92.5)  Symbol: leftSymbol: left Service area "Valle Scrivia"
tunnel Symbol: rightSymbol: rightGabbia ( --- / 1160 m )
bridge Symbol: leftSymbol: left Saliera
flow Symbol: leftSymbol: left Scrivia Bridge S. Belvedere ( 68 / --- m )
Liguria region
flow Symbol: leftSymbol: left Scrivia Bridge S. Pietrabissara ( 97 / --- m )
bridge Symbol: leftSymbol: leftPietrabissara ( 111 / --- m )
bridge Mereta ( 216/149 m )
bridge Rio Molino ( 53/57 m )
tunnel Symbol: rightSymbol: rightProdonno ( --- / 796 m )
bridge Symbol: leftSymbol: leftScrivia ( 110 / --- m )
bridge Rio Cagnola ( 64/102 m )
flow Vobbia Bridge Vobbia ( 175/173 m )
Junction (100.7)  Isola del Cantone
flow Symbol: leftSymbol: left Scrivia Bridge Isola del Cantone ( 278 / --- m )
bridge Symbol: rightSymbol: rightCreverina ( --- / 139 m )
tunnel Symbol: leftSymbol: left ( 45 / --- m )
flow Symbol: leftSymbol: left Scrivia Bridge Scrivia Cascinetta ( 162 / --- m )
bridge Symbol: leftSymbol: leftRio Carpi ( 133 / --- m )
tunnel Symbol: rightSymbol: rightMonreale ( --- / 957 m )
flow Symbol: rightSymbol: right Scrivia Bridge Scrivia Monreale
flow Symbol: leftSymbol: left Scrivia Bridge Scrivia Archi ( 150 / --- m )
bridge Scrivia Pietrafraccia ( 124/150 m )
Gas station Rest stop (106.1)  Icon: Left RightIcon: Left RightRest area " Giovi "
flow Scrivia Bridge Scrivia Arnasso (84/67 m )
Junction (106.5)  Ronco Scrivia
flow Symbol: rightSymbol: right Scrivia Bridge Scrivia Isolabuona ( --- / 150 m )
flow Symbol: leftSymbol: left Scrivia Bridge Scrivia Pieve ( 108 / --- m )
tunnel Symbol: rightSymbol: rightBoccardo ( --- / 1,064 m )
flow Scrivia Bridge Scrivia ( 179/216 m )
Junction (111.5)  Busalla
tunnel Giovi ( 910/1776 m )
parking spot (113.8)  Symbol: leftSymbol: leftCar park " Giovi "
tunnel Montanesi ( 132/375 m )
tunnel Campora ( 508/383 m )
Gas station Rest stop (116.9)  Symbol: rightSymbol: right "Campora" rest area
bridge Symbol: rightSymbol: rightMagnarino ( --- / 360 m )
bridge Orpea ( 66/68 m )
tunnel Symbol: rightSymbol: rightFrascone ( --- / 164 m )
bridge Rio Coppetta ( 70/112 m )
bridge Balletto ( 50/434 m )
tunnel Symbol: leftSymbol: leftBalletto ( 120 / --- m )
bridge Symbol: rightSymbol: rightGrone ( --- / 151 m )
tunnel Delle Piane ( 221/107 m )
bridge Symbol: rightSymbol: rightPeschiera ( --- / 180 m )
bridge Symbol: rightSymbol: rightFondega II ( --- / 134 m )
tunnel Symbol: leftSymbol: leftFondega ( 83 / --- m )
bridge Symbol: rightSymbol: rightFondega I ( --- / 83 m )
parking spot (92.5)  Symbol: rightSymbol: right "Castagna" car park
bridge Symbol: rightSymbol: rightRio Casette ( --- / 133 m )
bridge Symbol: rightSymbol: rightColombaro ( --- / 72 m )
bridge Symbol: rightSymbol: rightRio Morego ( --- / 132 m )
flow Secca Bridge Secca ( 131/370 m )
Junction (125.8)  Bolzaneto
tunnel Symbol: rightSymbol: rightBrazil ( --- / 718 m )
tunnel Symbol: leftSymbol: leftBolzaneto ( 102 / --- m )
bridge Symbol: rightSymbol: rightGeminiani ( --- / 290 m )
tunnel Symbol: rightSymbol: rightTeglia ( --- / 279 m )
tunnel Symbol: rightSymbol: rightMonte Galletto ( --- / 614 m )
node (128.7)  Roma A12 E80
bridge Rio Torbella ( 147/350 m )
tunnel Symbol: leftSymbol: leftTorbella ( 176 / --- m )
bridge Symbol: rightSymbol: rightRio Garbo ( --- / 99 m )
tunnel Symbol: rightSymbol: rightGarbo ( --- / 215 m )
bridge Symbol: leftSymbol: leftBersaglio ( 90 / --- m )
bridge Symbol: rightSymbol: rightPainting speed ( --- / 166 m )
tunnel Symbol: leftSymbol: leftPainting speed ( 156 / --- m )
tunnel Symbol: rightSymbol: rightMonte Moro ( --- / 160 m )
tunnel Symbol: rightSymbol: rightZella ( --- / 363 m )
tunnel Symbol: leftSymbol: leftCertosa ( 211 / --- m )
node (131.7)  Ventimiglia A10 E25 E80
tunnel Symbol: leftSymbol: leftBelvedere ( 315 / --- m )
tunnel Symbol: leftSymbol: leftPromontorio ( 204 / --- m )
tunnel Symbol: rightSymbol: rightSan Bartolomeo ( --- / 567 )
Toll booth (132.8)  " Genova ovest" toll station
Gas station Rest stop (133.6)  Symbol: rightSymbol: right" La Lanterna " rest stop
Autobahn end (133.6)  Motorway end
Locality (133.6)  Genova Sampierdarena - postage Symbol: port

Terminal Via AureliaSymbol: ferry E45
S1

  • Under construction
  • In planning
  • The Autostrada A7 ( Italian for 'Motorway A7'), also called Autostrada dei Giovi or “Serravalle”, is an Italian motorway in the north-west of the country that runs from Milan to Genoa . It is 133.6 km long and along its entire length toll . The motorway lies in the Italian regions of Lombardy , Piedmont and Liguria .

    course

    Course of the A7

    The A7 connects the economic center of Milan with the port city of Genoa on the Ligurian Sea and is the most important link between the two cities.

    Section Milan - A7 / A26

    The motorway starts in Milan, near Piazza Belfanti . It has two interchanges in the urban area of ​​Milan. Near the Milan suburb of Assago, it crosses the western bypass of Milan, the A50 . Here begins Kilometrierung the A7.

    The A7 has been expanded to six lanes in the Milan section to the bridge over the Po . The A53 branches off at Bereguardo and leads to Pavia . The motorway also crosses the Ticino here . Continuing through the Po plain , it crosses the eponymous river Po. By May 2009, the A7 between the bridge over the Po and the junction with the A21 had four lanes. The six-lane expansion took place here from 2005 to 2009. The construction costs amounted to 97 million euros. The A7 between Milan and the junction of the A7 / A26 motorway junction has now been expanded to six lanes over a length of 76 km.

    At Casei Gerola there is an expressway connection to Voghera . At Tortona it reaches the junction with the A21 , which leads to Turin or Brescia . Another motorway junction is located south of Tortona . The connecting motorway (ital. Diramazione) A7 / A26 branches off here, which connects the A7 with the A26 .

    Section A7 / A26 - Genoa

    From here the motorway is only expanded to four lanes. The A7 follows the course of the Scrivia River . Passing the towns of Serravalle Scrivia and Arquata Scrivia , it reaches the Ligurian Apennines and the Liguria region .

    In this section it reaches its highest point at the Giovipass and leads over the pass on an extremely narrow and winding route for a motorway. The two lanes are not parallel to each other: the lanes to the north (Milan) were expanded into a “real” motorway in the 1960s through numerous tunnels and viaducts , while the lanes to the south (Genoa) follow the course of the old Camionale road Tal follows. The narrow curve radii and the steep incline of this route only allow speeds of 60 kilometers per hour over long sections. For this reason, the route to Genoa is around five kilometers longer than the route to Milan.

    Passante di Genova

    Three motorways (A7, A10 and A12 ) meet in the urban area of Genoa . Due to the difficult topography , these motorways extend far into the urban area and are usually not designed to meet the latest standards in motorway construction. In addition, the motorways in the Genoa area have to accommodate a high proportion of transit and commuter traffic . Especially in summer, when there is still a lot of tourist traffic to the Italian Riviera , this leads to overloading of the motorway network.

    For this reason there are plans to build the so-called Passante di Genova .

    The core of the plans is the construction of a completely new motorway route ( Gronda di Ponente ) between the A10 near Vesima and the A7 in the urban area of ​​Genoa (at the Bolzaneto junction ). This route serves as a supplement to the existing A10 and is to be built with four lanes, i.e. two lanes in each direction, with hard shoulder . 89% of this new route will be run in tunnels. The plans also provide for the construction of a bridge over the Val Polcevera near Bolzaneto.

    Furthermore, the A7 in the north direction between Genova Ovest and Bolzaneto will be given a completely new route. The node at Genova Ovest is to be made more efficient in the course of the construction work.

    In the years 2005 to 2009, several route variants were examined , whereby the decision was ultimately made for the one described above. A total of 53 km will run in tunnels and 34.8 km will be added to the road network. The estimated costs amount to 3,147.7 million euros . A start of construction has not yet been set.

    the A7 at the "Dorno" service area

    administration

    Between Milan and the junction of the motorway junction (Italian Diramazione) A7 / A26 near Novi Ligure , the motorway is managed by the company Milano Serravalle - Milano Tangenziale SpA . The rest of the section from Novi Ligure to Genoa is under the control of Autostrade per l'Italia .

    Kilometrage

    In the urban area of ​​Milan at the Piazza Maggi a motorway slip road begins, which leads 1.9 km long to the start of the A7 motorway. The motorway slip road is called R35 Raccordo A7-Piazza Maggi . Here begins Kilometrierung the A7.

    Surname

    In addition to the official numbering, other designations are used for the A7: La Serravalle comes from the early years of the motorway when it ended in the village of Serravalle, dei Giovi is named after the Giovi Pass , which the A7 crosses north of Genoa. The third name, Autostrada Alpe Ligure , stands for the Ligurian Apennines, which the A7 crosses.

    history

    The section between Serravalle and Genoa was opened to traffic on October 29, 1935. This created a better connection between Genoa and the Ligurian Sea and the economic areas in the Po Valley. The section between Serravalle and Milan was opened on September 10, 1960.

    Predosa-Bettole di Tortona motorway branch

    See the Predosa-Bettole di Tortona motorway junction

    Web links

    Commons : Autostrada A7  - collection of images, videos and audio files

    Individual evidence

    1. Course, junctions and length of the A7 , on teonline.autostrade.it
    2. ^ Structures along the A7
    3. 3 lane between the bridge over the Po and the junction with the A21 ( memento of the original from June 14, 2009 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.serravalle.it
    4. Construction plans and information on the "Passante di Genova" ( Memento of the original from July 4, 2011 in the Internet Archive ) Info: The archive link has been inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. , accessed July 13, 2011 @1@ 2Template: Webachiv / IABot / www.autostrade.it
    5. Course of the R35