Autovía A-63
Autovía A-63 in Spain | ||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||
Basic data | ||||||||||||||||||||||||||||
Operator: |
![]() |
|||||||||||||||||||||||||||
Overall length: | 73.5 km | |||||||||||||||||||||||||||
of which in operation: | 30 km | |||||||||||||||||||||||||||
of which under construction: | 20.5 km | |||||||||||||||||||||||||||
of which in planning: | 23 km | |||||||||||||||||||||||||||
Development condition: | 2 × 2 lanes | |||||||||||||||||||||||||||
Construction of the viaduct over the Narcea (2016) | ||||||||||||||||||||||||||||
Course of the road
|
The Autovía A-63 or Autovía Oviedo – La Espina is a partially completed motorway in Spain . It runs entirely in the province of Asturias and, when finished, connects the provincial capital Oviedo with the municipalities of Grado , Salas and La Espina to the west over a length of around 50 kilometers . An extension of 23 kilometers from La Espina to the north to the A-8 near the municipality of Canero is being planned.
In the final state, the motorway consists of two structurally separate directional lanes, each with two lanes and an additional hard shoulder. The connection points are free of height. The line of the motorway is very curvy due to the existing hilly landscape . There are also some tunnels and bridges along the way.
The motorway is being built to improve both the development of the Asturian hinterland and the accessibility of the provincial capital. So far, the route between the A-66 near Oviedo to Cornellana has been continuously accessible as an autovia. The section between Cornellana and Salas is under construction (as of April 2019). The route between Salas and La Espina will be run as national road 634 , as only one carriageway has been built so far. The construction of the second carriageway is in preparation (as of April 2019). [outdated]
Construction progress
section | length | Traffic transfer | Status (April 2019) |
---|---|---|---|
A-66 - Latores | 4.1 km | December 28, 1999 | In operation |
Latores - Trubia | 5.7 km | August 13, 2003 | In operation |
Trubia - Llera | 4.3 km | December 31, 2005 | In operation |
Llera - Grado (first lane) | 8.7 km | February 14, 2004 | In operation |
Llera - Grado (second lane) | 8.7 km | October 31, 2007 | In operation |
Variant of Grado | 2.0 km | February 6, 2008 | In operation |
Grado - Doriga | 4.0 km | July 7, 2010 | In operation |
Doriga - Cornellana | 2.4 km | December 26, 2017 | In operation |
Cornellana - Salas | 7.3 km | Under construction | |
Salas - La Espina (first lane) | 12.0 km | March 22, 2012 | In operation |
Salas - La Espina (second lane) | 12.0 km | In preparation | |
La Espina - Canero ( A-8 ) | 23.0 km | In planning |
Web links
Individual evidence
- ↑ a b De la Serna takes part in the commissioning of the Doriga-Cornellana section of the A-63 motorway . Ministerio de Fomento, December 26, 2017, accessed April 18, 2019.