Autovía A-73
Autovía A-73 in Spain | ||||||||||||||||||||||
![]() |
||||||||||||||||||||||
map | ||||||||||||||||||||||
Basic data | ||||||||||||||||||||||
Operator: | ||||||||||||||||||||||
Overall length: | 74 km | |||||||||||||||||||||
of which in operation: | 10 km | |||||||||||||||||||||
of which under construction: | 17.7 km | |||||||||||||||||||||
of which in planning: | 43 km | |||||||||||||||||||||
Course of the road
|
The Autovía A-73 or Autovía Burgos – Aguilar de Campoo is a motorway in Spain . Once completed, the motorway will begin in Burgos and end in Aguilar de Campoo .
The section Quintanilla-Vivar - Quintanaortuño with a length of 8.5 km was completed in 2013, the section from Burgos - Quintanilla-Vivar with a length of 1.5 km in 2015. The 17.7 km long section of Pedrosa de Valdelucio is under construction to Aguilar de Campoo (connection to the Autovía A-67 ), which is due to open in 2020. All other sections of the motorway are in different planning stages.
Route
Sections
position | Abbreviation of the section | section | km | opening |
---|---|---|---|---|
1 | A-73 BU-30 | Burgos (BU-30) - Quintanilla Vivar | 1.5 | 2015 |
2 | A-73 | Quintanilla Vivar - Quintanaortuño | 8.5 | 2013 |
3 | Quintanaortuño -Montorio | 11.7 | in planning | |
4th | Montorio-Santa Cruz del Tozo | 17.1 | in planning | |
5 | Santa Cruz del Tozo- Pedrosa de Valdelucio | 14.3 | in planning | |
6th | Pedrosa de Valdelucio - Báscones de Valdivia | 11.95 | in planning (opening expected in 2020) | |
7th | Báscones de Valdivia - Aguilar de Campoo ( A-67 ) | 5.7 | in planning (opening expected in 2020) |
Routing
position | maximum speed (km / h) | Roadways | km | Direction (Aguilar de Campo) | Direction (Burgos) | Connection to |
---|---|---|---|---|---|---|
1 | 40 | 2 | Beginning of the A-73 | End of the A-73 roundabout Villarcayo Quintanilla- Vivar Villatorio Burgos -Industrial area Villalonquéjar Industrial area Villalonquéjar Calle Valle de Losa |
CL-629 N-623 N-627 |
|
2 | 40 | 2 |
Vitoria Airport - Burgos - Logroño - Madrid |
Vitoria Airport - Burgos - Logroño - Madrid |
BU-30 A-1 inch E 5 AP-1 N-120 E 5 A-1 |
|
3 | 100 | 2 | 1 |
Vitoria - Madrid - Logroño Burgos Quintanilla- Vivar |
BU-30 N-623 N-627 |
|
4th | 120 | 2 | 9 | Quintanaortuño - Villarcayo | Quintanaortuño - Villarcayo | N-623 N-627 CL-629 |
5 | 80 | 2 | End of the A-73 | Beginning of the A-73 | N-623 N-627 |
|
6th | 2 | Section Quintanaortuño - Aguilar de Campoo (planned) | Section Aguilar de Campoo - Quintanaortuño (planned) |