Piel Weichs hydropower plant
| Piel Weichs hydropower plant | ||
|---|---|---|
| location | ||
|
|
||
| Coordinates | 48 ° 45 '42 " N , 12 ° 52' 13" E | |
| country |
|
|
| place | Plattling | |
| Waters | Isar | |
| power plant | ||
| owner | Uniper Kraftwerke GmbH | |
| operator | Uniper Kraftwerke GmbH | |
| Start of operation | 1994 | |
| technology | ||
| Bottleneck performance | 12.6 megawatts | |
| Average height of fall |
7.6 m | |
| Expansion flow | 195 m³ / s | |
| Others | ||
| was standing | BNA 1230 | |
The Piel Weichs power plant is a run-of-river power plant on the Isar and the last power plant on the Isar before it flows into the Danube .
The power plant, which opened in 1994, is located near Piel Weichs , a district of Plattling in the Deggendorf district in Lower Bavaria . The electrical output of the power plant is 12.6 megawatts . The grid connection is made via a switchgear on site at the 20 kV medium voltage level in the power grid of the distribution network operator Bayernwerk AG . The system is listed under the number BNA 1230 at the Federal Network Agency.
literature
- Rolf Meurer: Hydraulic engineering and water management in Germany . Past and present. Parey, Berlin 2000, ISBN 978-3-322-80214-9 , pp. 325 ( Snipet ).
Web links
- Support strength level Piel Weichs on the website of the Landshut water management office
Individual evidence
- ↑ Archive link ( Memento from December 5, 2014 in the Internet Archive )
- ^ Federal Network Agency power plant list. (xlsx; 588 kB) May 10, 2016, accessed on October 28, 2016 .
- ↑ Energy Management