Ebertplatz underground station

from Wikipedia, the free encyclopedia
Ebertplatz
U-Bahn.svg
Underground station in Cologne
Ebertplatz
Change between high and low floor
Basic data
District Downtown
Opened 1974
Newly designed 2008
Tracks (platform) 4 (2 central platforms)
Coordinates 50 ° 57 '2 "  N , 6 ° 57' 28"  E Coordinates: 50 ° 57 '2 "  N , 6 ° 57' 28"  E
use
Stretch) Inner city tunnel , rings tunnel
Line (s) 12 15

16 18

Switching options Bus: 127

140 186

The Ebertplatz underground station is the largest underground junction of the Cologne city railway . It is designed as a four-track crossing station that is used in one direction . The Ebertplatz is one of the most important transfer points between high-floor and low-floor network and is frequented daily by nearly 35,000 in and outs.

history

Track plan

Ebertplatz was already an important junction for the Cologne tram . In the course of the first expansion of the underground tram network, the entire junction was moved underground. In contrast to the previous tunnels, great importance was attached to the efficiency of the system - also due to the initial funding from state funds. Almost all routes can be used without crossing other routes. For this purpose, uneven branches were created underground . In addition, the bus stop system has an underground turning loop .

The station was originally designed for use with mover carriage designed. In addition to the turning loop, this is also evidenced by the fact that originally there was a side platform to the right of each track , with the outer tracks originally even being separated from the inner tracks by barriers . The platforms were every 35 cm above the top of the rails. A later increase in the platforms for high-floor light rail cars was planned from the start; in particular, all escalators ended at 90 cm and could only be reached from platform level via ramps .

Condition before the conversion: Exit on both sides

Since the relocation of line 12 from the inner city to the rings tunnel in December 2003, the station has been completely free of intersections, and the high-floor and low-floor lines have been running on separate tracks since then. This made a barrier-free conversion possible. The problem arose that the original planning had assumed that in the medium term all lines would be converted to high-floor light rail vehicles. The shell structure only allowed the track heights to be changed by a few centimeters, which is why the central platforms had to be divided lengthwise into platforms of different heights. Since the central platforms were considered too narrow for this, it was finally decided to move the outer tracks to the area of ​​the side platforms that were no longer required, thereby gaining space for widening the central platforms.

The renovation began in the spring of 2008 and ended in March 2009, with the outer tracks being moved during a six-week closure during the school summer holidays. At the same time, elevator shafts were created from the platforms to the square.

line Line course Tact
12 Merkenich  - Niehl  - Weidenpesch  - Neusser Straße / Gürtel  - Florastraße  - Lohsestraße  - Ebertplatz  - Hansaring S-Bahn-Logo.svg  - Christophstraße / Mediapark  - Friesenplatz  - Rudolfplatz  - Zülpicher Platz - Barbarossaplatz - folding rule 10 min
15th Chorweiler S-Bahn-Logo.svg  - Heimersdorf  - Longerich  - Weidenpesch  - Neusser Straße / Gürtel  - Florastraße  - Lohsestraße  - Ebertplatz  - Hansaring S-Bahn-Logo.svg  - Christophstraße / Mediapark  - Friesenplatz  - Rudolfplatz  - Zülpicher Platz - Barbarossaplatz - Chlodwigplatz  - Ubierring 10 min
16 Niehl  - Amsterdamer Straße / Gürtel - Reichenspergerplatz  - Ebertplatz  - Breslauer Platz / Hbf  - Dom / Hbf  - Appelhofplatz (Breite Straße)  - Neumarkt  - Barbarossaplatz - Chlodwigplatz  - Ubierring - Marienburg  - Rodenkirchen  - Sürth  - Godorf  - Wesseling Nord - Wesseling  - Wesseling Süd - Urfeld  - Widdig  - Uedorf  - Hersel  - Tannenbusch Mitte  - Tannenbusch Süd  - Propsthof Nord  - Bonn West  - Bonn Hbf  - University / Market  - Juridicum  - Federal Audit Office / Foreign Office  - Museum Koenig  - Heussallee / Museum Mile  - Ollenhauerstraße - Olof-Palme-Allee - Max -Löbner-Straße / Friesdorf - Hochkreuz / Deutsches Museum Bonn  - Wurzerstraße  - Plittersdorfer Straße  - Bonn-Bad Godesberg train station  - Bad Godesberg town hall 10 min
18th Dellbrück, Thielenbruch  - Holweide - Buchheim  - Mülheim station  - Mülheim Wiener Platz - Zoo / Flora  - Reichenspergerplatz  - Ebertplatz  - Breslauer Platz / Hbf  - Dom / Hbf  - Appelhofplatz (Breite Strasse)  - Neumarkt  - Barbarossaplatz - Eifelwall  - Klettenberg  - Hürth  - Brühl  - Bornheim  - Bonn West  - Bonn main station 5 min (main section)
Previous station Cologne light rail Next station
Lohsestrasse
← Merkenich
  12   Hansaring folding
rule Südfriedhof →
Lohsestrasse
← Chorweiler
  15th   Hansaring
Ubierring →
Breslauer Platz / Hbf
← Bonn-Bad Godesberg
  16
Rheinuferbahn
  Reichenspergerplatz
Niehl Sebastianstraße →
Breslauer Platz / Hbf
← Bonn Central Station
  18
Foothill Railway
  Reichenspergerplatz
Thielenbruch →

Web links

Individual evidence

  1. Priorities for platform elevation and elevator retrofitting in the Cologne light rail network . Transport Committee of the City of Cologne. May 18, 2008. Retrieved March 6, 2010.