Intercity 2 (Deutsche Bahn)

from Wikipedia, the free encyclopedia
Bombardier Twindexx train set with locomotive in matching color on October 28, 2015
Stadler KISS multiple unit 4110 109 at the presentation in Berlin Central Station, February 5, 2020

Deutsche Bahn markets its double-decker Intercity trains, which have been in operation since December 2015, under the name Intercity 2 , or IC2 for short .

Train material and equipment

The increasing obsolescence of the existing wagon fleet as well as an option for double-decker wagons originally intended for DB Regio prompted the DB to modernize or supplement its IC-fleet with double-decker wagons of the type Bombardier Twindexx . In 2019, Deutsche Bahn also acquired “ KISS ” multiple units from the manufacturer Stadler from Westbahn , which have also been in operation as IC2s since March 8, 2020.

Locomotive-hauled IC2

The first IC2 were locomotive hauled trains with five double-decker cars and a top speed of 160 km / h.

Twindexx Vario as "Intercity 2" control car at Innotrans on September 23, 2014
2nd class double deck coach (DBpza 682.2)

The first cars were presented to the public at InnoTrans 2014. The first prototypes were presented in Berlin and Leipzig in autumn 2014. There was a lot of criticism, such as B. too little space for luggage, less seating comfort or the lack of a bistro or dining car.

Common features

The locomotive-hauled IC2 is similar to the double-decker trains used on the regional express .

The 134.50 meter long trains without a locomotive are made up of five cars: In addition to a control car ("Servicewagen", type DBpbzfa 668.2, serial number 1) there are three middle cars, second class (DBpza 682.2, serial numbers 2-4) and one middle car, first class ( DApza 687.2, serial number 5). Each train also consists of an electric locomotive designed for 160 km / h. Deutsche Bahn initially sought approval for a maximum speed of 185 km / h at a later date. Since the IC 2 is hardly used on routes with a top speed of more than 160 km / h, according to the information provided by Deutsche Bahn, and the potential time advantage would be marginal, this will not be pursued further. In addition, higher speeds are expensive to obtain because of ETCS and problematic for double-decker trains, for example because of energy consumption and sensitivity to crosswinds. The low-cost IC 2 makes it possible to maintain and expand long-distance traffic on rural routes at a moderate speed.

The trains have 468 seats, 70 of them in the first class and six folding seats. A total of nine parking spaces are available for bicycles , six of which are in the control car and one in each of the other three second-class cars. The trains have, among other things, head cushions, footrests, LTE- enabled cellular amplifiers and sockets. The integration of a WLAN system into the IC2 fleet began in 2019.

According to DB information on the introduction, the retrofitting of an on-board restaurant was "probably" planned, but has not yet taken place. Instead, there will be catering in both classes on individual sections of the route. Under the name IC Café-Team , employees of the Lufthansa subsidiary LSG Sky Chefs offer travelers cold and hot drinks, snacks and baked goods.

The entrances and exits have a clear width of 1300 mm in the control car and 1800 mm in the middle car. Access to the control car is barrier-free on 55-centimeter platforms via a gap bridging, a ramp is provided for heights between 38 and 76 centimeters. A barrier-free and level entry into the control car is only possible here for the lower floor. There is also a barrier-free toilet there. The upper floor is not barrier-free and can only be reached by two flights of stairs, there are seats and a children's play area. With all intermediate cars (and thus also the only first-class car), stairs must always be overcome when boarding; from the entrance area, all seats on the lower and upper floors can only be reached via additional stairs. The entrances to the car are just under 1.90 meters wide; a handrail divides the entrances into two parts in the middle car. In the second class, knee clearance of 820 millimeters is provided, in the first class of 910 millimeters.

The construction as a double-decker car leads to some restrictions compared to the single-decker vehicles used previously. Because of the low interior height and the clearance-related kink in the car body, only small luggage racks are possible above the seats, on which larger items of luggage cannot be stowed. For reasons of space, the air ducts of the air conditioning system also have to be routed along the walls in the foot area of ​​the interior, which means that the foot space at the window seats is massively restricted.

differences

First series: The first series was equipped with class 146.5 locomotives. The first series is mainly used on the routes in Lower Saxony as well as to Leipzig and Dresden.

Second series: The second series is tractioned with class 147.5 locomotives . delivered. The main area of ​​application for the first batch of 17 trains in the second series is in Baden-Württemberg. It will be equipped with ETCS for traffic with Switzerland, although its approval by Switzerland was delayed and had not yet taken place at the end of 2019.

Acceptance and criticism

It quickly turned out to be problematic that the trains, although technically a locomotive, four medium-sized cars and one control car, are to be treated operationally like a multiple unit. As soon as a car has a defect, it cannot be separated and suspended like a train of cars; instead, the entire train has to be suspended.

The press coverage shows that IC2 of this type are viewed very differently. On the one hand, the interior and the children's compartment are praised, but on the other hand, there is also a lack of space for luggage and a lack of WiFi. Other newspapers also cite “a bad regional express” and argue that the original technical difficulties (see section Start of Operation ) and the resulting fluctuations in the wagons make passengers sick. The forced transfer in Singen was also clearly criticized. In June 2019, DB had to admit that the number of delays and cancellations on the connection from Stuttgart to Nuremberg was even higher than the national average, especially after the switch to IC-2 trains. In January 2020 it became known that the railway was refusing to accept 25 new trains because the series had proven to be very prone to failure in operation since 2015 and often provoked delays.

operating cost

According to the Deutsche Bahn, the cost of the vehicles per kilometer is 18 euros per kilometer; old passenger trains would cost 25 euros per kilometer.

Multiple units

In 2019, DB acquired Stadler KISS double-decker multiple units from Westbahn and had them upgraded for intercity service. The railcars consist of four cars and can reach a top speed of 200 km / h. The regular scheduled service began on March 8, 2020 on the Rostock - Berlin - Dresden route.

business

prehistory

In 2011, the plan was to use the first double-deck cars on IC lines in 2013. This date has been postponed several times. Bombardier justified the delivery delays with the approval by the Federal Railway Authority, in the context of which additional evidence was repeatedly requested. In July 2015, the double-deck cars were presented in various stations, including a. in Düsseldorf and Leipzig.

Approval by the Federal Railway Authority took place in September 2015, after which the vehicles were handed over to Deutsche Bahn and staff training began.

IC at the exit at Stuttgart Central Station in 2017

With the timetable change in December 2015, operations began with the first use of the double-decker Intercity trains - now called Intercity 2 ( IC2 ) - on IC line 56 (Cottbus / Leipzig - Hanover - Norddeich). To this day, only trains from the first series are used here.

Since March 20, 2016, the Intercity-2 trains have also been used on IC line 35 (Koblenz - Cologne - Münster - Norddeich). However, the operation was interrupted for one to two years for the 2017 annual timetable because the vehicles were required from December 2016 for IC line 55, where a pair of trains with double-decker IC had been running since September 4, 2016. In order to be able to meet the travel time between the Dortmund and Hanover nodes, the Intercity 2 trains do not stop in Bad Oeynhausen . According to the timetable, 18 sets are required. The first five sets went into operation in 2016; at the end of 2016, 25 were already in use. The maintenance of the trains first ordered by DB Fernverkehr takes place in the ICE plant in Leipzig , where new workshop capacities have been created. Initially, the idea was to operate the Intercity double-decker wagons through the DB Regio subsidiary DB Verkehr GmbH and thus to utilize the existing maintenance capacities for double-decker wagons at DB Regio.

After test drives in May 2017, the trains have also been running on the Stuttgart – Singen (Gäubahn) route since December 10, 2017, with trains from the second series being used here. Since the equipment with ETCS is a prerequisite for use in the Swiss network and the Bombardier trains have not (yet) been granted Swiss approval, their traffic to Zurich was postponed until the end of 2020.

Problems

An accumulation of technical malfunctions, including on the doors and the vehicle controls, as well as uncomfortable rolling of the vehicles on certain sections of the route made repairs to the trains of the first series necessary. For this reason, the deployment of the vehicles originally planned for February 2016 on IC line 55 (Dresden - Hanover - Cologne) had to be postponed to mid-December 2016. The vibration dampers have been readjusted to reduce rolling movements and all wheel sets have been given a more conical profile to reduce lateral movements. Since February 19, 2016, a speed limit for IC 2 has been reduced to 120 km / h in the section between Halle (Saale) Hauptbahnhof and Leipzig-Mockau, which is to be compensated by omitting the stop at Leipzig / Halle Airport station . According to the Federal Railway Authority , all rolling movements during the approval process were within the permissible values.

The trains in the second series, on the other hand, are repeatedly affected by lighting failures. Due to problems with equipping the trains, the additional Intercity-2 trains will probably only run to Singen until December 2020, where they will have to switch to an IC with approval for the Swiss rail network.

procurement

The value of the contract awarded to Bombardier Transportation in 2011 was put at 362 million euros. The cost of a train with five cars and a class 146.5 locomotive is 17 million euros. In spring 2016, 22 of the 26 sets were accepted. The delivery of the first 27 sets should be completed by summer 2016. 25 trains were delivered in January 2017. The delivery of the first batch of 27 trains was originally planned by the end of 2013.

In September 2013, Deutsche Bahn ordered a further 17 double-deck ICs with an order value of 293 million euros. On the Gäubahn , these IC2 trains will be temporarily hauled by class 146 locomotives; from 2019, Swiss-capable class 147 machines should be used. Eleven trains of the second series are to follow by December 2017, then the remaining six trains of the second series by March 2018.

At the end of March 2017, another request was made by Deutsche Bahn via 25 additional Intercity double-decker trains. In January 2020, DB Fernverkehr refused to accept the 25 trains of the second part of the 2nd series due to software problems.

Order Start of deployment Control car Middle car total
2011 December 2015 – March 2016 27 108 135
2013 December 2018 17th 68 85
2017 probably 2019 [obsolete] 25th 100 125

Current and planned use

IC line relation (Planned mission frequency Remarks
individual evidence
IC 56 Leipzig - Magdeburg - Hanover - Norddeich under traffic every two hours Reference line;
IC 56 Cottbus - Berlin - Magdeburg - Hanover - Norddeich under traffic Single couple daily
IC 55 Dresden - Leipzig - Hanover - Cologne under traffic every two hours
IC 61 Karlsruhe - Nuremberg under traffic every two hours
IC 17 Dresden - Berlin - Rostock - Warnemünde under traffic every two hours Are used Stadler Kiss trainsets
IC 94/95 Vienna - Passau - Nuremberg - Jena - Leipzig - Berlin - Rostock - Warnemünde under traffic single night train couple Simultaneously a trip to the maintenance center in Vienna for Stadler Kiss multiple units
IC 35 Norddeich - Emden - Münster - Düsseldorf - Cologne to Emden under traffic Three pairs of trains a day Expansion to every two hours until Norddeich 2021
IC 87 Stuttgart - Singen (- Zurich) until singing under traffic every two hours planned to Zurich
IC 34 Münster - Hamm - Dortmund / Unna - Siegen - Frankfurt (Main) 2021 every two hours A pair of trains to Norddeich Mole. Depending on the progress of construction at Stuttgart 21 , an extension of the line to Darmstadt, Heidelberg and Karlsruhe is planned.
IC 56 Leipzig - Magdeburg - Schwerin - Rostock 2022 -
IC 26 Hamburg - Schwerin - Rostock - Stralsund - Berlin 2022 -
IC 65 Berlin - Dresden - Hof - Regensburg - Munich 2022 - at the earliest after the electrification of the railway line between Hof and Regensburg; Partial commissioning from 2022
IC 66 Bamberg - Würzburg - Stuttgart - Tübingen 2028 -
IC 62 Saarbrücken - Stuttgart - Lindau 2029 -
IC 61 Leipzig - Jena - Bamberg - Nuremberg - Karlsruhe 2030 - Every two hours, single trains are already included in the 2018/2019 timetable
IC 51 Chemnitz - Gera - Erfurt - Kassel - Paderborn - Dortmund - Düsseldorf 2032 - at the earliest after the electrification of the railway line between Weimar and Gößnitz

planning

In March 2015, Deutsche Bahn spoke of 120 new double-decker intercity trains that Template: future / in 5 yearsshould be procured by 2030 . The trains should have on-board technology for telephone and internet use.

List of rolling stock

Construction series Fleet (number) Control car assigned locomotive Naming
remark
accidents
First series
(27 wagons and 27 locomotives)
2850 86-81 850 146 554
2851 86-81 851 146 567
2852 86-81 852 146 574
2853 86-81 853 146 551 Saxon Switzerland National Park
2854 86-81 854 146 562
2855 86-81 855 146 568
2856 86-81 856 146 569
2857 86-81 857 146 576
2858 86-81 858 146 577
2859 86-81 859 146 566
2860 86-81 860 146 558
2861 86-81 861 146 573
2862 86-81 862 146 570
2863 86-81 863 146 561
2864 86-81 864 146 552
2865 86-81 865 146 565 Remstal
2866 86-81 866 146 564
2867 86-81 867 146 556
2868 86-81 868 146 553 Lower Saxony Wadden Sea National Park
2869 86-81 869 146 559
2870 86-81 870 146 560
2871 86-81 871 146 555 Leipzig New Lakeland
2872 86-81 872 146 557
2873 86-81 873 146 572
2874 86-81 874 146 571 Upper Neckar
2875 86-81 875 146 563 Magdeburg Börde
2876 86-81 876 146 575
Second series
with Switzerland
numbers in June 2019 changed from 2877–2893 to 4877–4893
(17 car fleets and 17 locomotives)
4877 86-81 877 147 5xx Locomotives 147 555, 556 and 560 have not yet been delivered and accepted, so no assignment is given
4878 86-81 878 147 570 hauled by a locomotive from the third delivery series without a Swiss package
4879 86-81 879 147 571 hauled by a locomotive from the third delivery series without a Swiss package
4880 86-81 880 147 579 hauled by a locomotive from the third delivery series without a Swiss package
4881 86-81 881 147 561
4882 86-81 882 147 554
4883 86-81 883 147 557
4884 86-81 884 147 553
4885 86-81 885 147 559
4886 86-81 886 147 562
4887 86-81 887 147 563
4888 86-81 888 147 564
4889 86-81 889 147 565 On January 23, 2020, this wagon fleet derailed as the Intercity 2382 train journey with three intermediate wagons at the entrance to the Horb station. No one was harmed, the derailed vehicles were slightly damaged. The train was put back on track using a crane.
4890 86-81 890 147 552
4891 86-81 891 147 566
4892 86-81 892 147 551
4893 86-81 893 147 567
Second series
without Switzerland
(25 car fleets and 25 locomotives)
4894 86-81 894 147 569
4895 86-81 895 147 568
4896 86-81 896 147 558 On the road in October / November 2019 for ETCS certification runs in Switzerland with locomotive 147 558 from the second series.
4897 86-81 897 147 5xx
4898 86-81 898 147 5xx
4899 86-81 899 147 572
4900 86-81 900 147 573
4901 86-81 901 147 574
4902 86-81 902 147 575
4903 86-81 903 147 576
4904 86-81 904 147 577
4905 86-81 905 147 578
Stadler Kiss 2
four-part
(9 multiple units)
4110 009
4110 010
4110 011
4110 012 Test vehicle in Westbahn livery for testing new ETCS devices and extending it to 6 cars
4110 013
4110 014 Dresden Elbland
4110 015
4110 016
4110 017 Mecklenburg Baltic Sea coast

literature

  • Heiko Focken: DB double-decker Intercity (IC2): compromise for long-distance traffic ; in: Eisenbahn Magazin , 3/2017, pp. 32–35.

Web links

Commons : Bombardier TwindexxVario-IC from Deutsche Bahn  - Collection of images, videos and audio files
Commons : Series 146.5  - collection of pictures, videos and audio files
Commons : Series 147.5  - collection of pictures, videos and audio files

Individual evidence

  1. https://inside.bahn.de/neuer-intercity/ Retrieved on March 10, 2020
  2. ^ A b Deutsche Bahn AG (ed.): Deutsche Bahn orders 27 new long-distance trains . Modern double-deck cars are to be used on IC lines as early as 2013. January 12, 2011 (press release).
  3. a b Increased . In: mobil , March 2011, pp. 58–59.
  4. ^ Peter Neumann: Trends and bizarre things at the world's largest rail fair in Berlin ; Berliner Zeitung , September 25, 2014, accessed on September 26, 2014.
  5. ^ A b Johannes Dörries: Deutsche Bahn: New IC trains arrive with a delay ; Mitteldeutsche Zeitung , December 15, 2014.
  6. a b c d Jürgen Hörstel: Two-story also in long-distance traffic . In: Your train . tape 44 , no. 5 , 2016, p. 34-38 .
  7. ^ Peter Kirnich: Railway discovers home market: New double-decker IC without dining car . In: Frankfurter Rundschau , January 13, 2011.
  8. https://community.bahn.de/questions/1576562-db-bringt-147-189-km-h-stand-zulassungsverfahren
  9. a b c Intercity 2: data and facts , www.bahn.de, October 2016; accessed on June 30, 2018.
  10. Integrated Interim Report 2018 - Deutsche Bahn Group. (PDF) Deutsche Bahn AG, accessed on July 26, 2018 . P. 25
  11. Franz Purkerer: The two- story Intercity of the train in the test. In: New Westphalian . December 7, 2015, p. 5 , accessed July 7, 2018 .
  12. ^ Twindexx - The new double-decker Intercity of the railway , bahnaktuell.net, January 12, 2011; accessed on July 6, 2018.
  13. a b Jens Schmidt: Double-decker without breakfast . In: Volksstimme . November 4, 2015, p. 2 ( volksstimme.de ).
  14. The new Intercity and the solution to the hot drinks dilemma , inside.bahn.de, December 10, 2015; accessed on July 6, 2018.
  15. Jürgen Lück, Christoph Bielecki, Dietmar Schindler: Vitamin injection for the Gäubahn . In: Black Forest Messenger . February 7, 2014, p. 4 ( regiostadtbahnalbstadt.de ).
  16. ^ Wolfgang Roth, Grafenau: IC2 trains not to Zurich. In: District newspaper Böblinger Bote . February 27, 2019, accessed March 12, 2020 .
  17. a b Editor: Continuous IC 2 double-decker trains come later. In: bahnonline.ch. December 8, 2019, accessed March 12, 2020 .
  18. https://www.otz.de/leben/rueckstufe-im-fernverkehr-kritik-an-neuen-ic-zuegen-die-aus-gera-abfahren-sollen-id220440229.html accessed on November 26, 2019.
  19. Bombardier's Schunkelzug turns into a grave of millions. In: welt.de. September 26, 2016, accessed September 27, 2019 .
  20. ^ Seasick upstairs. In: faz.net. June 1, 2016, accessed September 27, 2019 .
  21. The two-story Intercity of the railway in the test. In: New Westphalian. Retrieved September 27, 2019 .
  22. ^ Norbert Acker: Delays Nuremberg-Stuttgart-Karlsruhe. In: swp.de. Südwest Presse , May 29, 2019, accessed on March 12, 2020 : "IC trains are even less punctual than the national average"
  23. https://www.tagesschau.de/wirtschaft/bahn-bombardier-ic-101.html
  24. IC double-decker car on a presentation tour ; in: Eisenbahn Magazin , 9/2015, p. 26.
  25. approval for double-deck IC ; in: Eisenbahn Magazin , 11/2015, p. 22.
  26. The "Intercity 2" before the start of operations . In: Eisenbahn-Revue International . No.  1 , 2016, p. 48-49 .
  27. Amina Linke, Thomas Husmann: How is it going in the new double-decker Intercity? In: Nordwest-Zeitung . December 13, 2015, accessed July 7, 2018 .
  28. IC line 35 Norddeich – Cologne switched to IC2 ; in: Eisenbahn Magazin , 6/2016, p. 17.
  29. Conversion of the Dresden – Hanover – Cologne line to the modern Intercity 2 ( memento from March 26, 2017 in the Internet Archive ), press release by Deutsche Bahn from August 30, 2016.
  30. 18 trains in circulation ; in: Eisenbahn Magazin , 3/2017, p. 33.
  31. Deutsche Bahn AG (Ed.): DB Group Our Fleets and Networks 2016 . December 31, 2016, p. 7 ( PDF ). PDF ( Memento from March 26, 2017 in the Internet Archive )
  32. ↑ Make space for new orders and trains . In: DB Welt , Region Southeast . No. 3 , 2013, p. 17 .
  33. ↑ Merging instead of selecting. (No longer available online.) In: gdl.de. DB Fernverkehr AG, December 16, 2011, formerly in the original ; Retrieved September 14, 2012 .  ( Page no longer available , search in web archives )@1@ 2Template: Toter Link / www.gdl.de
  34. ^ Gäubahn: IC-2 trial operation ; in: Eisenbahn Magazin , 7/2017, p. 27.
  35. André Dietenberger from reisebloegle.de: The Intercity 2 on the Gäubahn. In: inside.bahn.de. Deutsche Bahn AG, December 8, 2017, accessed on June 4, 2019 .
  36. Fluctuating double-deck ICs are converted. Handelsblatt, December 16, 2016, accessed on February 14, 2019 .
  37. a b Problems with the "Intercity 2" of the DB . In: Eisenbahn-Revue International . No. 4 , 2016, p. 178 .
  38. ↑ A classic false start for new double-decker intercity buses. In: schwäbische.de. Retrieved June 4, 2019 .
  39. Gäubahn - a disaster for the rail industry. In: schwäbische.de. Retrieved June 4, 2019 .
  40. Offer concept successful on the Gäubahn. In: press release. Deutsche Bahn AG, February 13, 2019, accessed on February 14, 2019 .
  41. Bombardier supplies Twindexx double-decker cars and TRAXX locomotives for long-distance traffic to Deutsche Bahn AG , press release on n-tv.de, January 12, 2011; accessed on July 6, 2018.
  42. Test of the new double-decker Intercity. In: BILD.de. Retrieved July 6, 2018 .
  43. Intercity 2 ( Memento from December 22, 2015 in the Internet Archive ), presentation by Deutsche Bahn, accessed on December 13, 2015.
  44. a b Worries about vehicle procurement for DB AG . In: Eisenbahn-Revue International . No. 6 , 2014, p. 286-287 .
  45. Bahn buys new double-decker IC ; Handelsblatt, September 17, 2013.
  46. ^ Deutsche Bahn orders double-decker wagons for IC trains ; The West , September 17, 2013.
  47. New concept on the Gäubahn . In: Eisenbahn-Revue International . No. 2 , February 2018, p. 110-111 .
  48. Bombardier delivers 25 TWINDEXX Vario-Intercity double-decker trains to Deutsche Bahn. Bombardier Transportation, March 30, 2017, accessed July 6, 2018 .
  49. Another IC2 from Bombardier ; in: Eisenbahn Magazin , 6/2017, p. 33.
  50. Markus Balser: Deutsche Bahn refuses to accept 25 IC trains. Breakdown trains. January 28, 2020, accessed January 28, 2020 .
  51. Bahn does not want to accept new Intercity trains due to defects. In: dpa news channel. Süddeutsche Zeitung, January 28, 2020, accessed on January 28, 2020 .
  52. a b c d inside.bahn.de - Intercity 2 runs on these routes, accessed on December 21, 2019
  53. https://reiseauskunft.bahn.de/bin/traininfo.exe/dn/66546/332569/973046/464341/80?ld=36133&protocol=https:&seqnr=6&ident=nz.01170133.1587560254&date=24.08.20&station_evaId=8010073&station_type= dep & currentReferrer = tp & rt = 1 & rtMode = DB-HYBRID && time = 06: 04 & currentJourneyClass = 2 &
  54. Badische Zeitung - long-distance traffic: The railway is increasing its prices on December 9, 2018, accessed on December 21, 2019
  55. https://www.niederlausitz-aktuell.de/niederlausitz/78710/neue-ic2-zuege- between- dresden-und-rostock- Zwischenhalt- elsterwerda.html
  56. https://www.niederlausitz-aktuell.de/niederlausitz/78710/neue-ic2-zuege- between- dresden-und-rostock- Zwischenhalt- elsterwerda.html
  57. http://www.fernverkehr-jena.de/news/items/aenderungen-im-fahrplan-2020.html
  58. Gießener Anzeiger - No stop: IC line 34 drives past Gießen, June 13, 2019 accessed on June 14, 2019
  59. a b IC route will not be extended to Chemnitz for the time being. In: Free Press. May 9, 2019, accessed June 21, 2019 .
  60. a b More rail for metropolises and regions: The largest customer offensive in the history of DB long-distance transport. (PDF; 3.12 MB) Deutsche Bahn AG, March 18, 2015, pp. 16, 17 , archived from the original on April 4, 2015 ; accessed on July 7, 2018 (presentation).
  61. Written on the locomotive and control car.
  62. The numbers of the driving cars correspond to the numbers of the rolling stock.
  63. The numbers of the locomotives are not synchronized with the fleet numbers.
  64. Writing on the control car.
  65. Intercity 2 christened “National Park Saxon Switzerland”. (No longer available online.) In: deutschebahn.com. Deutsche Bahn, May 20, 2017, archived from the original on November 13, 2017 ; accessed on July 6, 2018 .
  66. An Intercity 2 with the name "Remstal"
  67. More than 350 guests jointly name an Intercity 2 "Lower Saxony Wadden Sea National Park" ; September 8, 2018.
  68. After the derailment of the IC train, further impairments in traffic
  69. Premiere for the new Intercity "Dresden Elbland": Line Dresden - Berlin - Rostock takes off. Accessed August 21, 2020 .
  70. IC "Mecklenburgische Ostseeküste": Large station for new Intercity canceled due to coronavirus | Nordkurier.de. March 6, 2020, accessed August 21, 2020 .