Vorderrhein power plants

from Wikipedia, the free encyclopedia
Kraftwerke Vorderrhein AG
(Ovras Electrica Reinanteriur SA)
legal form Corporation
founding 1956
Seat Disentis / Mustér
management Jörg Huwyler
sales 33.7 million SFr. (2014/2015)
Branch power supply

Vorderrhein power plants
Santa Maria reservoir
Santa Maria reservoir
location
Vorderrhein power plants (Canton of Graubünden)
Vorderrhein power plants
Coordinates 708 107  /  173 625 coordinates: 46 ° 42 '18 "  N , 8 ° 51' 8"  O ; CH1903:  708107  /  one hundred and seventy-three thousand six hundred and twenty-five
country SwitzerlandSwitzerland Switzerland
Waters Reservoir Curnera , Reservoir Nalps , Lai da Sontga Maria , Upper Rhine , Medelser Rhine , Sumvitger Rhein
Data
Type two-stage storage power plant group
Primary energy water
power Total output
331 MW

Centers:
Sedrun 1: 150 MW
Tavanasa (KVR): 180 MW
Endowment center:
Sedrun 2: 0.75 MW

owner Axpo Power : 81.5%
Canton of Graubünden 10%
municipalities 8.5%
operator Axpo Power
Project start 1956
Start of operations Tavanasa (KVR): 1962
Sedrun: 1968
turbine Central Sedrun 1 :
3 double Pelton turbines
1 Pelton turbine for own use
Central Sedrun 2 :
1 Kaplan turbine for own use

Central Tavanasa (KVR) :
4 double Pelton turbines
2 Pelton turbines for personal use

Energy fed in per year Total: 828 GWh
Sedrun 1: 261 GWh
Tavanasa (KVR): 563 GWh
was standing 2020
f2

The power stations front Rhine AG , abbreviated KVR , Romansh Ovras Electrica SA Reinanteriur , abbreviated ORA , is a producer holder and distributor of electric power based in Disentis / Mustér in the Swiss canton of Grisons . The main shareholder of KVR is Axpo AG with 81.5% of the share capital.

The KVR systems built between 1962 and 1968 include reservoirs and power plant centers in the Vorderrhein Valley - the catchment area accordingly includes the Vorderrhein and its tributaries.

Investments

Vorderrhein power plants (Switzerland)
Sedrun power plant
Sedrun power plant
Tavanasa power plant
Tavanasa power plant
Vorderrhein power plants

The total catchment area of ​​the plants is 316 km², the three reservoirs together contain around 152 million m³. The net capacity of the three lakes is on two power levels in the power plant Central Sedrun ( 701652  /  170207 ) and Tavanasa ( seven hundred twenty-two thousand eight hundred seventy-six  /  179028 ) used. The latter power plant was taken over by HOVAG .

Three horizontal-axis Pelton turbines with an output of 50 MW are installed in the Sedrun power plant. The processed water is in the compensation basin Runcahez (1961) ( 716 974  /  171056 ) between stored and further used in the power plant Tavanasa. Four horizontal-axis Pelton turbines with an output of 45 MW are installed in the latter. After the Tavanasa power plant stage, the processed water is returned to the Vorderrhein. The total installed capacity of the two power plants is 331 MW.

In the switchgear of Tavanasa 380/220 kV lines to Disentis-Sedrun and Bonaduz, as well as the start preliminary line . The KVR is involved in the high voltage network in Switzerland and uses identical long-distance lines with the NOK.

Web links

Individual evidence

  1. ^ Commercial register office of the Canton of Graubünden (ed.): Aktiengesellschaft CHE-101.466.028 . Commercial register extract. May 8, 2020 ( chregister.ch ).
  2. swissdams.ch: data from the Runcahez wall of weights ( memento from April 23, 2012 in the Internet Archive )
  3. Strom.ch of May 30, 2012: Renewed Sedrun power plant inaugurated