Wrexham and Ellesmere Railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m clean up, replaced: publisher=Ian Allan → publisher=Ian Allan (2) using AWB
 
(34 intermediate revisions by 28 users not shown)
Line 1: Line 1:
{{Short description|Former railway line between Ellesmere, England and Wrexham, Wales}}
{| {{Railway line header}}
The '''Wrexham and Ellesmere Railway''' was a railway line that ran from [[Wrexham]] in North Wales, to [[Ellesmere, Shropshire|Ellesmere]] in [[Shropshire]], England. The line opened in 1895 and closed in 1962, except for a residual goods service which itself closed in 1981.
{{BS-header|Wrexham and Ellesmere Railway|collapse=yes}}
{{BS-table}}
|colspan="1"|
{{BS3||exCONTg||||''[[Oswestry, Ellesmere and Whitchurch Railway]] to [[Whitchurch railway station (Shropshire)|Whitchurch]]''}}
{{BS3||exBHF|||{{rws|Ellesmere}}}}
{{BS3||exABZlf|exCONTl|||''[[Oswestry, Ellesmere and Whitchurch Railway]] to {{rws|Oswestry}}''|}}
{{BS3||exHST|||Elson Halt}}
{{BS3||exHST|||Trench Halt}}
{{BS3||exGRENZE||||''England/Wales border''}}
{{BS3||exHST|||Overton-on-Dee}}
{{BS3||exHST|||Cloy Halt}}
{{BS3||exHST|||{{rws|Bangor-on-Dee}}}}
{{BS3||exHST|||Pick Hill Halt}}
{{BS3||exHST|||Sesswick Halt}}
{{BS3||exHST|||Marchwiel}}
{{BS3||exHST|||Hightown Halt}}
{{BS3||exHST|||Wrexham Central (1st site - 1887-1998)}}
{{BS3||KBHFxa|||{{rws|Wrexham Central}}}}
{{BS3|STRrg|KRZu|CONTl|||''[[Shrewsbury and Chester Railway]] to {{rws|Shrewsbury}}''|}}
{{BS3|CPICl|CPICr|||{{rws|Wrexham General}}}}
{{BS3|STR|eABZgl+l|exCONTl|||''[[Wrexham and Minera Railway#Wrexham, Mold and Connah's Quay branch|WMCQ Brymbo Branch]]'' (Gwersyllt Junction)|}}
{{BS3|eABZlf|eKRZu|exCONTl|||''[[Wrexham and Minera Railway]] ([[Wheatsheaf junction]])''|}}
{{BS3|STR|CONTf||||''[[Wrexham, Mold and Connah's Quay Railway]] to {{rws|Shotton}}''}}
{{BS3|CONTf|||||''[[Shrewsbury and Chester Railway]] to {{rws|Chester}}''}}
|}
|}
[[File:Wrexham Central railway station 2048484 00a59e8b.jpg|thumb|right|250px|View southeast towards {{rws|Wrexham Central}} in 1959]]
[[File:Bangor-on-Dee geograph-2614770-by-Ben-Brooksbank.jpg|thumb|right|250px|Ex-[[Great Western Railway|GWR]] [[Charles Collett|Collett]] [[GWR 4800 Class|4800 class 0-4-2T]] No.1432 and [[GWR Autocoach]] at {{rws|Bangor-on-Dee}}, 19 April 1962]]
The '''Wrexham and Ellesmere Railway''' was a railway line that ran from [[Wrexham]] in [[North Wales]], to [[Ellesmere, Shropshire|Ellesmere]] in [[Shropshire]], [[England]]. The line opened in 1895 and closed in 1962. It was a constituent part of the [[Cambrian Railways]].


The line had been conceived as part of a through route to by-pass the dominant [[Great Western Railway]] route, but this destiny was never realised, and the line was simply a rural branch. It was worked by the [[Cambrian Railways]] effectively as part of that company's system. [[Wrexham]] was then the largest town served by the Cambrian Railways.<ref name = christiansen2>Rex Christiansen and R W Miller, ''The Cambrian Railways: volume II: 1889 - 1968'', David & CHarles, Newton Abbot, {{ISBN|0 7153 4220 7}}</ref>
==Background: Cambrian Railways==
{{main|Cambrian Railways}}
Proposed to be formed from the amalgamation of a series of local regional railway companies,<ref name=DisStat>{{cite web|url=http://www.disused-stations.org.uk/o/oswestry/index.shtml|title=Oswestry|publisher=disused-stations.org.uk|accessdate=2012-02-05}}</ref> as a result the new company called [[Cambrian Railways|Cambrian Railways (CR)]] proposed to base its headquarters in {{rws|Oswestry}}. On completion, the station would form the mainline for the [[London and North Western Railway|London and North Western Railway (LNWR)]], from [[Whitchurch railway station (Shropshire)|Whitchurch]] on the [[Crewe and Shrewsbury Railway]], to [[Welshpool railway station|Welshpool]] in Mid-Wales.<ref>{{cite web|url=http://www.bbc.co.uk/shropshire/history/2003/03/oswestry_railway_01.shtml|title=Oswestry Railway|publisher=BBC Shropshire|accessdate=2012-02-05}}</ref>


==The Oswestry, Ellesmere and Whitchurch Railway==
The first connection to [[Oswestry]] was made from the south by the [[Oswestry and Newtown Railway]], which operated its first train on 1 May 1860.<ref name=DisStat/> After a legal tussle between the two competing companies, LNWR and the [[Great Western Railway|Great Western Railway (GWR)]], Parliament authorised building the CR/LNWR sponsored [[Oswestry, Ellesmere and Whitchurch Railway]] to Whitchurch in August 1861, driven by the need to regenerate [[Ellesmere, Shropshire|Ellesmere]]. However, the proposed route was heavily fought over by land owners, with the eventual tracks running via [[Fenn's Moss]], requiring additional civil engineering, support and drainage to overcome the local [[bog]] conditions. On the 25 July 1864 the CR was formally created, allowing the first CR train to the run from Whitchurch into Oswestry two days later on 27 July 1864.<ref name=DisStat/> A year later the coast lines joined the CR too. On grouping in 1923, Cambrian Railways became part of the [[Great Western Railway]].
[[File:Wrexham Central railway station 2048484 00a59e8b.jpg|thumb|right|250px|Wrexham Central station in 1959, looking south east]][[Whitchurch, Shropshire|Whitchurch]] was on the [[Shrewsbury]] to [[Crewe]] main line of the [[London and North Western Railway]], opened in 1858. [[Oswestry]] already had a railway connection, since 1849; it was on a branch line from [[Gobowen]], on the Shrewsbury to [[Chester]] main line, at this time part of the [[Great Western Railway]].


The [[Oswestry, Ellesmere and Whitchurch Railway]] was authorised to build its line on 1 August 1861, connecting these two competing networks, across largely agricultural terrain. Parliament ordered that construction should start from the Whitchurch end, and the line opened from Whitchurch to Ellesmere for goods trains on 20 April 1863. It opened throughout on 27 July 1864.
==History==
The LNWR wished to make further connections with the CR, and hence proposed an extension of the existing joint [[Wrexham, Mold and Connah's Quay Railway]] (WMCQ) from {{rws|Wrexham Central}} to meet the new CR line at {{rws|Ellesmere}}.


In fact a group of local companies in the area had been in negotiation about merging, and this took effect on 25 July 1864. Accordingly the [[Oswestry and Newtown Railway]], the [[Newtown and Machynlleth Railway]], the [[Llanidloes and Newtown Railway]] and the Oswestry, Ellesmere and Whitchurch Railway merged to form the [[Cambrian Railways]].<ref name = jenkins>Stanley C. Jenkins and John M Strange, ''The Wrexham and Ellesmere Railway'', The Oakwood Press, Usk, 2004, {{ISBN|0 85361 617 5}}, pages 9 to 13</ref>
The WMCQ had opened between {{stnlnk|Wrexham General}} and Buckley (old station) on 1 May 1866.<ref>{{cite book |last=Dow |first=George |authorlink=George Dow |title=Great Central, Volume Three: Fay Sets the Pace, 1900-1922 |year=1965 |publisher=[[Ian Allan Publishing|Ian Allan]] |location=Shepperton |isbn=0-7110-0263-0 |page=49 |ref=harv }}</ref> A southern extension to a station better situated for the centre of Wrexham was authorised on 18 August 1882;<ref>{{harvnb|Dow|1965|p=62}}</ref> work did not begin until January 1887, and it was opened on 1 November the same year.<ref name=Dow65>{{harvnb|Dow|1965|p=65}}</ref> {{rws|Wrexham Central}} was a large station, with a [[marshalling yard]] and [[goods depot]] accompanying it. The station clock was provided and maintained free of charge by a local watchmaker named Pierce.<ref name=Dow65 />


==Wrexham, Mold and Connah's Quay Railway==
Built jointly by the WMCQ and the CR, the Wrexham and Ellesmere Railway was built as a branchline, opened on 2 November 1895. It was operated totally by the CR.<ref name=Dow65 />
Minerals extracted in the Wrexham area needed an outlet to points of consumption, and a group of mine owners and others met at the end of 1861 to discuss a new railway that would take the minerals to the [[River Dee, Wales|River Dee]] for shipment. The scheme became the [[Wrexham, Mold and Connah's Quay Railway]], and it opened for goods and mineral traffic on 1 January 1866 from Wrexham to [[Buckley, Flintshire|Buckley]], where it joined the Buckley Railway. Passenger operation was delayed until 1 May 1866, by which time improvements had been put in place. In 1864 the WM&CQR gained Parliamentary authority to make a branch from Wrexham to Whitchurch, but this was not proceeded with due to the inability to raise the capital necessary.<ref name = jenkins19/>


==Wrexham and Ellesmere Railway==
===World War 2: ROF Wrexham===
[[File:Wrex&amp;elles.png|thumb|The Wrexham and Ellesmere Railway in 1895]]Wrexham was a centre of mineral extraction, and the London and North Western Railway was steadily developing interests in the district. A connection between Ellesmere and Wrexham would be a useful link in a chain of lines serving that purpose. The [[Manchester, Sheffield and Lincolnshire Railway]] had an interest in the development also, and was prepared to collaborate with the LNWR in encouraging a local scheme.
{{main|ROF Wrexham}}
In the build-up to [[World War II]], a number of [[shadow factory|shadow factories]] were built in preparation, located in the Northwest of the British Isles to be out of range of the [[Luftwaffe]].


The Wrexham and Ellesmere Railway was incorporated by Act of Parliament on 31 July 1885, sponsored chiefly by [[Benjamin Piercy]], who had become a promoter of railways, in collaboration with [[Henry Robertson]] MP. The capital was £180,000. However the economy suffered a serious trade depression at this time, and it proved impossible to raise the needed money. Worse was to follow in February 1888, when both Piercy and Robertson died.<ref name = jenkins/><ref name = baughan>Peter E Baughan, ''A Regional History of the Railways of Great Britain: volume 11: North and Mid Wales'', David St John Thomas, Nairn, 1991, {{ISBN|0 946537 59 3}}, pages 161 and 162</ref>
The [[Royal Ordnance Factory]] relocated a number of workers to various sites, and built a number of new factories, including [[ROF Wrexham]]. The site employed 13,000 workers,<ref name="cof1">B.A.Malaws, RCAHMW, 2003-08-29 [http://www.coflein.gov.uk/en/site/308980/details/MARCHWIEL+ROYAL+ORDNANCE+FACTORY,+WREXHAM/](Retrieved 2011-01-05)</ref> making [[cordite]], an explosive propellent for shells.<ref name="cof2">G.M.Edwards, RCAHMW, 2003-09-25 [http://www.coflein.gov.uk/en/site/308980/details/MARCHWIEL+ROYAL+ORDNANCE+FACTORY,+WREXHAM/](Retrieved 2011-01-05)</ref> Spread out over a large site to minimise any potential explosive or bombing damage, the main buildings were camouflaged and existing farm buildings were left ''in situ'' to help protect the site against reconnaissance. The [[Ministry of Works (United Kingdom)|Ministry of Works]] built a large water abstraction and treatment plant at Sesswick on the [[River Dee, Wales|River Dee]], just to supply the plant, which was amalgamated into the Wrexham Water Company (now [[Dee Valley Water]]) in 1951.<ref>[http://www.deevalleywater.co.uk/article.php?id=42 A History of Water in Wrexham]</ref>


==Wrexham Central station==
To connect the site to the national rail network via the [[Wrexham and Minera Railway#Wrexham, Mold and Connah's Quay branch|WMCQ Brymbo Branch]] at Gwersyllt Junction. Within the site a large [[marshalling yard]] of 10 separate roads connected to the works internal network of rail lines. A passenger platform was built for military usage. All cordite produced at the plant was taken by these sidings, along the W&ER and forwarded to Crewe.<ref>The Wrexham and Ellesmere Railway - Stanley C. Jenkins and John M Strange - [http://en.wikipedia.org/w/index.php?title=Special%3ABookSources&isbn=0853616175 ISBN 0-85361-617-5]</ref>
The WM&CQR line ran into Wrexham from the north, and lay immediately to the west of the GWR line. The WM&CQR station ("Wrexham Exchange") and the GWR station ("Wrexham General") were correspondingly alongside one another, both on the western margin of the town. The WM&CQR Built an extension line with a new Wrexham Central station; the short branch passed under the GWR line and ran east. It opened on 1 November 1887, and double track was installed on 1 September 1888. The branch may have been to facilitate the expected Ellesmere line, or it may have been to ensure retention of the Wrexham traffic for itself in the event the passengers deserted the Exchange station in favour of the more convenient Central station.<ref name = jenkins19>Jenkins and Strange, pages 19 to 21</ref>


Christiansen sees the sequence differently:
==Closure==
Having been a constituent part of the GWR, in 1963 the former CR lines were to be passed to [[London Midland Region]] of [[British Railways]]. It was hence decided as part of the [[Beeching cuts]] to close the old CR mainline to Shrewsbury, but as a precursor to transfer the decision was made to close the W&ER on 10 September 1962.<ref>{{cite book |last=Kidner |first=R.W. |title=The Cambrian Railways |edition=2nd |series=The Oakwood Library of Railway History |year=1992 |origyear=1954 |publisher=Oakwood Press |location=Headington |isbn=0-85361-439-3 |id=OL55 |page=178 |ref=harv }}</ref>


<blockquote>The object of the WM&CQ’S extension to Wrexham Central became apparent towards the end of 1884 with the announcement of plans for building a new line from Wrexham... to Ellesmere. The Wrexham & Ellesmere Railway was duly incorporated on 31 July 1885. The Manchester, Sheffield & Lincolnshire chairman, Sir [[Edward Watkin]], saw the branch as a spearhead for a drive into Wales. He suggested that the GWR should finance it jointly with the Cambrian, WM&CQ and his own company, but with its position in Wrexham strategically secure the GWR declined. The MS&LR then paid £50,000 towards the £180,000 needed, with the Cambrian and WM&CQ as the other main subscribers. With this capital and £50,000 [permitted] in loans the Wrexham & Ellesmere was incorporated.<ref name = christiansen>Rex Christiansen and R W Miller, ''The Cambrian Railways: volume I: 1852-1888'', David & Charles, Newton Abbot, 1967 and 1971, {{ISBN|0 7153 5236 9}}, pages 100 and 101</ref></blockquote>
==Present==
In light of the closure of the W&ER, {{rws|Wrexham Central}} almost closed as well, apart from the fact that the town was undergoing substantial growth. Kept open but substantially rebuilt, today most of its former site and workings are occupied by the Island Green Retail Park. The former viaduct that ran from the embankment east of the original Wrexham Central was demolished in the late 1990s to form the St Giles Way road.


{{anchor|Wrexham and Ellesmere Railway (Extension of Time) Act 1890}}
While {{rws|Ellesmere}} still stands, now converted to offices, the rest of the W&ER has been removed, the land repatriated to its original farms.
{{Infobox UK legislation
| short_title = Wrexham and Ellesmere Railway (Extension of Time) Act 1890
| type = Act
| parliament = Parliament of the United Kingdom
| long_title = An Act to extend the time for the purchase of Lands for and for the completion of the Wrexham and Ellesmere Railway and for other purposes.
| year = 1890
| citation = [[53 & 54 Vict.]] c. xxv
| introduced_commons =
| introduced_lords =
| territorial_extent =
| royal_assent = 22 May 1890
| commencement =
| expiry_date =
| repeal_date =
| amends =
| replaces =
| amendments =
| repealing_legislation =
| related_legislation =
| status =
| legislation_history =
| theyworkforyou =
| millbankhansard =
| original_text =
| revised_text =
| use_new_UK-LEG =
| UK-LEG_title =
| collapsed = yes
}}
[[File:Bangor-on-Dee geograph-2614770-by-Ben-Brooksbank.jpg|thumb|A train at Bangor-on-Dee]]Having obtained authorisation for the line in 1885, the proprietors of the Wrexham and Ellesmere Railway had to apply to Parliament for an extension of the time allowed for construction; this was secured in 1888 (extension to July 1893) and again in 1890 ([[53 & 54 Vict.]] c. xxv), when an extension to July 1895 was obtained. As the possible South Wales trunk route idea firmed up, the company also obtained powers, on 14 May 1895, for a west-to-north curve at Ellesmere, that would allow through running there. In this period the company chairman and many of the directors were also officers or directors of the Manchester, Sheffield and Lincolnshire Railway or the WM&CQR, or the Cambrian Railways.<ref name = jenkins19/><ref name = baughan/>


==Construction and opening==
==References==
[[File:Bangor-on-Dee Station, 1862854 5e291cdb.jpg|thumb|Bangor-on-Dee station]]The necessary finance was eventually arranged, and on 11 July 1892 the first sod of the Wrexham and Ellesmere Railway was turned. Although only {{convert|12|mi}} in extent, the line took three years in the building; there was a considerable extent of demolition of dwellings in Wrexham to make way for the line, as the Central station terminus was converted to a through station. The route included a 58m single span crossing of the [[River Dee, Wales|River Dee]]; delivery of the girders was delayed, putting back the opening of the line.<ref name = boyd>James I C Boyd, The Wrexham, Mold and Connah's Quay Railway'', Oakwood Press, Headington, 1991, {{ISBN|0 85361 417 2}}</ref> Although the line was single, overbridges were built for double track. A special excursion was run from Wrexham to Ellesmere on 2 July 1895, considerably in advance of obtaining the [[Board of Trade]] inspector’s approval for passenger operation.<ref name = jenkins19/>
*{{cite book |last=Dow |first=George |authorlink=George Dow |title=Great Central, Volume Three: Fay Sets the Pace, 1900-1922 |year=1965 |publisher=[[Ian Allan Publishing|Ian Allan]] |location=Shepperton |isbn=0-7110-0263-0 |page=49 |ref=harv }}


The line opened for ordinary passenger traffic on 2 November 1895. There were stations at Marchwiel, Bangor-on-Dee and Overton-on-Dee; the line was single throughout with passing loops at the stations; the triangular junction at Ellesmere was operational from the start. The line was worked by the Cambrian Railways. There were five or six passenger services in each direction in the early years. In summer a through train ran from Chester to Aberystwyth, using the west curve at Ellesmere.<ref name = jenkins29>Jenkins and Strange, pages 29 to 31</ref><ref name = christiansen2/>
===Notes===
{{reflist}}


Nevertheless, the line never developed a role as a through trunk route; it and the other lines necessary for a trunk journey were predominantly single track and slow, and the sponsoring railway companies were unwilling to expend the considerable sums that would have been necessary to realise that ambition. Accordingly the line remained of local transport significance, with Wrexham forming the hub for local commerce.
==External links==

{{Commons category}}
Additional halts were opened at Sesswick and Trench in 1913 and 1914.<ref name = jenkins29/><ref name = baughan/>
*[http://www.railbrit.co.uk/Wrexham_and_Ellesmere_Railway/frame.htm Wrexham and Ellesmere Railway @ railbrit.co.uk]

==The west loop at Ellesmere==
The Ellesmere loop allowing direct running towards Oswestry was not in fact much used. It fell into disuse by 1903; it was reopened in 1905 but again closed later.<ref name = jenkins29/> It may have seen its main existence after 1911;<ref name = cobb>Col M H Cobb, ''The Railways of Great Britain: A Historical Atlas'', Ian Allan Limited, Shepperton</ref> Christiansen and Miller say

<blockquote>To improve the flow of through traffic a triangular junction was laid at Ellesmere in 1911 and the Wrexham-Oswestry curve was double-tracked as an extra crossing loop. As the union concept <ref group = note>Supported by the Welsh Railways Through Traffic Act of 1889, the Union of railways was intended to enable and promote collaboration for through working of mineral trains from South Wales northward.</ref> stagnated the curve fell out of use, and it was lifted in 1921 when it became clear that the through traffic which had been diverted via Whitchurch and Crewe as a wartime measure [during [[World War I]]] would never return.<ref name = christiansen2/></blockquote>

==Auto trains==
The introduction of pull-and-push operation for local passenger services in 1913 was associated with new halts at Sesswick (October 1913) and Trench (December 1914).<ref name = christiansen2/>

==Financial performance==
The Wrexham and Ellesmere Railway was little used by passengers, serving a sparsely inhabited area. However the routing of through mineral trains brought a steady income and in 1913, the last year of independence, gross receipts totalled £10,836; the Company paid 3 per cent dividends in the nine years to grouping. However the income was a small fraction of what had been forecast before construction.<ref name = christiansen2/>

==Grouping of the railways, and later==
In 1923 the main line railways of Great Britain were grouped, pursuant to the [[Railways Act 1921]]. Four new railway companies were established, and the Cambrian Railways and the pre-existing Great Western Railway were constituents of the new Great Western Railway. As it was effectively part of the Cambrian Railways the Wrexham and Ellesmere Railway passed into Great Western Railway ownership. In due course the line was classified as Dotted Blue for route availability purposes.

The new owners spent some money on improving the line, introducing the Electric Train Tablet system of signalling the single line, in place of the former Train Staff and Ticket system. A new halt was opened at [[Hightown, Wrexham|Hightown]], near Wrexham, and later at Cloy, Elson and Pickhill. However the passenger operation on the line was plainly loss-making, and the GWR eliminated the staffing at the intermediate stations, which became unstaffed halts. The motor-trolley system of track maintenance was introduced.

The Wrexham end of the line was at the old Wrexham, Mold and Connah's Quay terminus, now converted to a through station.

Notwithstanding the sponsoring companies' objective, of by-passing the GWR route, it was not until 1895 that a west-to-north spur at Ellesmere was authorised in Parliament. In fact it was not much used, and was soon closed, reopening in 1905. The lengthy and awkward route for heavy coal shipments from South Wales discouraged the LNWR from developing the traffic on this axis. There was some through passenger traffic from the Great Central Railway (as the MS&LR had become) system to Aberystwyth, but local traffic was small and the line's income was correspondingly limited.<ref name = jenksin35>Jenkins and Strange, pages 35 to 51</ref>

==World War II==
The year 1939 marked the beginning of [[World War II]]. At first passenger services on the line were reduced, but after an interval they were restored.

An ordnance depot was opened at Marchwiel; it was titled ROF Wrexham, and its railway connection and branch line consisted of about nine miles of siding track. Moreover several other locations on the line were brought into army support use. So intensive was the goods traffic in this connection that the suspension of the passenger service on the line was ordered; this took place from 10 June 1940.<ref name = jenkins61>Jenkins and Strange, pages 61 to 64</ref>

==After the war==
Following the cessation of hostilities, the passenger service was restored on 6 May 1946. A service of eight trains each way every weekday was put on, operated by auto-trains.

The transfer of passengers and goods transport to road vehicles had been experienced in the 1930s and now accelerated, so that the decline in use of the railway line was steep. Losses mounted and in 1960 it was announced that the line would be closed, excepting only a residual goods service from Wrexham to Cadbury's Creamery at Pickhill. The closure duly took place on 10 September 1962. The residual goods activity itself declined, and the line closed completely in May 1981.<ref name = jenkins127>Jenkins and Strange, page 127</ref>

==Location list==
{{Use dmy dates|date=July 2015}}
{{Use British English|date=July 2015}}
{{Wrexham and Ellesmere Railway|collapse=yes}}

''Note: all the intermediate stations on the line were closed to passengers on 10 June 1940, and reopened on 6 May 1946. They closed finally on 10 September 1962.'' <ref name = baughan/><ref name = quick>Michael quick, Railway Passenger Stations in England, Scotland and Wales: A Chronology, the Railway and Canal Historical Society, Richmond, Surrey, 2002</ref>

* Ellesmere; Cambrian Railways station; closed 18 January 1965.
* Cambrian Junction; divergence from the line to Oswestry.
* Ellesmere North Junction; convergence of the Ellesmere loop; called Wrexham Junction South Loop, according to Christiansen.<ref name = christiansen2-75>Christiansen and Miller, volume 2, page 75</ref>
* Elson Halt; opened 8 February 1937.
* Trench Halt; opened November 1914.
* Overton-on-Dee; opened 2 November 1895.
* Cloy Halt; opened as Caedyah Halt 30 June 1932; renaming date early, but uncertain.
* Bangor-on-Dee; opened 2 November 1895.
* Pickhill Halt; opened 30 May 1938.
* Sesswick Halt; opened October 1913.
* ''Marchwiel Royal Ordnance Factory Sidings.''
* Marchwiel; opened 2 November 1895.
* Hightown Halt; opened 9 July 1923.
* Wrexham Central; Great Central Railway (WM&CQR) station; still open.<ref name = jenkins139>Jenkins and Strange, pages 139 to 142</ref><ref name = cooke>R A Cooke, ''Atlas of the Great Western Railway as at 1947'', Wild Swan Publications, Didcot, 1997, {{ISBN|1 874103 38 0}}</ref><ref name = cobb/>

==Topography==

The line descended from each end to a low point near Bangor-on-Dee. Climbing away from that location in either direction involved gradients of 1 in 86 northwards and 1 in 81 southward, and a more or less continuous steep climb each way.<ref name = christiansen2-22>Christiansen and Miller, volume 2, page 22</ref>

==Royal Ordnance Factory, Wrexham==
{{main article|ROF Wrexham}}
In the build-up to [[World War II]], a number of [[shadow factory|shadow factories]] were built in preparation, located in the Northwest of the British Isles to be out of range of the [[Luftwaffe]].

The [[Royal Ordnance Factory]] relocated a number of workers to various sites, and built a number of new factories, including [[ROF Wrexham]]. The site employed 13,000 workers,<ref name="cof1">B.A.Malaws, RCAHMW, 2003-08-29 [http://www.coflein.gov.uk/en/site/308980/details/MARCHWIEL+ROYAL+ORDNANCE+FACTORY,+WREXHAM/](Retrieved 2011-01-05)</ref> making [[cordite]], an explosive propellent for shells.<ref name="cof2">G.M.Edwards, RCAHMW, 2003-09-25 [http://www.coflein.gov.uk/en/site/308980/details/MARCHWIEL+ROYAL+ORDNANCE+FACTORY,+WREXHAM/](Retrieved 2011-01-05)</ref> Spread out over a large site to minimise any potential explosive or bombing damage, the main buildings were camouflaged and existing farm buildings were left ''in situ'' to help protect the site against reconnaissance. The [[Ministry of Works (United Kingdom)|Ministry of Works]] built a large water abstraction and treatment plant at Sesswick on the [[River Dee, Wales|River Dee]], just to supply the plant, which was amalgamated into the Wrexham Water Company (now [[Dee Valley Water]]) in 1951.<ref>[http://www.deevalleywater.co.uk/article.php?id=42 A History of Water in Wrexham]</ref>

==Notes==
{{reflist | group = note}}

==References==
{{reflist}}


{{Historical Welsh railway companies}}
{{Historical Welsh railway companies}}
Line 76: Line 142:
[[Category:Transport in Wrexham County Borough]]
[[Category:Transport in Wrexham County Borough]]
[[Category:Rail transport in Shropshire]]
[[Category:Rail transport in Shropshire]]
[[Category:1861 establishments in the United Kingdom]]

Latest revision as of 12:00, 22 March 2024

The Wrexham and Ellesmere Railway was a railway line that ran from Wrexham in North Wales, to Ellesmere in Shropshire, England. The line opened in 1895 and closed in 1962, except for a residual goods service which itself closed in 1981.

The line had been conceived as part of a through route to by-pass the dominant Great Western Railway route, but this destiny was never realised, and the line was simply a rural branch. It was worked by the Cambrian Railways effectively as part of that company's system. Wrexham was then the largest town served by the Cambrian Railways.[1]

The Oswestry, Ellesmere and Whitchurch Railway[edit]

Wrexham Central station in 1959, looking south east

Whitchurch was on the Shrewsbury to Crewe main line of the London and North Western Railway, opened in 1858. Oswestry already had a railway connection, since 1849; it was on a branch line from Gobowen, on the Shrewsbury to Chester main line, at this time part of the Great Western Railway.

The Oswestry, Ellesmere and Whitchurch Railway was authorised to build its line on 1 August 1861, connecting these two competing networks, across largely agricultural terrain. Parliament ordered that construction should start from the Whitchurch end, and the line opened from Whitchurch to Ellesmere for goods trains on 20 April 1863. It opened throughout on 27 July 1864.

In fact a group of local companies in the area had been in negotiation about merging, and this took effect on 25 July 1864. Accordingly the Oswestry and Newtown Railway, the Newtown and Machynlleth Railway, the Llanidloes and Newtown Railway and the Oswestry, Ellesmere and Whitchurch Railway merged to form the Cambrian Railways.[2]

Wrexham, Mold and Connah's Quay Railway[edit]

Minerals extracted in the Wrexham area needed an outlet to points of consumption, and a group of mine owners and others met at the end of 1861 to discuss a new railway that would take the minerals to the River Dee for shipment. The scheme became the Wrexham, Mold and Connah's Quay Railway, and it opened for goods and mineral traffic on 1 January 1866 from Wrexham to Buckley, where it joined the Buckley Railway. Passenger operation was delayed until 1 May 1866, by which time improvements had been put in place. In 1864 the WM&CQR gained Parliamentary authority to make a branch from Wrexham to Whitchurch, but this was not proceeded with due to the inability to raise the capital necessary.[3]

Wrexham and Ellesmere Railway[edit]

The Wrexham and Ellesmere Railway in 1895

Wrexham was a centre of mineral extraction, and the London and North Western Railway was steadily developing interests in the district. A connection between Ellesmere and Wrexham would be a useful link in a chain of lines serving that purpose. The Manchester, Sheffield and Lincolnshire Railway had an interest in the development also, and was prepared to collaborate with the LNWR in encouraging a local scheme.

The Wrexham and Ellesmere Railway was incorporated by Act of Parliament on 31 July 1885, sponsored chiefly by Benjamin Piercy, who had become a promoter of railways, in collaboration with Henry Robertson MP. The capital was £180,000. However the economy suffered a serious trade depression at this time, and it proved impossible to raise the needed money. Worse was to follow in February 1888, when both Piercy and Robertson died.[2][4]

Wrexham Central station[edit]

The WM&CQR line ran into Wrexham from the north, and lay immediately to the west of the GWR line. The WM&CQR station ("Wrexham Exchange") and the GWR station ("Wrexham General") were correspondingly alongside one another, both on the western margin of the town. The WM&CQR Built an extension line with a new Wrexham Central station; the short branch passed under the GWR line and ran east. It opened on 1 November 1887, and double track was installed on 1 September 1888. The branch may have been to facilitate the expected Ellesmere line, or it may have been to ensure retention of the Wrexham traffic for itself in the event the passengers deserted the Exchange station in favour of the more convenient Central station.[3]

Christiansen sees the sequence differently:

The object of the WM&CQ’S extension to Wrexham Central became apparent towards the end of 1884 with the announcement of plans for building a new line from Wrexham... to Ellesmere. The Wrexham & Ellesmere Railway was duly incorporated on 31 July 1885. The Manchester, Sheffield & Lincolnshire chairman, Sir Edward Watkin, saw the branch as a spearhead for a drive into Wales. He suggested that the GWR should finance it jointly with the Cambrian, WM&CQ and his own company, but with its position in Wrexham strategically secure the GWR declined. The MS&LR then paid £50,000 towards the £180,000 needed, with the Cambrian and WM&CQ as the other main subscribers. With this capital and £50,000 [permitted] in loans the Wrexham & Ellesmere was incorporated.[5]

Wrexham and Ellesmere Railway (Extension of Time) Act 1890
Act of Parliament
Long titleAn Act to extend the time for the purchase of Lands for and for the completion of the Wrexham and Ellesmere Railway and for other purposes.
Citation53 & 54 Vict. c. xxv
Dates
Royal assent22 May 1890
A train at Bangor-on-Dee

Having obtained authorisation for the line in 1885, the proprietors of the Wrexham and Ellesmere Railway had to apply to Parliament for an extension of the time allowed for construction; this was secured in 1888 (extension to July 1893) and again in 1890 (53 & 54 Vict. c. xxv), when an extension to July 1895 was obtained. As the possible South Wales trunk route idea firmed up, the company also obtained powers, on 14 May 1895, for a west-to-north curve at Ellesmere, that would allow through running there. In this period the company chairman and many of the directors were also officers or directors of the Manchester, Sheffield and Lincolnshire Railway or the WM&CQR, or the Cambrian Railways.[3][4]

Construction and opening[edit]

Bangor-on-Dee station

The necessary finance was eventually arranged, and on 11 July 1892 the first sod of the Wrexham and Ellesmere Railway was turned. Although only 12 miles (19 km) in extent, the line took three years in the building; there was a considerable extent of demolition of dwellings in Wrexham to make way for the line, as the Central station terminus was converted to a through station. The route included a 58m single span crossing of the River Dee; delivery of the girders was delayed, putting back the opening of the line.[6] Although the line was single, overbridges were built for double track. A special excursion was run from Wrexham to Ellesmere on 2 July 1895, considerably in advance of obtaining the Board of Trade inspector’s approval for passenger operation.[3]

The line opened for ordinary passenger traffic on 2 November 1895. There were stations at Marchwiel, Bangor-on-Dee and Overton-on-Dee; the line was single throughout with passing loops at the stations; the triangular junction at Ellesmere was operational from the start. The line was worked by the Cambrian Railways. There were five or six passenger services in each direction in the early years. In summer a through train ran from Chester to Aberystwyth, using the west curve at Ellesmere.[7][1]

Nevertheless, the line never developed a role as a through trunk route; it and the other lines necessary for a trunk journey were predominantly single track and slow, and the sponsoring railway companies were unwilling to expend the considerable sums that would have been necessary to realise that ambition. Accordingly the line remained of local transport significance, with Wrexham forming the hub for local commerce.

Additional halts were opened at Sesswick and Trench in 1913 and 1914.[7][4]

The west loop at Ellesmere[edit]

The Ellesmere loop allowing direct running towards Oswestry was not in fact much used. It fell into disuse by 1903; it was reopened in 1905 but again closed later.[7] It may have seen its main existence after 1911;[8] Christiansen and Miller say

To improve the flow of through traffic a triangular junction was laid at Ellesmere in 1911 and the Wrexham-Oswestry curve was double-tracked as an extra crossing loop. As the union concept [note 1] stagnated the curve fell out of use, and it was lifted in 1921 when it became clear that the through traffic which had been diverted via Whitchurch and Crewe as a wartime measure [during World War I] would never return.[1]

Auto trains[edit]

The introduction of pull-and-push operation for local passenger services in 1913 was associated with new halts at Sesswick (October 1913) and Trench (December 1914).[1]

Financial performance[edit]

The Wrexham and Ellesmere Railway was little used by passengers, serving a sparsely inhabited area. However the routing of through mineral trains brought a steady income and in 1913, the last year of independence, gross receipts totalled £10,836; the Company paid 3 per cent dividends in the nine years to grouping. However the income was a small fraction of what had been forecast before construction.[1]

Grouping of the railways, and later[edit]

In 1923 the main line railways of Great Britain were grouped, pursuant to the Railways Act 1921. Four new railway companies were established, and the Cambrian Railways and the pre-existing Great Western Railway were constituents of the new Great Western Railway. As it was effectively part of the Cambrian Railways the Wrexham and Ellesmere Railway passed into Great Western Railway ownership. In due course the line was classified as Dotted Blue for route availability purposes.

The new owners spent some money on improving the line, introducing the Electric Train Tablet system of signalling the single line, in place of the former Train Staff and Ticket system. A new halt was opened at Hightown, near Wrexham, and later at Cloy, Elson and Pickhill. However the passenger operation on the line was plainly loss-making, and the GWR eliminated the staffing at the intermediate stations, which became unstaffed halts. The motor-trolley system of track maintenance was introduced.

The Wrexham end of the line was at the old Wrexham, Mold and Connah's Quay terminus, now converted to a through station.

Notwithstanding the sponsoring companies' objective, of by-passing the GWR route, it was not until 1895 that a west-to-north spur at Ellesmere was authorised in Parliament. In fact it was not much used, and was soon closed, reopening in 1905. The lengthy and awkward route for heavy coal shipments from South Wales discouraged the LNWR from developing the traffic on this axis. There was some through passenger traffic from the Great Central Railway (as the MS&LR had become) system to Aberystwyth, but local traffic was small and the line's income was correspondingly limited.[9]

World War II[edit]

The year 1939 marked the beginning of World War II. At first passenger services on the line were reduced, but after an interval they were restored.

An ordnance depot was opened at Marchwiel; it was titled ROF Wrexham, and its railway connection and branch line consisted of about nine miles of siding track. Moreover several other locations on the line were brought into army support use. So intensive was the goods traffic in this connection that the suspension of the passenger service on the line was ordered; this took place from 10 June 1940.[10]

After the war[edit]

Following the cessation of hostilities, the passenger service was restored on 6 May 1946. A service of eight trains each way every weekday was put on, operated by auto-trains.

The transfer of passengers and goods transport to road vehicles had been experienced in the 1930s and now accelerated, so that the decline in use of the railway line was steep. Losses mounted and in 1960 it was announced that the line would be closed, excepting only a residual goods service from Wrexham to Cadbury's Creamery at Pickhill. The closure duly took place on 10 September 1962. The residual goods activity itself declined, and the line closed completely in May 1981.[11]

Location list[edit]

Wrexham and Ellesmere Railway
Ellesmere
Elson Halt
Trench Halt
England
Wales
border
Overton-on-Dee
Cloy Halt
Bangor-on-Dee
Pickhill Halt
Sesswick Halt
Marchwiel
Hightown Halt
Wrexham Central
(
moved
1998
)
Wrexham General
Gwersyllt Junction
WMCQ Brymbo Branch

Note: all the intermediate stations on the line were closed to passengers on 10 June 1940, and reopened on 6 May 1946. They closed finally on 10 September 1962. [4][12]

  • Ellesmere; Cambrian Railways station; closed 18 January 1965.
  • Cambrian Junction; divergence from the line to Oswestry.
  • Ellesmere North Junction; convergence of the Ellesmere loop; called Wrexham Junction South Loop, according to Christiansen.[13]
  • Elson Halt; opened 8 February 1937.
  • Trench Halt; opened November 1914.
  • Overton-on-Dee; opened 2 November 1895.
  • Cloy Halt; opened as Caedyah Halt 30 June 1932; renaming date early, but uncertain.
  • Bangor-on-Dee; opened 2 November 1895.
  • Pickhill Halt; opened 30 May 1938.
  • Sesswick Halt; opened October 1913.
  • Marchwiel Royal Ordnance Factory Sidings.
  • Marchwiel; opened 2 November 1895.
  • Hightown Halt; opened 9 July 1923.
  • Wrexham Central; Great Central Railway (WM&CQR) station; still open.[14][15][8]

Topography[edit]

The line descended from each end to a low point near Bangor-on-Dee. Climbing away from that location in either direction involved gradients of 1 in 86 northwards and 1 in 81 southward, and a more or less continuous steep climb each way.[16]

Royal Ordnance Factory, Wrexham[edit]

In the build-up to World War II, a number of shadow factories were built in preparation, located in the Northwest of the British Isles to be out of range of the Luftwaffe.

The Royal Ordnance Factory relocated a number of workers to various sites, and built a number of new factories, including ROF Wrexham. The site employed 13,000 workers,[17] making cordite, an explosive propellent for shells.[18] Spread out over a large site to minimise any potential explosive or bombing damage, the main buildings were camouflaged and existing farm buildings were left in situ to help protect the site against reconnaissance. The Ministry of Works built a large water abstraction and treatment plant at Sesswick on the River Dee, just to supply the plant, which was amalgamated into the Wrexham Water Company (now Dee Valley Water) in 1951.[19]

Notes[edit]

  1. ^ Supported by the Welsh Railways Through Traffic Act of 1889, the Union of railways was intended to enable and promote collaboration for through working of mineral trains from South Wales northward.

References[edit]

  1. ^ a b c d e Rex Christiansen and R W Miller, The Cambrian Railways: volume II: 1889 - 1968, David & CHarles, Newton Abbot, ISBN 0 7153 4220 7
  2. ^ a b Stanley C. Jenkins and John M Strange, The Wrexham and Ellesmere Railway, The Oakwood Press, Usk, 2004, ISBN 0 85361 617 5, pages 9 to 13
  3. ^ a b c d Jenkins and Strange, pages 19 to 21
  4. ^ a b c d Peter E Baughan, A Regional History of the Railways of Great Britain: volume 11: North and Mid Wales, David St John Thomas, Nairn, 1991, ISBN 0 946537 59 3, pages 161 and 162
  5. ^ Rex Christiansen and R W Miller, The Cambrian Railways: volume I: 1852-1888, David & Charles, Newton Abbot, 1967 and 1971, ISBN 0 7153 5236 9, pages 100 and 101
  6. ^ James I C Boyd, The Wrexham, Mold and Connah's Quay Railway, Oakwood Press, Headington, 1991, ISBN 0 85361 417 2
  7. ^ a b c Jenkins and Strange, pages 29 to 31
  8. ^ a b Col M H Cobb, The Railways of Great Britain: A Historical Atlas, Ian Allan Limited, Shepperton
  9. ^ Jenkins and Strange, pages 35 to 51
  10. ^ Jenkins and Strange, pages 61 to 64
  11. ^ Jenkins and Strange, page 127
  12. ^ Michael quick, Railway Passenger Stations in England, Scotland and Wales: A Chronology, the Railway and Canal Historical Society, Richmond, Surrey, 2002
  13. ^ Christiansen and Miller, volume 2, page 75
  14. ^ Jenkins and Strange, pages 139 to 142
  15. ^ R A Cooke, Atlas of the Great Western Railway as at 1947, Wild Swan Publications, Didcot, 1997, ISBN 1 874103 38 0
  16. ^ Christiansen and Miller, volume 2, page 22
  17. ^ B.A.Malaws, RCAHMW, 2003-08-29 [1](Retrieved 2011-01-05)
  18. ^ G.M.Edwards, RCAHMW, 2003-09-25 [2](Retrieved 2011-01-05)
  19. ^ A History of Water in Wrexham