Heathrow Connect
Heathrow Connect | |
---|---|
Basic information | |
Parent company |
Heathrow Airport Holdings Great Western Railway |
statistics | |
fleet | 5 British Class 360 |
Train stations | 8th |
Main line | Paddington Railway Station - London Heathrow |
Branch line | - |
website | |
heathrowconnect.com |
Heathrow Connect | |||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Heathrow Connect was the name of a train connection between London Heathrow Airport and Paddington Station in central London . She associated with railcar of the British class 360 on the same route as the Heathrow Express but with more intermediate stops. Since May 2018, the route has been operated by TfL Rail as part of the Crossrail project .
history
Heathrow Connect started operations on June 13, 2005 as a joint venture between the rail company First Great Western and the airport operator BAA Limited . The offer was originally aimed primarily at BAA employees and residents of western London. The former receive a discount on the fare with their employee ID; the offer was initially less known to tourists. Heathrow Connect is now being advertised as a cheaper but slower alternative to the Heathrow Express.
In order to increase capacity, the four-part train units were lengthened by one car each in 2008. The former Heathrow Connect connections have been part of TfL Rail since May 2018 and will become part of the Elizabeth Line once the Crossrail is completed.
offer
Heathrow Connect trains run every 30 minutes and after departing Paddington stop at Ealing Broadway , West Ealing (closed on Sundays), Hanwell (closed on Sundays), Southall , Hayes & Harlington , Heathrow Terminals 2 & 3 and Heathrow Terminal 4 vv., The use of the Heathrow Express is required to continue to Terminal 5 .
The journey between the train station of Terminals 2 & 3 and Terminal 4 is free of charge. The Travelcard is only valid on the section between Paddington and Hayes & Harlington. A surcharge is due for the onward journey to the airport.
Rolling stock
model series | image | Type | V / max |
passenger cars |
number | Seat layout | Construction year |
---|---|---|---|---|---|---|---|
British class 360 | Railcar ( electric ) | 161 km / h | 5 | 5 | 2 + 3 | 2004-2005 | |
See also
Web links
- Web presence of Heathrow Connect (English)