Armonia

from Wikipedia, the free encyclopedia
Armonia GT4MT
An Armonia on Line 2, 2018
An Armonia on Line 2, 2018
Number: 30th
Manufacturer: Astra Vagoane Călători /
Electroputere VFU
Year of construction (s): 2015-2018
Gauge : 1435 mm ( standard gauge )
Length: 18,380 mm
Width: 2,310 mm
Empty mass: 24,300 kg
Top speed: 50 km / h
Power system : 600 V DC
Seats: 29
Standing room: 135 (with six people per square meter)

Armonia , romanian for harmony , is a specially for the tram Timişoara designed railcars -series. The 30 standard-gauge and high-floor short articulated wagons were manufactured between 2015 and 2018 and are structurally based heavily on the German Wegmann urban railway wagons of the GT4d, GT4e and GT4f series from the 1970s. These came used from the Bremen tram to Timișoara between 2007 and 2010 and served as donor wagons for the new Armonia type, also known as GT4MT , with the “M” standing for modernizat and the “T” for Timișoara. The originally planned name Revolut , however, could not prevail.

history

As a result of the Romanian revolution of 1989 , the then transport company replaced Regia Autonomă de Transport Timişoara ( RATT ), which since 2017 as de Societatea Transport Public Timişoara (STPT) operates, its originally made entirely of native Timis 2 - Greater trains existing fleet from 1995 completely altbrauchbare Tram cars from Germany . The consequence, however, was an inhomogeneous and outdated vehicle inventory, which caused high repair costs and numerous breakdowns, especially due to the difficult supply of spare parts.

After the originally planned procurement of 50 Citadis - Niederflurwagen 2011 failed for financial reasons, the former RATT, decided in 2013 to let German cars completely reconstructed. They were to receive modern electronics and a contemporary interior design using the old car bodies and traction motors. Originally, 50 old railcars were planned for this, the modernization of which would have cost 75 million euros.

In 2014, the transport company again modified its plans and awarded a contract worth 14.4 million euros for the reconstruction of almost all Wegmann railcars from the 1970s, a total of 30 of 33 cars, to a consortium from the Astra Vagoane Călători company in Arad and Electroputere VFU in Paşcani , each plant renewing 15 cars. A GT4 prepared in this way for the Iași tram in 2012 served as a model for the conversions, but it remained a one-off.

As part of the modernization program, which lasted until 2018, the Wegmann wagons received new front and rear sections made of plastic, new electrical equipment with electronic control from ICPE-SAERP from Bucharest , a braking system from Henning & Kahl , 1 + 1 seating with 29 seats. and 135 standing places, air conditioning for the driver's cab and passenger compartment, a single-arm pantograph , a lift for wheelchairs, video surveillance , a camera to monitor passenger changes and WiFi . Furthermore, since the conversion, they can only drive a maximum of 50 km / h and are no longer suitable for use with a sidecar , they only have an emergency coupling for towing.

De facto, the conversion was tantamount to a new building, as only the main chassis and bogies were taken over from the donor wagons , but the entire vehicle body including equipment was completely new. The original main landing gear had to be converted and significantly reinforced. The superstructure elements are based in part on standard parts of the low-floor Siemens Combino and Astra Imperio types , which were placed on the high-floor vehicle frame of the Wegmann car. The profiles were welded, the elements of the outer skin made of glass fiber reinforced plastic , glass and plastic were glued. The two new three-phase asynchronous motors of the type TN A 14 from UMEB are switched by IGBT technology and each have an output of 200 kilowatts. The company VRG Railway Components from Bistrița was responsible for the overall design .

The first two converted cars, number 3504 from Arad and 3517 from Paşcani, arrived in Timişoara in late June and early July 2015, respectively. The renewed vehicles kept the vehicle numbers of their donor vehicles and entered regular passenger service at the end of 2015. Initially they were only used on lines 1, 2, 6 and 9, which already have a modernized track infrastructure throughout. Since April 2018 the Armonia wagons have also been running sporadically on Line 7, and since July 2018 on Lines 4 and 8 and thus on all lines.

statistics

Dispenser series Construction year Company number Registration number Conversion in
GT4d 1973 3502 TM 00144 Arad
3504 TM 00778 Paşcani
3509 TM 00462 Arad
3510 TM 00311 Arad
3511 TM 00779 Arad
GT4e 1974 3512 TM 00309 Paşcani
3513 TM 00303 Paşcani
3514 TM 00760 Paşcani
3515 TM 00755 Paşcani
3516 TM 00464 Arad
3517 TM 00595 Arad
3518 TM 00457 Paşcani
3519 TM 00870 Paşcani
3520 TM 00468 Arad
3521 TM 00466 Paşcani
GT4f 1976 3525 TM 01169 Paşcani
3527 TM 01163 Arad
3529 TM 01110 Arad
3531 TM 01112 Paşcani
3534 TM 00307 Paşcani
3536 TM 01114 Arad
3539 TM 00305 Paşcani
3540 TM 01165 Arad
3543 TM 01116 Arad
3547 TM 01118 Paşcani
3551 TM 00599 Arad
3552 TM 00597 Arad
3553 TM 00759 Paşcani
3554 TM 00315 Paşcani
3559 TM 00313 Arad

Of the original 61 Wegmann railcars, a total of 38 came to Timișoara, of which 30 were converted into Armonia railcars.

literature

  • Horia Radulescu: Troubled Harmony - The GT4MT “New Cars” in Timisoara, in: Tram Magazine 11/2018, pp. 42–51

Web links

Individual evidence

  1. a b c d e Horia Radulescu: Troubled Harmony - The GT4MT “New Cars” in Timisoara, in: Tram Magazine 11/2018, pp. 42–51
  2. Robu merge sa vada tramvaie reabilitate , message on Timis online from February 12, 2013
  3. Timisorenii ar putea avea primul tramvai reabilitat in toamna , report on Timiș Online from May 6, 2014
  4. Timișoara presents modernized trams , article on railwaygazette.com from July 14, 2015
  5. Timisoara are un new model de tramvai on www.tion.ro, accessed on July 11, 2015
  6. Sapte tramvaie Armonia noi before circula din luna noiembrie prin Timisoara , report on tion.ro from October 20, 2016
  7. Roxana Deaconescu: Sa stricat armonia! Primaria, data in judecata de una dintre firmele care modernizeaza tramvaiele Timisoarei, pentru lucrari suplimentare de 3,5 milioane de lei , article from April 12, 2018 on tion.ro, accessed on June 3, 2018