Comanche Peak Nuclear Power Plant
Comanche Peak Nuclear Power Plant | ||
---|---|---|
location | ||
|
||
Coordinates | 32 ° 17 '53 " N , 97 ° 47' 8" W | |
Country: | United States | |
Data | ||
Owner: | Energy Future Holdings Corporation | |
Operator: | Energy Future Holdings Corporation | |
Project start: | 1972 | |
Commercial operation: | Aug 13, 1990 | |
Active reactors (gross): |
2 (2378 MW) | |
Energy fed in since commissioning: | 236,788 GWh | |
Was standing: | March 18, 2008 | |
The data source of the respective entries can be found in the documentation . |
The Comanche Peak nuclear power plant ( English Comanche Peak Nuclear Generating Station ) with two pressurized water reactors is located in Somervell County in the US state of Texas .
history
Construction of both blocks began on December 19, 1974. The power plant is operated by Energy Future Holdings Corporation. The first block went online on April 24, 1990. The second block followed three years later on April 9, 1993.
The delay in commissioning the two reactors was caused by opposition from environmentalists and a private vigilante group. The National Regulatory Commission (NRC) had to keep improving the safety standards. Construction costs, originally estimated at $ 779 million, increased to $ 7.7 billion.
The two identical Westinghouse reactors have a net electrical output of 1218 and 1207 megawatts and a gross output of 1259 and 1250 megawatts, respectively. Unit 2 was the penultimate US reactor that went online; the last was Watts Bar 1 .
In June 2008 an increase in benefits was approved.
In December 2016 it became known that Comanche Peak was also affected by the Creusot Forge scandal over falsified certificates. Parts of the steam generator of reactor 1 come from the polluted Areva subsidiary.
Data of the reactor blocks
The Comanche Peak nuclear power plant has two blocks :
Reactor block | Reactor type | net power |
gross power |
start of building | Network synchronization |
Commercialization of essential operation |
switching off processing |
---|---|---|---|---|---|---|---|
Comanche Peak-1 | Pressurized water reactor | 1218 MW | 1259 MW | December 19, 1974 | April 24, 1990 | 08/13/1990 | 08.02.2030 planned |
Comanche Peak-2 | Pressurized water reactor | 1207 MW | 1250 MW | December 19, 1974 | 04/09/1993 | 08/03/1993 | 02/02/2033 planned |
swell
- ↑ DER SPIEGEL 16/1988: The voracious monster of April 18, 1988
- ↑ http://www.world-nuclear-news.org/IT_Comanche_Peak_to_increase_output_3006081.html
- ↑ http://pbadupws.nrc.gov/docs/ML0817/ML081790334.pdf
- ↑ https://nrcpublicblog.files.wordpress.com/2017/01/ml17009a275.pdf
- ↑ Power Reactor Information System of the IAEA : "United States of America: Nuclear Power Reactors - Alphabetic" (English)
Web links
- Plague: Comanche Peak (USA)