Salem nuclear power plant
Salem nuclear power plant | ||
---|---|---|
Salem nuclear power plant | ||
location | ||
|
||
Coordinates | 39 ° 27 '47 " N , 75 ° 32' 3" W | |
Country: | United States | |
Data | ||
Owner: | PSEG Power, Inc., Exelon Generation LLC | |
Operator: | PSEG Power, Inc. | |
Project start: | 1966 | |
Commercial operation: | June 30, 1977 | |
Active reactors (gross): |
2 (2398 MW) | |
Energy fed in in 2007: | 18,827 GWh | |
Energy fed in since commissioning: | 352,555 GWh | |
Was standing: | June 25, 2008 | |
The data source of the respective entries can be found in the documentation . |
The Salem Nuclear Power Plant ( english Salem Nuclear Power Plant ) is in the state of New Jersey near Lower Alloway Creek Township, Salem County and one of 42.59% of Exelon Generation LLC and 57.41% of PSEG Nuclear LLC, which the Power plant operates. The Hope Creek nuclear power station is right next door .
history
The power plant was planned from 1966. Construction of units 1 and 2 began on September 25, 1968. The two pressurized water reactors were built by the Westinghouse company . Commercial operation of Unit 1 began on June 30, 1977, and Unit 2 on October 13, 1981.
Operating license
In the USA, the Nuclear Regulatory Commission (NRC) grants an operating license for a nuclear power plant for a period of up to 40 years. The 40 year period was originally based on the fixed asset depreciation period . The Atomic Energy Act of 1954 allows the operating license to be extended (even several times) by 20 years at a time.
The original operating license for Unit 1 was granted to the operator PSEG Nuclear, LLC on December 1, 1976 by the NRC. It was extended on June 30, 2011 to August 13, 2036.
The original permit for Block 2 was granted on May 20, 1981. It was extended on June 30, 2011 to April 18, 2040.
Data of the reactor blocks
Reactor block | Reactor type | net power |
gross power |
start of building | Network synchronization |
Commercialization of essential operation |
operating permit |
Shutdown |
---|---|---|---|---|---|---|---|---|
Salem-1 | Pressurized water reactor | 1,174 MW | 1,228 MW | 09/25/1968 | December 25, 1976 | 06/30/1977 | 08/13/2036 | |
Salem-2 | Pressurized water reactor | 1,130 MW | 1,170 MW | 09/25/1968 | 06/03/1981 | 10/13/1981 | 04/18/2040 |
See also
Web links
Individual evidence
- ^ Backgrounder on Reactor License Renewal. Nuclear Regulatory Commission (NRC), accessed August 18, 2016 .
- ^ Subsequent License Renewal Background. NRC, accessed August 18, 2016 .
- ↑ Salem Nuclear Generating Station, Unit 1. NRC, accessed on August 18, 2016 (English).
- ↑ Salem Nuclear Generating Station, Unit 2. NRC, accessed on August 18, 2016 .
- ↑ Power Reactor Information System of the IAEA : "United States of America: Nuclear Power Reactors" (English)