Palisades Nuclear Power Plant

from Wikipedia, the free encyclopedia
Palisades Nuclear Power Plant
Palisades Nuclear Power Plant
Palisades Nuclear Power Plant
location
Palisades Nuclear Power Plant, Michigan
Palisades Nuclear Power Plant
Coordinates 42 ° 19 ′ 21 ″  N , 86 ° 18 ′ 42 ″  W Coordinates: 42 ° 19 ′ 21 ″  N , 86 ° 18 ′ 42 ″  W
Country: United States
Data
Owner: Entergy Corporation
Operator: Entergy Nuclear
Commercial operation: December 31, 1971

Active reactors (gross):

1 (842 MW)
Energy fed in in 2007: 5,826 GWh
Energy fed in since commissioning: 141,913 GWh
Website: The nuclear power plant on the side of the operator (English)
Was standing: July 31, 2008
The data source of the respective entries can be found in the documentation .
f1

The Palisades nuclear power plant ( English Palisades Nuclear Generating Station ) has a pressurized water reactor that was built by Combustion Engineering . It is located in Covert Township ( Van Buren County ) on the east bank of Lake Michigan in the US state of Michigan .

history

Construction of the nuclear power plant began in 1967 and went into commercial operation on December 31, 1971.

For the techniques used when replacing the two steam generators in 1992, Bechtel received the NOVA Prize from the Construction Innovation Forum.

In 2004 the Nuclear Regulatory Commission (NRC) approved a net power increase of 1.4% from 780 MW to 792 MW.

The operating license issued originally ran until March 24, 2011. An application made in 2005 to extend the operating license by 20 years was approved by the NRC on January 17, 2007, so the license will run until March 21, 2031.

The power plant was sold by Consumers Energy to Entergy in April 2007 for $ 380 million . On December 8, 2016, Entergy announced that it would shut down the power plant on October 1, 2018 for economic reasons. At the end of September 2017, the operator finally announced that the system should remain in operation until spring 2022.

Palisades Nuclear Power Plant
The nuclear power plant from the north

Data of the reactor block

Reactor block Reactor type net
power
gross
power
start of building Network
synchronization
Commercialization
of essential operation
switching off
processing
Palisades Pressurized water reactor 778 MW 842 MW 03/14/1967 December 31, 1971 December 31, 1971 Planned for spring 2022

swell

  1. a b Operating Experience History - PALISADES ( English ) IAEO . Retrieved July 31, 2008.
  2. 1992 NOVA Award Winners ( English ) The Construction Innovation Forum. 1998. Archived from the original on October 7, 2008. Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. Retrieved November 1, 2009.  @1@ 2Template: Webachiv / IABot / www.cif.org
  3. Fact Sheet on Power Uprates for Nuclear Plants ( English ) Nuclear Regulatory Commission. February 22, 2008. Retrieved July 30, 2008.
  4. Palisades Nuclear Plant - License Renewal Application ( English ) Nuclear Regulatory Commission. June 19, 2007. Accessed July 31, 2008.
  5. http://world-nuclear-news.org/C-Palisades-to-close-in-2018-0912168.html
  6. http://midwestenergynews.com/2017/09/28/palisades-nuclear-plant-in-michigan-to-shut-down-in-2022/
  7. Power Reactor Information System of the IAEA : "United States of America: Nuclear Power Reactors - Palisades" (English)
  8. Nuklearforum.ch: USA: Palisades is to be shut down early on December 12, 2016

See also