Ellerstrasse underground station

from Wikipedia, the free encyclopedia
Ellerstrasse
Stadtbahn.svg
Subway station in Düsseldorf
Ellerstrasse
Basic data
District Oberbilk
Opened June 15, 2002
Tracks (platform) 2 ( side platform )
Coordinates 51 ° 12 '40 "  N , 6 ° 48' 29"  E Coordinates: 51 ° 12 '40 "  N , 6 ° 48' 29"  E
use
Stretch) Trunk line 1
Line (s) U 74 U 77 U 79
Switching options 721 722 732

The Ellerstraße underground station is a station on the Düsseldorf Stadtbahn . It lies in the course of the newly built southern route of the North Rhine-Westphalian state capital Düsseldorf in Oberbilk .

location

The underground station itself is located at the junction of Ellerstrasse and Kölner Strasse . Kölner Straße is an important traffic artery in the district.

Station complex

The train station can be reached via escalators and an elevator. The upper level of the station is the distribution level and leads to the lower platform level. The latter has two side platforms where the lines towards Holthausen and towards Duisburg or Meerbusch / Am Seestern stop.

traffic

The Ellerstraße underground station is located on the first trunk line of the Düsseldorf light rail network. All three lines operating on this route serve the station. In addition to the transfer options between the individual tram lines, there are other transfer connections to three bus lines, which stop at an above-ground stop along Kölner Straße and connect to the Düsseldorf local transport network.

The neighboring city and the northern districts of Wittlaer , Kaiserswerth and Lohausen can be reached via the line from Duisburg . The lines branching off into the left bank of the Rhine connect the local districts of Oberkassel and Lörick as well as the neighboring town of Meerbusch . In the direction of the old town there is a connection to the central transfer point Heinrich-Heine-Allee. There you can change to several tram and bus lines and from 2014 to the third main route, the so-called Wehrhahn Line . In front of it is the Düsseldorf Hbf interchange station , which links the Stadtbahn with the Rhein-Ruhr S-Bahn and other regional and long-distance connections. In the further course of the first trunk line, the districts of Wersten , Holthausen and Benrath to the south , as well as the Heinrich Heine University and the Botanical Garden will be connected.

With one exception, all light rail lines are served by the Düsseldorf Rheinbahn alone. This forms the U79 line, which is operated jointly with the Duisburger Verkehrsgesellschaft . For example, high-floor trams of the type B80C run on the U79 line operated by the Duisburger Verkehrsgesellschaft . In addition, as on all other lines, type B80D wagons, also high-floor, are used here.

The following light rail lines serve the underground station:

line course Tact
U 74 Meerb. - Osterath , Görgesheide 1 - Hoterheide - Kamperweg - Bovert - Haus Meer 2 - Forsthaus - Büderich , Landsknecht -) D-Lörick 3 - Löricker Straße - Lohweg - Prinzenallee  MetroBus Düsseldorf.png- Heerdter Sandberg - Rheinbahnhaus 4a - Belsenplatz  4b - MetroBus Düsseldorf.png Barbarossaplatz - Luegplatz - Tonhalle / Ehrenhof - U  Heinrich-Heine-Allee Light rail - U  Steinstraße / Königsallee - U  Oststraße - U  Düsseldorf Hbf 5 - Deutsche Bahn AG-Logo.svg Train U  Oberbilker Markt / Warschauer Straße - U  Ellerstraße - U  D-Oberbilk Train - Kaiserslautener Straße - Provinzialplatz - Werstener Dorfstraße - Opladener Straße - Ickerswarder Straße - Elbruchstraße - D-Holthausen  6MetroBus Düsseldorf.png
High-floor operation of the Rheinbahn ; Line belongs to the Düsseldorf night network ;
Section 1-3: Sa 8-15 pm every 30 min and MF in the morning HVZ twice 3-6;
Sections 3–6: different frequency Mon – Fri 9–11 p.m., Sat 8–11 p.m. and Sun 1–3 p.m. every 15 minutes, Sat – Sun 0–4 a.m., Sat 5–7 p.m. and Sun 9 a.m. – 1 p.m. ( and 5–9 am in section 4a / b-6) every 30 min;
Non-stop trains between Krefeld and D-Holthausen Mon – Fri 9–11 p.m., Sat 8–23 p.m. and Sun 1–3 p.m. from Krefeld from 3 am as U 74 and from Holthausen from 5 as U 76.
20 min (3–6)
U 77 D-Lörick , Am Seestern MetroBus Düsseldorf.png - Prinzenallee  MetroBus Düsseldorf.png- Heerdter Sandberg - Rheinbahnhaus - Belsenplatz MetroBus Düsseldorf.png - Barbarossaplatz - Luegplatz - Tonhalle / Ehrenhof - U  Heinrich-Heine-Allee Light rail - U  Steinstraße / Königsallee - U  Oststraße - U  Düsseldorf Hbf 5 - Deutsche Bahn AG-Logo.svg Train U  Oberbilker Markt / Warschauer Street - U  Ellerstraße - U  D-Oberbilk Train - Kaiserslautener Straße - Provinzialplatz - Werstener Dorfstraße - Opladener Straße - Ickerswarder Straße - Elbruchstraße - D-Holthausen MetroBus Düsseldorf.png  )
High-floor operation of the Rheinbahn ; Operates only Mon – Fri 5 am–8pm and every 30 minutes on Sat 7 am–8pm
20 min
U 79 D-Universität Ost / Botanical Garden - Südpark - Werstener Dorfstraße - Provinzialplatz - Kaiserslauterner Straße - U  D-Oberbilk Train - U  Ellerstraße - U  Oberbilker Markt / Warschauer Straße - U  Düsseldorf Hbf - Deutsche Bahn AG-Logo.svg Train U  Oststraße - U  Steinstraße / Königsallee - U  Heinrich-Heine- Allee Light rail - U  Nordstraße - U  Victoriaplatz / Klever Straße - Kennedydamm - Golzheimer Platz - Theodor-Heuss-Brücke MetroBus Düsseldorf.png - Reeser Platz - Nordpark / Aquazoo - Messe Ost / Stockumer Kirchstraße - Freiligrathplatz MetroBus Düsseldorf.png - Lohausen - Alte Landstraße - Kittelbachstraße - Klemensplatz - Kalkumer Schlossallee - Am Mühlenacker - Wittlaer 1 - D-Froschenteich - DU-Kesselsberg - Angerbogen (never in operation) - St. Anna Hospital - Sittardsberg - Mühlenkamp - Münchener Straße - Waldfriedhof - Im Schlenk - Kulturstraße - Grunewald depot - Grunewald - Karl-Jarres-Straße - Kremerstraße - Musfeldstraße - Platanenhof - U  Steinsche Gasse - U  König-Heinrich-Platz - U  Duisburg Hbf - Deutsche Bahn AG-Logo.svg Train U  Duissern 2 (- U  Auf dem Damm - U  DU-Meiderich Bf 3 )RWB Bahnhof.svg
High-floor operation of the Rheinbahn and DVG ; former D-Bahn ; A special timetable applies during the school holidays.
15-minute intervals Mon – Fri 7–8 p.m., 20-minute intervals Fri 5–7 p.m. and 30-minute intervals Mon – Fri 7–10 p.m. (up to 3) and Sat 7–8 p.m. (up to 2)
10 min (up to 1)
10/20 min (up to 3)

Additional information

Logo of the Rhein-Ruhr Stadtbahn

See also

literature

  • Friedhelm Blennemann: U-Bahn and light rail in Germany planning construction operation . alba, Düsseldorf 1975, ISBN 3-87094-304-1
  • Office for traffic management state capital Düsseldorf (ed.): Lichtblicke im Untergrund . State capital Düsseldorf, Düsseldorf 2003
  • Christoph Groneck, Paul Lohkemper, Robert Schwandl: Rhein-Ruhr Stadtbahn Album 1 . Robert Schwandl Verlag, Berlin 2005, ISBN 3-936573-06-9
  • Fritz D. Kegel: U-Bahn in Germany planning construction operation . alba, Düsseldorf 1971

Web links

Commons : U-Bahnhof Ellerstrasse  - Collection of images

Individual evidence

  1. Rheinbahn AG line plan Düsseldorf ( Memento of the original from March 22, 2007 in the Internet Archive ) Info: The @1@ 2Template: Webachiv / IABot / www.rheinbahn.de archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. As of December 6, 2007
Previous station Düsseldorf light rail Next station
Oberbilker Markt / Warschauer Strasse
← Meerbusch, Görgesheide
U 74
K-Bahn
Oberbilk Benrath, depot →Train
Oberbilker Markt / Warschauer Straße
← At the Seestern
U 77
K-Bahn
Oberbilk Holthausen →Train
Oberbilker Markt / Warschauer Straße
←  Duisburg-Meiderich train station
U 79
D-Bahn
Oberbilk University East / Botanical Garden →Train