Nuremberg Rothenburgerstrasse train station
Nuremberg Rothenburgerstrasse | |
---|---|
Rothenburger Strasse train station
|
|
Data | |
Operating point type | Breakpoint |
Platform tracks | 1 |
abbreviation | NNRS |
IBNR | 8004473 |
Price range | 5 |
opening | October 1, 1894 |
Website URL | Station profile of the BEG |
location | |
City / municipality | Nuremberg |
Place / district | Gostenhof |
country | Bavaria |
Country | Germany |
Coordinates | 49 ° 26 '45 " N , 11 ° 3' 15" E |
Railway lines | |
|
|
Railway stations in Bavaria |
The Nuremberg Rothenburgerstrasse stop (also Nuremberg Rothenburger Strasse ) is on the Nuremberg – Bamberg railway line and is located in the west of Nuremberg in the Gostenhof district . It is divided into station category 5 and has a 165 meter long and 76 centimeter high side platform. The stop is served by the S-Bahn line S1 (Bamberg - Nuremberg - Hartmannshof) and is connected to the underground lines U2 and U3 at the Rothenburger Straße underground station .
history
The opening of the stop by the Royal Bavarian State Railways took place on October 1, 1894, with the start of suburban traffic towards Erlangen. In the 1980s, the platform was extended across the intersection with Rothenburger Straße to the entrance of the underground station and raised to 76 centimeters above the top of the rails . With the construction of the S-Bahn to Forchheim, another redesign of the stop took place. First of all, in 2009 two provisional makeshift platforms were built on the new tracks between Nuremberg Central Station and the Nuremberg Central Station Jansenbrücke junction, which were put into operation in May and June, and the old platform was taken out of service. At the end of October 2010, demolition work on the old platform and construction work on the elevator began. On November 6, 2010, due to the planned commissioning of additional infrastructure (new S-Bahn track, new Nuremberg - Fürth track) up to and including December 11th, the stopping point was discontinued on November 22nd and the temporary platforms were removed in the following days. The reopening of the platform on the new S-Bahn track was planned for December 17, 2010, but was not due to delays in the expansion until May 1, 2011.
Connection overview
line | route | Clock frequency |
---|---|---|
Bamberg - Strullendorf - Hirschaid - Buttenheim - Eggolsheim - Forchheim - Kersbach - Baiersdorf - Bubenreuth - Erlangen - Erlangen Paul-Gossen-Strasse - Erlangen-Bruck - Eltersdorf - Vach - Fürth-Unterfarrnbach - Fürth main station - Nuremberg Rothenburger Strasse - Nuremberg-Steinbühl - Nuremberg main station - Nuremberg-Dürrenhof - Nuremberg-Ostring - Nuremberg-Mögeldorf - Nuremberg-Rehhof - Nuremberg-Laufamholz - Schwaig - Röthenbach (Pegnitz) - Steinberg - Seespitze - Lauf West - Lauf (left Pegnitz) - Ottensoos - Henfenfeld - Hersbruck ( left Pegnitz) - Happurg - Pommelsbrunn - Hartmannshof | 20 min |
See also
- List of stops on the Nuremberg S-Bahn
- List of train stations in Nuremberg
- Rothenburger Strasse underground station
Web links
- Entry in the station database of the Bavarian Railway Company
- Entry in the station database of Deutsche Bahn on bahnhof.de
swell
- ↑ Station price list 2020. In: Deutsche Bahn. Deutsche Bahn, January 1, 2020, accessed on July 10, 2020 .
- ↑ Query of the course book route 820 at Deutsche Bahn.
- ↑ Continuous text from the article List of train stations in Nuremberg (as of August 6, 2017 at 6:34 pm) moved to this article.
- ^ DB Mobility Logistics AG (Ed.): Construction work for the commissioning of the S-Bahn between Nuremberg and Fürth by December 17, 2010 . Traffic report from November 18, 2010.
- ↑ Rolf Syrigos: Stations not ready and trains missing. In: Nürnberger Zeitung. December 9, 2010, accessed December 14, 2010 .
- ↑ Continuous text from the article List of train stations in Nuremberg (as of August 6, 2017 at 6:34 pm) moved to this article.