Fiumetorto – Messina
The Fiumetorto-Messina railway line between the Torregrotta and Pace del Mela stations
Route number (RFI) :
153
Course book series (IT) :
99
Route length:
180.55 km
Gauge :
1435 mm ( standard gauge )
Power system :
3 kV =
Top speed:
180 km / h
Dual track :
Fiumetorto-Lascari
Patti-San Piero Patti-Messina C.le
Route from Palermo
43.2
Fiumetorto until 2009 PV
10 m slm
Route to Agrigento / Porto Empedocle
former route until 2011
46.9
Buonfornello until 2008 PV
Imera
A19
A20
52.7
Campofelice di Roccella
7 m slm
Roccella
former route until 2017
57.5
Lascari since 2016
Piletto
57.7
Lascari- Gratteri until 2016
58.3
Monte Poggio Maria tunnel (4,128 m)
66.8
Cefalù
23 m slm
70.6
Carbone Tunnel (2,055 m)
72.9
Sant'Ambrogio tunnel
74.9
Malterpugio tunnel (1,629 m)
75.4
Castelbuono
7 m slm
78.5
Santa Maria Tunnel (1,427 m)
Ponte Arancio tunnel
81.8
Pollina - S.Mauro-Castelverde
9 m slm
Pollina
83.9
Pollina tunnel (1,744 m)
88.1
Nacchio tunnel (1,247 m)
89.3
Tusa
9 m slm
Tusa
95.6
S.Stefano -Torremuzza- Reitano until 1986/1988
S. Stefano
98.0
S.Stefano di Camastra- Mistretta
8 m slm
Caronia
106.8
Caronia
19 m slm
113.8
Torre del Lauro
Furiano
120.3
Acquedolci - San Fratello
11 m slm
Inganno
125.3
Sant'Agata di Militello
7 m slm
Rosemary
129.2
San Marco d'Alunzio - Torrenova
6 m slm
132.7
Zappulla
5 m slm
Zappulla
138.6
Capo d'Orlando - Naso
10 m slm
S.Martino tunnel
Naso
146.5
Brolo - Ficarra
7 m slm
148.2
Piraino - Sant'Angelo until 1994/1997
152.6
Gioiosa Marea
10 m slm
156.7
Capo Calavà tunnel (1,700 m)
Pizzicalori tunnel
Tunnel duck
158.2
San Giorgio
9 m slm
161.3
Patti Marina until 1994/1997
A20
162.3
Patti- S.Piero Patti
12 m slm
Timeto / Tunnel Timeto
Ciavola tunnel (127 m) / Timeto
164.9
Madonna del Tindari tunnel (4,651 m)
A20
166.1
Mongiove Siculo 1950-1994 / 1997
Mongiove tunnel
170.2
Tindari tunnel (2,122 m)
171.0
Oliveri - Tindari
175.6
PC Tindari ( Üst )
Oliveri I tunnel (365 m)
Oliveri II tunnel (217 m)
Elicona
173.4
Falcone
4 m slm
Guttusa I tunnel (144 m)
Guttusa II tunnel (212 m)
Cavone tunnel (348 m)
A20
Zura I tunnel (291 m)
Zura II tunnel (177 m)
Dambona tunnel (799 m)
178.3
Novara - Montalbano - Furnari
23 m slm
Mazzarrà
S.Biagio I tunnel (431 m)
S.Biagio II tunnel (67 m)
S.Biagio III tunnel (155 m)
S.Biagio IV tunnel (283 m)
Franchini II tunnel / Franchini tunnel
Latina tunnel (208 m)
Mollerino tunnel / Mollerino I tunnel
181.4
Marchesana tunnel / MSB tunnel (235 m)
180.3
former route until 2009
181.8
Terme Vigliatore until 1991
182.5
Terme Vigliatore
Terms
Sant'Antonio tunnel (143 m)
184.2
Barcellona - Castroreale since 1991
186.6
Barcellona-Castroreale until 1991
Longano
A20
Mela
192.0
Santa Marina until 1985
192.2
Milazzo since 1991
195.2
Milazzo until 1991
Floripotema Corriolo
196.3 199.6
S.Filippo - S.Lucia until 2000
197.0
Pace del Mela
former route until 2009
Muto
former Messina-Barcellona tram line
Niceto
former Messina-Barcellona tram line
200.6
Torregrotta since 2009
205.1
Roccavaldina -Scala-Torregrotta until 2009
Scianina tunnel (810 m)
S.Antonino-Beviola-Mortellito tunnel (761 m)
206.9
Venetico until 2009
Grangiara tunnel (360 m)
Colazza tunnel (282 m)
203.8
Spadafora since 2009
208.1
Spadafora-San Martino until 2009
Malerba tunnel (444 m)
Parcheggio tunnel (330 m)
Bonsignore tunnel (276 m)
206.0
Rometta Messinese
13 m slm
Saponara
208.1
Villafranca Tirrena - Saponara
27 m slm
former route until 2001
A20
208.7
Peloritana Tunnel (new) (12,817 m)
Calamaro tunnel
216.1
Gesso until 1994/1997
89 m slm
217.1
Pietra Pizzuta tunnel
217.4
Peloritana tunnel (old)
223.6
Camaro until 2001
133 m slm
Spadalara tunnel
225.2
Montepiselli tunnel
Gonzaga tunnel
Petrazza tunnel
Angelo Tunnel
Stretch of Syracuse
Messina Scalo
223.8
Messina Centrale
6 m slm
Messina Marittima
Route to Villa San Giovanni
The Fiumetorto – Messina railway is a railway line on Sicily in Italy . It was built from 1887 to 1895 and is part of the Berlin – Palermo railway axis .
history
Opening date
Route section
April 20, 1887
Fiumetorto - Cefalù
June 20, 1889
Messina - San Filippo
August 20, 1890
San Filippo - Milazzo
September 27, 1890
Milazzo - Barcellona
June 15, 1891
Barcellona- Oliveri
May 25, 1892
Oliveri- Patti
November 20, 1893
Patti - Capo d'Orlando
March 25, 1894
Cefalù - Castelbuono
November 20, 1894
Castelbuono - Tusa
June 16, 1895
Tusa – Capo d'Orlando
The line was built from both endpoints; the gap was closed on September 19, 1895.
Between 1951 and 1955 the line was electrified and the section between Palermo and Fiumetorto was expanded to double-track.
The line has been expanded to two tracks since the 1980s, which for the most part can only be achieved with new lines. The longest engineering structure is the almost 13-kilometer-long Peloritana tunnel through the Peloritani Mountains near Messina, which went into operation on November 29, 2001.
Route description
The route essentially follows the Tyrrhenian Sea . From Patti- San Piero Patti, upgraded and new lines begin, most of which have been completed by Messina. In 1991 the new line Terme Vigliatore - San Filippo - Santa Lucia was opened. The new route resulted in the closure of the old route for the first time, as well as the closure of the Barcellona and Milazzo train stations in the city center . New stations were built on the new line, but far outside the city centers. A completely new line was also built between Pace de Mela and Rometta Messinese in 2009. Between Villafranca-Tirrena and Messina Scalo, the new, almost 13-kilometer-long Peloritano tunnel replaced the old line, which was already very difficult when the railway was built at the time. Before Messina Scalo, the line then meets the Messina – Syracuse railway line and ends at Messina Central Station .
Picture gallery
Regional train at Pollina
Intercity Palermo – Roma Termini at Oliveri
The main train station in Messina
Disused Gesso station on the old Villafranca Tirrena-Saponara-Messina route
Remarks
↑ The old line between Patti-San Piero Patti and Terme Vigliatore is single-track.
Web links
Individual evidence
↑ Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 December 1926 - Chronology of the route openings in Italy between 1839 and 1926
Railway lines ( standard gauge , 1,435 mm) in service:
Alcamo Diramazione – Trapani |
Caltanissetta Xirbi – Lercara Diramazione |
Canicattì – Syracuse |
Catania – Aragona Caldare |
Fiumetorto – Messina |
Lentini Diramazione – Caltagirone – Gela |
Messina – Syracuse |
Palermo – Agrigento / Porto Empedocle |
Palermo – Trapani
S-Bahn systems ( standard gauge , 1,435 mm), in operation:
Palermo
Railway lines ( Italian meter gauge, 950 mm), in operation:
Ferrovia Circumetnea
Railway lines ( standard gauge , 1,435 mm), discontinued:
Alcantara – Randazzo |
Motta Sant'Anastasia – Regalbuto |
Noto-Pachino
Railway lines ( Italian meter gauge, 950 mm), discontinued:
Agrigento – Licata |
Canicattì – Margonia |
Castelvetrano – San Carlo – Burgio |
Castelvetrano – Porto Empedocle |
Dittaino – Caltagirone |
Dittaino – Leonforte |
Filaga – Palazzo Adriano |
Giarratana – Vizzini |
Lecara – Magazzolo |
Palermo – San Carlo |
Santa Ninfa – Salemi |
Syracuse – Ragusa |
Messina – Barcellona regional tram |
Overland tram Catania – Acireale
Railway lines ( Italian meter gauge, 950 mm), unfinished:
Palermo – Salaparuta |
Salemi – Kaggera
<img src="https://de.wikipedia.org//de.wikipedia.org/wiki/Special:CentralAutoLogin/start?type=1x1" alt="" title="" width="1" height="1" style="border: none; position: absolute;">