Großreuth underground station near Schweinau

from Wikipedia, the free encyclopedia

The Großreuth U-Bahn station near Schweinau (short name of the operator: GR ) is a station of the Nuremberg U-Bahn , which is expected to start operating at the end of 2020 after a trial run. It is 898 m from the Gustav-Adolf-Straße underground station and is to temporarily represent the south-western terminus of the U3 line.

location

The station is located in the Nuremberg district of the same name, Großreuth near Schweinau, and extends underground in an east-west orientation parallel to Rothenburger Strasse, around 225 m away, between the intersection of Züricher Strasse / Gerhart-Hauptmann-Strasse and Hartungstrasse.

The structure lies at a simple depth (approximately 8.60 m) below the surface of the earth. At each end of the platform there are fixed and escalators as well as an elevator on the west side, which represent a direct connection to the surface.

Behind the underground station, under Appenzeller Strasse, there is an approximately 235 m long, double-track tunnel, which is to be used temporarily as a parking or turning system.

See also

Web links

Individual evidence

  1. U3 extension: operations should start at the end of the year . On nordbayern.de, January 21, 2020, accessed on January 29, 2020
  2. residents About the shell start underground U3 Southwest construction section 2.1 [PDF] on nuernberg.de, p 2, August 2014. Retrieved on January 29, 2020
  3. Großreuth underground station near Schweinau [PDF] on nuernberg.de, accessed on January 29, 2020

Coordinates: 49 ° 26 ′ 21.5 ″  N , 11 ° 1 ′ 27.6 ″  E