Düsseldorf-Eller Süd stop
Düsseldorf-Eller South | |
---|---|
![]() Main platform 2006
|
|
Data | |
Operating point type | Breakpoint |
Platform tracks | 2 |
abbreviation | KDES |
IBNR | 8001588 |
Price range | 5 |
opening | 1967 |
Profile on Bahnhof.de | Duesseldorf-Eller_Sued |
location | |
City / municipality | Dusseldorf |
Place / district | Eller |
country | North Rhine-Westphalia |
Country | Germany |
Coordinates | 51 ° 11 '53 " N , 6 ° 50' 11" E |
Railway lines | |
|
|
Railway stations in North Rhine-Westphalia |
The breakpoint Dusseldorf-Eller South is located about five kilometers south of Düsseldorf main station in Düsseldorf district of Eller . It is located on the Cologne – Duisburg railway line and belongs to station category 5. The Düsseldorf-Eller Süd stop is next to the stop for the Rhein-Ruhr S-Bahn and several bus lines.
location
The breakpoint is centrally located between the districts of Düsseldorf-Wersten , Düsseldorf-Eller and Düsseldorf-Oberbilk . It has a central platform and is in an elevated position above Karlsruher Strasse. The access is at the underpass between Sturmstrasse and Konradstrasse.
history
In 1967 the S-Bahn line between Düsseldorf Hauptbahnhof and Düsseldorf-Garath was put into operation. In this context, the Düsseldorf Eller-Süd stop was reopened. As part of Deutsche Bahn's modernization offensive 2 for stations in North Rhine-Westphalia (MOF 2), the Eller-Süd stop was renovated and rebuilt in May and June 2012 for 2.17 million euros.
Lines
The stop is currently served by two S-Bahn lines and five bus lines during the day and one night line.
line | Line course | Tact |
---|---|---|
S 6 |
Essen Hbf - ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Nippes – Worringen only during peak hours Status: timetable change December 2019 |
20 min |
P 68 |
W-Vohwinkel ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Only runs during peak hours and sometimes only in load direction Status: timetable change December 2019 |
|
724 |
Gerresheim , Waldfriedhof 1 - Schönaustraße ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
20 min |
731 |
Bilk , Südpark ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
20 min |
732 |
Hafen , Lausward 1 - Bremer Straße 2 - D-Hamm ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
10 min |
735 |
Bilk , Südpark 1 - Universität Mensa - Universität Mitte - Universität Süd - Universität Südost - Wersten , Otto-Hahn-Strasse 2 - Ohmweg - Dechenweg - Ickerswarder Strasse - Eller, Friedhof - D-Eller Süd - Alt Eller - Vennhauser Allee 3 - Eller - Vennhausen , Freedom Estate - Unterbach , Strandbad Nord - Unterbach, Am Zault - Erkrath-Unterfeldhaus , Neuenhausplatz 4 Section 2–4 Mon – Fri 6 a.m. – 8 p.m. every 20 minutes; Section 3–4 Mon – Fri 8–9 p.m., Sat 6–9 p.m. every 30 min, Mon – Sat 9–11 p.m., Sun 7 a.m. – 11 p.m. every 60 min; further stops only in sections 2–4![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
20 min |
NE 6 |
Düsseldorf Hbf → Worringer Platz → Handelszentrum / Moskauer Strasse → Ellerstrasse → Oberbilk → Wersten Ost → Eller Süd → Eller, Vennhauser Allee → Eller → Vennhausen → without stopping on A 46 → Uni-Kliniken → Berliner Allee → Düsseldorf Hbf![]() ![]() ![]() ![]() ![]() ![]() |
60 min |
As well as the NE6 to and from Düsseldorf Central Station, which only stops in the direction of Vennhauser Allee.
See also
Web links
Individual evidence
- ↑ S-Bahn stations: Conversion is progressing RP online from August 1, 2012
←
|
Lines |
→
|
||
---|---|---|---|---|
Oberbilk |
![]() K – DU |
Rice wood |