Bamberg – Hof railway line

from Wikipedia, the free encyclopedia
Bamberg – Hof Hbf
Hof Hauptbahnhof, 1986
Hof Hauptbahnhof, 1986
Section of the Bamberg – Hof railway line
Route number : 5100
Course book section (DB) : 512, 820, 850
Route length: 127.230 km
Gauge : 1435 mm ( standard gauge )
Route class : D4
Power system : Bamberg – Hochstadt am Main:
15 kV, 16.7 Hz  ~
Maximum slope : 23.0 
Top speed: 160 km / h
Dual track : Bamberg – Marktschorgast
Stammbach – Hof Hbf
Route - straight ahead
from Nuremberg
Station, station
0.000 Bamberg 240 m
   
to Scheßlitz
   
to Würzburg and to Bamberg harbor
   
2.600 Connecting curve from Würzburg
Road bridge
2.700 Federal motorway 70
Station, station
3.445 Hallstadt (b Bamberg)
Road bridge
6.600 Federal motorway 73
   
Initially Breitengüßbach Muna
Station, station
7.639 Breitengüßbach 248 m
   
to Ebern (–Maroldsweisach) and to Dietersdorf
Road bridge
10.700 Federal motorway 73
Stop, stop
12.056 Ebing
Stop, stop
14.249 Zapfendorf
Station without passenger traffic
18.000 Unterleiterbach Exercise
   
to Leipzig Hbf (high-speed route)
Stop, stop
20.199 Ebensfeld 254 m
Station, station
25.657 Bad Staffelstein
Road bridge
28.500 Federal motorway 73
Station, station
31,897 Lichtenfels 263 m
   
to Coburg (–Eisenach)
Stop, stop
36.098 Michelau (Oberfr)
Station, station
40.164 Hochstadt - Marktzeuln 274 m
Road bridge
Federal highways 173 and 289
   
according to Probstzella
   
Main
   
to Probstzella (original branch)
Stop, stop
45.691 Burgkunstadt
Stop, stop
51.685 Mainroth
Station, station
56.620 Mainleus 302 m
   
White main
   
from (Bayreuth–) Melkendorf
Road bridge
Bundesstrasse 85
   
White main
Station, station
61.977 Kulmbach 304 m
Station, station
68.370 Untersteinach (b Stadtsteinach)
   
to Stadtsteinach
Stop, stop
70.726 Ludwigschorgast
Station, station
74,362 Neuenmarkt-Wirsberg 348 m
   
to Bayreuth
   
Connecting curve from Neuenmarkt-Wirsberg Süd
Blockstelle, Awanst, Anst etc.
75.598 Neuenmarkt-Wirsberg East
Road bridge
Bundesstrasse 303
Route - straight ahead
Inclined plane
Station, station
81.823 Marktschorgast 506 m
   
86.400 If
   
to Gefrees
Station, station
93.050 Stammbach 581 m
Bridge (medium)
Bundesstrasse 289
Road bridge
Federal motorway 9
   
von (Selbitz-) Helmbrechts
Station, station
102.971 Münchberg 536 m
Bridge (medium)
Bundesstrasse 2
   
to Zell
Stop, stop
109.560 Seulbitz
   
Saxon Saale
Stop, stop
113.750 Förbau 509 m
Station, station
116.214 Schwarzenbach (Saale)
Road bridge
Bundesstrasse 289
   
Lamitz
   
from Weiden (Oberpf)
   
by Cheb
Station, station
121.615 Oberkotzau ( wedge station ) 485 m
Road bridge
Bundesstrasse 15
   
124.821 Saale viaduct (164 m)
   
125.100 Court mosque village
Station, station
127.230 Hof Hbf 495 m
   
to Bad Steben
Route - straight ahead
to Leipzig Bayer Bf

Swell:

The Bamberg – Hof railway line is largely a two-track main line in Bavaria . It runs from Bamberg via Lichtenfels , Kulmbach , Neuenmarkt-Wirsberg and Münchberg to Hof .

As part of the German Unity Transport Project No. 8 , the new and upgraded Nuremberg – Ebensfeld – Erfurt line is being built parallel to the line . In the future, there will be four parallel tracks between Bamberg and Ebensfeld.

history

The line was built as part of the Ludwig-Süd-Nord-Bahn from Lindau (Lake Constance) to Hof . It was built by the Royal Bavarian State Railroad in three stages between 1846 and 1848. The originally single-track line was extended by a second track in 1891, and the electrification from Bamberg to Lichtenfels and on via the Frankenwaldbahn to Saalfeld was completed on May 10, 1939. In the 1960s, the second track between Marktschorgast and Stammbach was dismantled due to insufficient traffic.

Opening dates

  • February 15, 1846: Bamberg - Lichtenfels
  • October 15, 1846: Lichtenfels - Neuenmarkt-Wirsberg
  • November 1, 1848: Neuenmarkt-Wirsberg - Hof

Incidents

On the afternoon of May 12, 1907, the Berlin – Munich express train (D 40) derailed at about 80 km / h in the area of ​​the Ebensfeld station due to a track warping due to extreme heat. All cars derailed, but no one was seriously injured.

ABS Nuremberg – Ebensfeld

Parallel to the existing line, two tracks of the upgraded line are being built between Bamberg and Ebensfeld . The upgraded line is designed for speeds of up to 230 km / h. The junction of the two routes is the new Unterleiterbach overtaking station south of Ebensfeld.

In the course of the expansion between Breitengüßbach and Zapfendorf, the route between Lichtenfels and Bamberg was completely closed from January 11 to September 4, 2016. The stations Breitengüßbach, Ebing, Zapfendorf and Ebensfeld were made barrier-free (platform height: 55 cm). The barrier-free equipment was initially not planned due to the traffic volume of less than 1000 boarding / disembarking per day. During the ongoing planning approval, the federal government decided to finance the barrier-free expansion. The retrofitting of elevators was considered separately according to planning law, the elevators went into operation in 2017.

Route description

course

Foot of the inclined plane , from the right the Schlömener curve
Rail bus VT 98 of the DDM on the inclined plane
Lichtenfels station building
Separation of the routes to Weiden (left) and Bamberg in Oberkotzau
Express train passing through Oberkotzau station , 1986

After the start of the line in Bamberg train station, the disused branch line to Scheßlitz and the main line to Rottendorf branch off , which runs parallel up to the level of the allotment garden and then turns to the northwest. From the left, a connecting track from the Würzburg route meets the route, which then crosses under the federal motorway 70 , passes the western edge of Hallstadt and runs parallel to the federal road 4 , reaching Breitengüßbach . After the station, the branch line to Ebern and the disused and dismantled branch line to Dietersdorf . The route passes under the federal highway 73 and runs parallel to the Main . Via the stations Ebing , Zapfendorf , Ebensfeld , where the high-speed line branches off to Erfurt , and Bad Staffelstein , the line reaches Lichtenfels, where the Werrabahn branches off to Coburg .

From the Lichtenfels train station , the route up to and including Mainleus runs parallel to the Main again . In Hochstadt - Marktzeuln the Frankenwaldbahn branches off to Ludwigsstadt and Saalfeld, in Kulmbach the local railway from Thurnau and Bayreuth joined the line until 1993 . Via Untersteinach and Ludwigschorgast, the line reaches Neuenmarkt-Wirsberg station , which in the past had its own depot. Today it houses the German Steam Locomotive Museum . After the train station, the line branches off to Bayreuth , from which the connecting track known as the Schlömener curve meets the line to Hof just a few meters away . The route then leads over the inclined plane up to the Marktschorgast train station , from the end of which it is single-tracked to Stammbach . Via Münchberg and Schwarzenbach an der Saale , the line reaches Oberkotzau , where it joins the lines from Weiden and Selb , crosses the Saale at Moschendorf and reaches the terminus at Hof .

State of development

The line from Bamberg to Hochstadt-Marktzeuln has two tracks and is electrified. The subsequent line to Hof is not electrified, but is also double-tracked, except for the single-track section Marktschorgast – Stammbach. The route-related maximum speed is in sections 160 km / h.

Trains

Until the timetable change in December 2017 and the order following relocation of the long distance to the Nuremberg-Erfurt high-speed railway drove on the track of Bamberg about Lichtenfels to High City Marktzeuln InterCity Express trains on the line Munich -Nürnberg- Leipzig - Berlin (- Hamburg ) in Hourly. Used came ICE-T tilting trains 411 series.

Since then, there is only one ICE connection during the week from Lichtenfels via Bamberg to Munich. In addition, a pair of IC trains runs from Leipzig to Karlsruhe with stops in Bamberg and Lichtenfels, and a two-hour IC connection is to be set up from 2023.

On the Bamberg – Lichtenfels section, a regional express (RE) runs every two hours on the Nuremberg – Bamberg – Lichtenfels– Sonneberg (Thuringia) line , and there is also an RE every two hours from Nuremberg to Leipzig main station via Kronach , Saalfeld / Saale and Jena . A RE Bamberg – Lichtenfels – Hof / Bayreuth also runs every two hours . The offer is supplemented by the regional train line (Nuremberg) –Bamberg – Lichtenfels – Kronach – Saalfeld, which runs every hour to Kronach and every two hours north of Kronach. Individual trains are tied through to Nuremberg.

The Regional Express trains to Sonneberg / Leipzig consist of class 442 multiple units approved for 160 km / h . Due to the tight curve radii on the inclined plane and the non-electrified sections Hochstadt-Marktzeuln-Hof / Bayreuth, the Bamberg – Hof / Bayreuth line is used by the diesel-powered tilting technology trains of the 612 series, which are separated or combined in the Neuenmarkt - Wirsberg system stop . Since December 2013, the 612 series has only been in use every two hours between Lichtenfels and Bayreuth / Hof. In the other hour, vehicles of the 641 series run between Bamberg and Bayreuth / Hof . The Würzburg – Bayreuth / Hof connection in Bamberg, which was free of transfers until December 2013, was thus broken, as class 425 electric multiple units between Bamberg and Würzburg took over the previous services of the 612 series.

The Agilis railway company has been serving the following routes on the Bamberg – Hof railway line since 2011 as the winner of the Bavarian Railway Company’s tender :

  • from Ebern via Breitengüßbach to Bamberg (hourly)
  • from Bad Rodach via Lichtenfels and Neuenmarkt-Wirsberg to Weiden (every hour)
  • from Helmbrechts via Münchberg and Hof Hbf to Bad Steben (every two hours)
  • individual trains Bamberg - Lichtenfels
  • individual trains Kulmbach - Münchberg

since December 2012 also Hof - Marktredwitz.

The Regional Express trains travel between Marktschorgast and Hof from Nuremberg via Bayreuth to Hof.

E-Netz Franken

With the timetable change in December 2011, there should be a change in the regional express trains on this route. It was planned new railcars of series 442 on the way to Sonnenberg use. This RE should consist of two detachable train parts. The train division was planned alternately in Bamberg (for the RE to Würzburg Hbf ) or in Lichtenfels (for the RE to Jena Saalbahnhof ). Since the series 442 (Talent 2) had delivery and approval problems, this concept could only come into effect one year later at the timetable change in December 2012.

Dichotomy

The RE line Würzburg – Bamberg – Lichtenfels – Bayreuth / Hof, which ran through December 2013, was split in two in December 2013. This avoids uneconomical driving with diesel trains under contact wire. DB Regio Franken won the tender in the Main-Spessart area at the beginning of 2013. Since December 2013, the Frankfurt (Main) –Würzburg – Bamberg line has been served by DB Regio Bayern Verkehrsbetrieb Franken. The Bamberg – Lichtenfels – Bayreuth / Hof line was transferred to DB Regio Bayern Verkehrsbetrieb Nordostbayern. The 425 series has been running on the RE Würzburg – Bamberg line since December 2013 . The Bamberg – Bayreuth / Hof line has been served by class 641 diesel multiple units since December 2013 .

future

Complete electrification

In March 2013, plans by the Bavarian Ministry of Economic Affairs became known to fully electrify the route between Hof and Hochstadt. The electrification is to be included in the Federal Transport Infrastructure Plan. However, the financing is still unclear.

See also

Web links

Commons : Bamberg – Hof railway line  - collection of images, videos and audio files
  • Route, operating points and permissible speeds on the OpenRailwayMap
  • Route description on nahverkehr-franken.de (private)

Individual evidence

  1. ^ The rail vehicles of the Bundeswehr. In: bundeswehrloks.de. Archived from the original on January 8, 2014 ; accessed on January 1, 2017 .
  2. DB Netze - Infrastructure Register
  3. ^ Günther Klebes: As a result of great heat . In: Eisenbahngeschichte 95 (2019), p. 85.
  4. Ebensfeld has to adjust to more rail noise . In: Neue Presse , Lichtenfels edition . July 30, 2014, p. 7 ( online ).
  5. Use the VDE 8 blocking pause . In: DB Welt , Southeast regional section . No. 1 , 2016, p. 17 .
  6. a b RB Süd: Barrier-free expansion of four stations in the Bamberg area . In: StationsAnzeiger . No. December 18 , 2016, p. 12 ( PDF file , 3.3 MB). PDF file ( Memento from January 1, 2017 in the Internet Archive )
  7. ↑ A huge success for the region: “Lichtenfels-ICE” for commuters is retained and IC connection via Kronach is secured. December 17, 2017, accessed February 10, 2018 .
  8. ↑ The express train finally stops again in the district town. In: New Press Coburg. np-coburg.de, December 11, 2017, accessed on February 10, 2018 .
  9. New railcar series in Franconia. May 23, 2013, archived from the original on March 7, 2014 ; accessed on January 1, 2017 .
  10. BEG awards express transport in Upper Franconia to DB Regio. Bavarian Railway Company, May 13, 2013, accessed on March 28, 2019 .
  11. ↑ Will the electrification gap be closed soon? Bayerischer Rundfunk , March 24, 2014, archived from the original on January 6, 2015 ; accessed on January 6, 2015 .
  12. New plans: electrification of the railways in Bayreuth and Kulmbach. Radio Plassenburg, March 9, 2013, archived from the original on April 12, 2013 ; accessed on March 16, 2013 .