Diaľnica D3

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking street / Maintenance / SK-D
Diaľnica D3 in Slovakia
Diaľnica D3
 E75-SVK.svg E442-SVK.svg
map
Course of the D 3
Basic data
Operator: Národná diaľničná spoločnosť, as
Overall length: 59.8 km
  of which in operation: 32.2 km
  of which under construction: 5.7 km
  of which in planning: 22 km

Kraj :

Highway D1 Slovakia 5.JPG
The D3 near Dolný Hričov, km 4 (dir. Skalité)
Course of the road
node (0)  Dolný Hričov (Free Passage)Template: RSIGN / Maintenance / Parameter 6D1 E75
Junction (2)  Letisko Žilina (no driveway towards Poland)
bridge Dolný Hričov
bridge Horný Hričov 168 + 270 + 370 m / 1536 m
Junction (8th)  Žilina -západ ( HAS Dolný Hričov)I61
flow Strážov ( Waag , Hričov reservoir ) 1500 m
tunnel Považský Chlmec 2218 m
flow Brodno 500 m ( Kysuca )
Junction (13)  Žilina-sever ( HAS Skalité)I11
Autobahn end Transition on I11
Junction (18)  Kysucké Nové Mesto I11
tunnel Kysuca 584 m
Gas station Krásno nad Kysucou (dir. Dolný Hričov)
Junction (33)  Krásno nad Kysucou II520
Gas station Oščadnica (direction Skalité)
Start of the road Transition on I11
Junction (35)  Oščadnica I11 Symbol: oncoming traffic
tunnel Horelica 605 mSymbol: oncoming traffic
bridge Kysuca 448 m Symbol: oncoming traffic
Junction (39)  Čadca -centrumI11 Symbol: oncoming traffic
End of the road Transition on I11
bridge Podzávoz (12/2020)
Junction (42)  Čadca-sever ( HAS Skalité) (12/2020)I11
Start of the road Transition on I11
Junction (45)  Svrčinovec I11 , plannedR5 E75
bridge Svrčinovec 368 m
tunnel Svrčinovec 420 mSymbol: oncoming traffic
bridge Markov 405 m Symbol: oncoming traffic
bridge Vŕšok 440 m Symbol: oncoming traffic
parking spot Čierne (direction Skalité) Symbol: oncoming traffic
bridge Čierne 300 m Symbol: oncoming traffic
bridge Valy 630 m Symbol: oncoming traffic
bridge Čadečka 710 m Symbol: oncoming traffic
bridge Rieka 514 m Symbol: oncoming traffic
tunnel Poľana 898 mSymbol: oncoming traffic
Junction (58)  Skalité (only exit dir. Skalité)I12 Symbol: oncoming traffic
bridge Skalité 494 mSymbol: oncoming traffic
Junction (58)  Skalité (only exit direction Dolný Hričov)I12 Symbol: oncoming traffic
EU border crossing (59)  Skalité-Zwardoń
Template: AB / Maintenance / WeiterPLPoland Continue on  Bielsko-BiałaS1
  • Under construction
  • In planning
  • The Diaľnica D3 , sometimes also referred to as the " Kysuce Motorway" (Slovak Kysucká diaľnica ), until 1999 D18 , is a motorway in northern Slovakia . When completed, the 60 km long motorway will connect the D1 motorway near Dolný Hričov and the town of Žilina with the Skalité - Zwardoń motorway border crossing on the Polish border. The motorway is part of the European route E 75 , to a lesser extent also the E 442 and part of the VI. Pan-European Transport Corridor ( Gdansk - Łódź - Žilina - Bratislava - Budapest - Belgrade - Athens ).

    Three sections of the route have currently been approved: Dolný Hričov –Žilina, Brodno (12.7 km, full expansion), Oščadnica - Čadca , Bukov (4 km, semi-expansion ) and Svrčinovec – Polish border at Skalité (15.5 km, semi-expansion ). Another 5.7 km are under construction.

    history

    An investment ruin for many years : structurally completed, but not released section at Skalité due to lack of connection (photo from June 2012)
    Almost finished Valy Viaduct in March 2017, three months before the opening

    Construction began in April 1996 with the 4 km long section Ošcadnica – Čadca, Bukov, which was planned as the relocation of 1st order road 11 (administrative I / 11A), although it was built on the Žilina carriageway of the future motorway. The second section, the 3.2 km long section Skalité – Polish border, went into construction in November 1997, when the entire motorway was still known as the D18. In 1999 the route of the motorway was redesigned as the D3, among other things the previously planned connection to the D1 south of Žilina was abandoned in favor of the current route. Due to a lack of financial resources, construction slowed, so that the first section at Čadca was only opened to traffic on October 29, 2004 together with the Horelica tunnel . The section Skalité-Polish border with the planned completion in November 2000, however, could not be released for years because there was no connection to the existing road network at the Slovak end of the section and was therefore useless. As a result, by 2017, Skalité had four bridges that were only “there” .

    With the construction of the Kia Motors Slovakia automobile plant near Žilina between 2004 and 2005, the connection to Bratislava enjoyed the highest priority and therefore, in October 2005, construction of the 8.5 km long Dolný Hričov – Žilina, Strážov line began, which by Slovakian standards was fast passed. Part of it was partially completed in January 2007 and in June 2008 the entire route was officially opened to traffic in four lanes. The heart of this section is the slope bridge over the existing road and Hričov reservoir with a length of 1,536 m. The construction costs were almost exactly 175 million euros, which at that time corresponded to about 6 billion Slovak crowns .

    Považský Chlmec tunnel on the open day, October 2017

    After that, the further construction of the motorway came to a standstill until October 2013, when construction of the 12.2 km long Svrčinovec – Skalité section began, with the two-lane expansion of the above-mentioned Skalité – Polish border section on June 10, 2017 has been. Part of this route are two tunnels - Svrčinovec (420 m) and Poľana (898 m) - as well as several large bridges. One of them, the 630 m long Valy viaduct near the three-country point Slovakia-Czech Republic-Poland, reaches a maximum height of 84 m above the valley floor, making it the highest bridge in Slovakia. The total cost of both sections was around. The last section so far was the section Žilina, Strážov – Žilina, Brodno (4.25 km) opened to traffic on December 2, 2017 after a construction period of three and a half years. This section essentially consists of a large bridge over the Hričov reservoir (length approx. 1.5 km), the Považský Chlmec tunnel (2,218 m) and the Brodno bridge over the Kysuca (length 500 m). The construction costs amounted to 255 million euros.

    Construction projects and planning

    The operator NDS as plans to complete the construction of the motorway in 2023 (as of June 2016).

    In December 2016, construction of the 5.67 km long section Čadca, Bukov - Svrčinovec officially began in full expansion. The completion date is December 2020.

    Sections

    section length start of building Installation
    Dolný Hričov - Žilina , Strážov 8.479 km October 2005 January 12, 2007 (5.7 km in half-
    scale ) December 12, 2007 (5.7 km in full scale, 1 km in half-
    scale) June 6, 2008 (full full scale)
    Žilina , Strážov - Žilina, Brodno 4,250 km July 2014 2nd December 2017
    Žilina, Brodno - Kysucké Nové Mesto 11,200 km 2022 2025
    Kysucké Nové Mesto - Oščadnica 10.790 km 2021 2024
    Oščadnica - Čadca, Bukov 4,000 km April 1996 October 29, 2004 (semi-finished)
    Čadca, Bukov - Svrčinovec 5.670 km December 2016 December 2020
    Svrčinovec - Skalité 12,280 km October 2013 June 10, 2017 (semi-finished)
    Skalité - limit SK / PL 3,180 km November 1997 January 2006 (200 m at the border)
    June 10, 2017 (whole route under construction)

    Legend:

    Section in operation
    Section under construction
    Section in planning

    Individual evidence

    1. D3 Skalité - štátna hranica SR / PR , dialnice.szm.com (Slovak), accessed on December 6, 2014
    2. Cena Zväzu stavebných podnikateľov Slovenska za vysokú kvalitu stavebnej realizácie ( Memento of the original from December 9, 2014 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. , stavbaroka.eu, accessed December 6, 2014 @1@ 2Template: Webachiv / IABot / www.stavbaroka.eu
    3. Sprejazdnili sme prvý úsek kysuckej D3 , NDS as (Slovak) from June 10, 2017, accessed on June 28, 2017
    4. Dva úseky R2 pribudnú až na jeseň, úsek D3 v budúcom roku , Pravda (Slovak) from March 22, 2016, accessed on April 26, 2016
    5. Otvorili nový úsek diaľnice D3 pri Žiline, jeho súčasťou je aj estakáda ponad VD Hričov , tvnoviny.sk of December 2, 2017, accessed on December 2, 2017
    6. Diaľnicu D3 dokončia najskôr v roku 2023. , Pravda (Slovak) from June 5, 2016, accessed on December 31, 2016

    Web links

    Commons : Diaľnica D3  - collection of images, videos and audio files