The [[Milford and Woonsocket Railroad]] was incorporated in [[1855]] and opened in [[1868]], continuing the Milford Branch to [[Bellingham (MA)|Bellingham]]. The Boston and Worcester Railroad leased the M&W from [[August 1]], [[1868]] to [[May 1]], [[1883]], after which connections on both sides were combined with it, and it eventually became part of the [[New York and New England Railroad]] and the [[New York, New Haven and Hartford Railroad]].
The [[Milford and Woonsocket Railroad]] was incorporated in [[1855]] and opened in [[1868]], continuing the Milford Branch to [[Bellingham (MA)|Bellingham]]. The Boston and Worcester Railroad leased the M&W from [[August 1]], [[1868]] to [[May 1]], [[1883]], after which connections on both sides were combined with it, and it eventually became part of the [[New York and New England Railroad]] and the [[New York, New Haven and Hartford Railroad]].

The [[Hopkinton Railway]], organized in [[1870]] and opened in [[1872]], continued the M&W north via [[Hopkinton (MA)|Hopkinton]] to the B&W at [[Ashland (MA)|Ashland]]. The B&W leased it until [[1885]], when it was coordinated with the M&W.


;Millbury
;Millbury

Revision as of 19:40, 12 June 2005

This article is about the former Boston and Albany Railroad in Massachusetts and New York. There was also a Boston and Albany Railroad of Georgia.
Boston and Albany Railroad
File:B&A old logo.png
Overview
Reporting markBA
LocaleMassachusetts and eastern New York
Dates of operation1833

The Boston and Albany Railroad (reporting mark BA) was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system. Passenger service is still operated on the line by Amtrak (as part of their Lake Shore Limited), and the MBTA Commuter Rail system uses the section east of Worcester as their Framingham/Worcester Line.

History

The Boston and Worcester Railroad was chartered June 23, 1831, and construction began August 1832. The line opened in sections - to Newton April 16, 1833, Wellesley July 3, 1833, Ashland September 20, 1833, Westborough November 1834, and the full length to Worcester July 6, 1835.

The Western Railroad was chartered February 15, 1833 and incorporated March 15, 1833 to connect the B&W to the Hudson and Berkshire Railroad at the New York state line. Construction began in 1837, and the Eastern Division to the Connecticut River in Springfield opened on October 1 1839. The Western Division, through the Berkshire Hills, opened in sections from both ends - from the state line to Pittsfield May 4, 1841, West Springfield to Chester May 24, 1841, Springfield to West Springfield (across the Connecticut River) July 4, 1841, Pittsfield to "Summit" August 9, 1841, and Chester to Summit September 13, 1841. On October 4, 1841 the first train ran along the full route.

The Castleton and West Stockbridge Railroad was incorporated in New York in 1834 as the New York part of the Western Railroad, and changed its name to the Albany and West Stockbridge Railroad (chartered May 5, 1836, organized May 20). Construction began in December 1840 and the line opened from Greenbush (east of Albany) to Chatham on December 21, 1841 and to the Massachusetts state line on September 12, 1842. It was leased to the Western Railroad for 50 years from November 11, 1841. This railroad replaced the Hudson and Berkshire Railroad east of Chatham, which was abandoned around 1860.

Two mergers, on September 4, 1867 and December 28, 1870, brought the three companies together, along with the Hudson and Boston Railroad (a branch to Hudson, New York - see below) into one company, known as the Boston and Albany Railroad. The New York Central and Hudson River Railroad leased the B&A for 99 years from July 1, 1900. This lease passed to the New York Central Railroad in 1914; throughout this, the B&A kept its own branding in the public eye. The NYC merged into Penn Central on February 1, 1968.

In 1899 the new South Station union station opened in Boston, a few blocks northeast of the old terminal. That terminal had been located on the west side of Utica Street, from Kneeland Street south to a bit past Harvard Street, now part of the South Bay Interchange. Even earlier, the terminal was in the block bounded by Kneeland Street, Beach Street, Albany Street (now Surface Artery) and Lincoln Street; this later became a freight house.

By 1964 commuter rail service was provided east of Worcester, with intercity rail continuing on west. The intercity trips were taken over by Amtrak on May 1, 1971, and on January 27, 1973 the MBTA acquired the line east of Framingham. Service beyond Framingham was discontinued October 27, 1975, as the state did not subsidize it. Conrail took over Penn Central on April 1, 1976. On September 26, 1994, some rush hour trains started to serve Worcester on Conrail trackage (which became CSX trackage on June 1, 1999), extending to other times beginning on December 14, 1996.

Branches

Grand Junction

The Grand Junction Railroad was chartered in 1847 as a reincorpration of the 1846 Chelsea Branch Railroad, meant to connect the lines north and west of Boston. The first section, from East Boston to Somerville, opened in 1849, and the extension to the B&W in Allston opened in 1856. The Eastern Railroad leased the line from 1852 to 1866, using part of it as their new main line. In 1866 the B&W bought the line (keeping trackage rights for the Eastern).

Brookline/Highland

The Brookline Branch split from the main line in the west part of Boston's Back Bay, running southwest for 1.55 mi (2.5 km) to Brookline (the current location of Brookline Village station). It opened in 1847. In Summer 1852 the Charles River Branch Railroad extended the line to Newton Upper Falls; this would eventually become part of the New England Railroad, an alternate route to New York.

In 1882 the B&A bought part of the Charles River Branch, and in 1884 they built a line from Riverside to the branch, forming the Highland Branch, Newton Highlands Branch or "Newton Circuit". Service ended in 1958, and the MBTA Green Line "D" Branch light rail line started using the tracks in 1959.

Newton Lower Falls

The short 1.25 mile (2.0 km) Newton Lower Falls Branch opened in 1847, splitting from the main line just west of Riverside to Newton Lower Falls. At some point it was realigned to split at Riverside.

Saxonville

The Saxonville Branch opened in 1846, running 3.87 miles (6.2 km) from Natick to Saxonville.

Framingham

The Framingham Branch opened in 1849, running 2.06 miles (3.3 km) from Framingham to Framingham Centre. The Agricultural Branch Railroad was incorporated in 1847 and opened in 1855, continuing the branch to Northborough, and to Pratts Junction in 1866. It was leased by the B&W in 1853, but consolidated into the Boston, Clinton, Fitchburg and New Bedford Railroad in 1876 and leased to the Old Colony Railroad in 1879 after changing its name to the Boston, Clinton and Fitchburg Railroad in 1867. This company also used the Framingham Branch as part of its main line.

Milford

In 1847, the 11.97 mile (19.3 km) Milford Branch, splitting at Framingham, opened. A connection was later made at Milford to the Milford and Woonsocket Railroad and Hopkinton Railway.

The Milford and Woonsocket Railroad was incorporated in 1855 and opened in 1868, continuing the Milford Branch to Bellingham. The Boston and Worcester Railroad leased the M&W from August 1, 1868 to May 1, 1883, after which connections on both sides were combined with it, and it eventually became part of the New York and New England Railroad and the New York, New Haven and Hartford Railroad.

The Hopkinton Railway, organized in 1870 and opened in 1872, continued the M&W north via Hopkinton to the B&W at Ashland. The B&W leased it until 1885, when it was coordinated with the M&W.

Millbury

The 3.07 mile (4.9 km) Millbury Branch opened in 1846 from a split at Millbury Junction on the Grafton/Millbury line to Millbury.

Webster

The Providence, Webster and Springfield Railroad was chartered in 1882, opened in 1884, and always leased to and operated by the B&A. The line formed a branch of the B&A from Webster Junction in Auburn to the Worcester and Norwich Railroad in Webster, with a short branch (East Village Branch) in Webster to East Village.

Spencer

The Spencer Railroad railroad opened and was leased to the B&A in 1879, as a short branch from South Spencer to Spencer. The B&A outright bought it in 1889.

North Brookfield

The North Brookfield Railroad was chartered in 1874, inbcorporated in 1875 and opened in 1876, branching from the B&A in East Brookfield and running to North Brookfield. It was leased to the B&A from opening.

Ware River

The Ware River Railroad was chartered in 1868, running from Palmer to the Cheshire Railroad in Winchendon. The first section, from Palmer to Gilbertville, opened in 1870, and the rest in 1873. Until 1873 it was leased to and operated by the New London Northern Railroad; at that time the lease was transferred to the B&A, as a reorganization of the earlier company.

Athol

The Athol and Enfield Railroad and Springfield and North-Eastern Railroad were chartered in 1869, and succeeded by the Springfield, Athol and Northeastern Railroad in 1872, opening in 1873 as a branch from Athol Junction in Springfield to the Vermont and Massachusetts Railroad in Athol. The B&A bought the line in 1880. The majority of the line was closed in the 1930s due to the formation of the Quabbin Reservoir.

Chester and Becket

The Chester and Becket Railroad was chartered in 1896 and opened in 1897 from Chester west to quarries in Becket. It was always operated by the B&A.

North Adams

The Pittsfield and North Adams Railroad was incorporated in 1842 and opened in 1846, having been already leased to the Western Railroad. It ran from North Adams Junction in Pittsfield to North Adams, where it connected to the Troy and Greenfield Railroad.

Hudson

The Hudson and Berkshire Railroad was chartered in 1828 to build a line from Hudson, New York to the Massachusetts state line. Construction began in 1835 and was completed in 1838. The company was leased to the Berkshire Railroad, along with the connecting West Stockbridge Railroad, in 1844, but was bought by the Western Railroad in 1854. The name was changed to the Hudson and Boston Railroad in 1855, and the part east of Chatham was abandoned around 1860, as it was redundant with the newer Albany and West Stockbridge Railroad (part of the B&A main line). The rest of the line formed a cutoff between the New York Central and Hudson River Railroad towards New York City and the B&A.

Post Road/Selkirk

The Post Road Branch or Selkirk Branch was originally built as part of the Hudson River Connecting Railroad, a southern bypass of the Albany area. It opened in 1924, and the part of it from the B&A at Post Road Crossing (the crossing of the Albany Post Road) to Schodack Junction on the east side of the Hudson River became the B&A Post Road Branch. The rest became the New York Central Railroad's Castleton Cut-Off.

Accessibility

All stations from Yawkey east and West Natick west are handicapped accessible; the ones in between are not. See also MBTA accessibility.

Station listing

State Milepost City Station Opening date Connections and notes
MA 0.00 Boston File:Accessible.png South Station 1899 Red Line and all south side Commuter Rail lines
Amtrak Acela Express, Regional and Lake Shore Limited
replaced older terminal
Columbus Avenue closed 1899
1.25 File:Accessible.png Back Bay 1899 originally Trinity Place
splits from Attleboro/Stoughton Line/Franklin Line/Needham Line
Amtrak Acela Express, Regional and Lake Shore Limited
File:Accessible.png Yawkey April 29, 1988 only operated during games at Fenway Park until January 2, 2001
merge with Grand Junction Branch
3.08 University closed
originally College Farms
Brookline Junction not a station
split with Highland Branch (original Brookline Branch)
4.30 Allston closed
5.06 Brighton closed
5.84 Faneuil closed
7.10 Newton Newton closed
8.14 Newtonville
9.19 West Newton
10.29 Auburndale
10.90 Riverside closed October 27, 1977
split with Highland Branch and Newton Lower Falls Branch
12.58 Wellesley Wellesley Farms
13.50 Wellesley Hills
14.73 Wellesley Square originally Wellesley
Lake Crossing closed
17.64 Natick Natick split with Saxonville Branch
File:Accessible.png West Natick August 23, 1982
21.36 Framingham File:Accessible.png Framingham Amtrak Lake Shore Limited
junction with Milford Branch and Boston, Clinton, Fitchburg and New Bedford Railroad (NYNH&H, includes original Framingham Branch)
24.21 Ashland File:Accessible.png Ashland August 24, 2002 split with Hopkinton Railway (NYNH&H)
27.45 Southborough File:Accessible.png Southborough June 22, 2002 originally Cordaville
28.08 Southville closed
31.92 Westborough File:Accessible.png Westborough June 22, 2002
37.85 Grafton File:Accessible.png Grafton February 23, 2000 originally North Grafton
junction with Grafton and Upton Railroad
39.17 Millbury Millbury Junction closed
split with Millbury Branch
44.33 Worcester File:Accessible.png Worcester Amtrak Lake Shore Limited
replaced older terminal
temporarily closed October 26, 1975, reopened September 26, 1994
junction with Providence and Worcester Railroad (NYNH&H), Norwich and Worcester Railroad (NYNH&H), Worcester, Nashua and Rochester Railroad (B&M) and Boston, Barre and Gardner Railroad (B&M)
45.30 Hammond Street closed
junction with Norwich and Worcester Railroad (NYNH&H)
47.86 Jamesville closed
53.06 Auburn Webster Junction not a station
split with Webster Branch
53.06 Leicester Rochdale closed
57.53 Charlton Charlton closed
61.90 Spencer South Spencer closed
merge with Spencer Branch
63.78 East Brookfield East Brookfield closed
merge with North Brookfield Branch
66.99 Brookfield Brookfield closed
69.60 West Brookfield West Brookfield closed
72.62 Warren Warren closed
74.94 West Warren closed
78.38 Brimfield West Brimfield closed
83.61 Palmer Palmer closed
junction with Ware River Branch and New London Northern Railroad (CN)
88.68 Wilbraham North Wilbraham closed
92.55 Springfield Oak Street closed
merge with connection to Athol Branch
Athol Junction not a station
merge with Athol Branch
98.33 Springfield Amtrak Lake Shore Limited
junction with Hartford and Springfield Railroad (NYNH&H), Springfield and New London Railroad (NYNH&H) and Connecticut River Railroad (B&M)
100.83 West Springfield West Springfield closed
Agawam Junction not a station
split with Central New England Railway (NYNH&H)
107.90 Westfield Westfield closed
junction with New Haven and Northampton Railroad (NYNH&H)
112.87 Russell Woronoco closed
115.39 Russell closed
119.25 Huntington Huntington closed
125.84 Chester Chester closed
split with Chester and Becket Branch
130.63 Middlefield Middlefield closed
134.12 Becket Becket closed
137.65 Washington Washington closed
141.91 Hinsdale Hinsdale closed
145.25 Dalton Dalton closed
148.16 Pittsfield North Adams Junction closed
merge with North Adams Branch
150.59 Pittsfield Amtrak Lake Shore Limited
junction with Stockbridge and Pittsfield Railroad (NYNH&H)
154.20 West Pittsfield closed
156.74 Richmond Richmond Summit closed
158.77 Richmond closed
159.81 Richmond Furnace closed
161.78 West Stockbridge State Line closed
junction with West Stockbridge Railroad (NYNH&H)
NY 163.59 Canaan Edwards Park closed
166.98 Canaan closed
171.35 Chatham East Chatham closed
174.99 Payn's closed
177.17 Ghent Chatham closed
junction with Hudson Branch, New York and Harlem Railroad (NYC) and Chatham and Lebanon Valley Railroad (Rutland)
182.06 Chatham Chatham Center closed
184.72 Kinderhook Niverville closed
187.41 Schodack Post Road closed
split with Post Road Branch
190.14 Van Hoesen closed
192.40 Brookview closed
195.41 East Greenbush East Greenbush closed
199.83 Rensselaer Rensselaer Amtrak Lake Shore Limited
junction with New York Central Railroad