Autostrada A18 (Poland)

from Wikipedia, the free encyclopedia
Template: Infobox high-level road / Maintenance / PL-A
Autostrada A18 in Poland
Autostrada A18 (Poland)
 E36-PL.svg
map
Autostrada A18 (Poland)
   In operation     In construction    In planning  
Basic data
Operator: GDDKiA-2011-Logo.svg
Start of the street: Olszyna
( 51 ° 40 ′  N , 14 ° 45 ′  E )
End of street: Krzyżowa
( 51 ° 20 ′  N , 15 ° 39 ′  E )
Overall length: 75.01 km
  of which in operation: 5.57 km
  of which under construction: 33.57 km
  of which in planning: 37.14 km

Voivodeship :

Requirement for use: Truck route toll
Development condition: 2 × 2 lanes
Autostrada A18 (Polska) .jpg
The already completely modernized section at Golnice
Course of the road
Template: AB / Maintenance / NextDEGermany Continue on  → Cottbus , BerlinA15 E36
flow (190 m)  Lusatian Neisse
EU border crossing Forest (DE) - Olszyna (PL)
Lubusz Voivodeship
Autobahn end signposted as DK18 E36
Junction (1 / km 1)  Olszyna
Green bridge (km 2) 
Green bridge (km 5) 
Gas station Rest stop (km 6)  Symbol: leftSymbol: left MOP Trzebiel (Cat. 3) Symbol: hotel
Gas station Rest stop (km 6)  Symbol: rightSymbol: right MOP Jagłowice (Cat. 2)
Junction (2 / km 10)  Żary ZachódDK12
Green bridge (km 11) 
Green bridge (km 14) 
parking spot with toilet (km 20)  Symbol: leftSymbol: left MOP Rościce Południe (cat. 1)
parking spot with toilet (km 20)  Symbol: rightSymbol: right MOP Rościce Północ (cat. 1)
Green bridge (km 23) 
Junction (3 / km 25)  Żary Południe DK27
Green bridge (km 31) 
Gas station Rest stop Symbol: leftSymbol: left MOP Wymiarki Południe (Cat. 2)
Gas station Rest stop Symbol: rightSymbol: right MOP Wymiarki Północ (Cat. 3) Symbol: hotel
Green bridge (km 34) 
Junction (4 / km 38)  Iłowa DW296
Green bridge (km 40) 
Green bridge (km 43) 
Green bridge (km 46) 
Green bridge (km 48) 
Lower Silesian Voivodeship
Green bridge (km 50) 
Green bridge (km 53) 
Junction (5 / km 54)  Luboszów
parking spot with toilet (km 56)  Symbol: rightSymbol: right MOP Świętoszów Północ (Cat. 1)
parking spot with toilet (km 57)  Symbol: leftSymbol: left MOP Świętoszów Południe (Cat. 1)
Green bridge (km 59) 
Green bridge (km 62) 
Green bridge (km 63) 
Green bridge (km 65) 
Junction (6 / km 71)  Bolesławiec GolniceDW297
Green bridge (km 71) 
Autobahn beginning signposted as A18 E36
Gas station Rest stop Icon: Left RightIcon: Left Right MOP Lipiany (Cat. 2)
node (7 / km 74)  Krzyżowa A4 E40
  • Under construction
  • In planning
  • The Autostrada A18 ( Polish for "Autobahn A18") is a motorway in Poland . It runs from the Krzyżowa junction , where it branches off the A4 and leads northwest to the German-Polish border near Olszyna in the rural community of Trzebiel . The federal highway 15 begins there . The motorway is 75 kilometers long and is part of the Pan-European Transport Corridor  III A.

    In 2006, the southern carriageway built as the Reichsautobahn Berlin – Breslau was extended by a northern carriageway over a length of 71 kilometers. The non-modernized southern carriageway is expected to be modernized by 2023; the first 20 km behind the border with Germany are currently under construction.

    Until the completion of the modernization, the route will be run as Landesstraße 18 (Polish: Droga krajowa 18 ). The rededication to the A18 should only take place after the conversion work has been completed.

    history

    Former Reichsautobahn 9 (southern lane, 2012)

    Today's A18 was built in the mid-1930s as part of the Reichsautobahn 9 Berlin – Breslau (on the German side, today A13 and A15 ) in what was then German Silesia. The route was single-lane (southern carriageway), although it was already prepared for full expansion (e.g. the bridges were built wider or space was left for the second half of the carriageway). Only the short section from Lipiany (Linden) to today's confluence with the A4 at the Krzyżowa motorway junction was already designed with two lanes.

    In 1993, between the Królów exit and the Forst / Olszyna border crossing, the previously non-existent northern carriageway was built in the motorway standard for 9.5 km. The renovation and expansion of the southern carriageway in this section did not take place.

    In 1995, the two-sided rehabilitation of the 7 km long section between Golnice ( rural municipality Bolesławiec ) and the Krzyżowa motorway junction , which had previously had two carriageways, followed. Until 2001, this section was part of the A12 , which ran from Golnice to the then transition to the A4 at the Krzywa junction.

    From 2004 the continuous construction of the north carriageway of the A18 between Golnice and Królów was pushed ahead. The construction work was divided into 4 sections. The work was completed in mid-2006 and cost around 398 million zlotys .

    Sections

    section length    construction time    building-costs Traffic transfer annotation
    Border crossing DE / PL - Olszyna junction (km 0.633) 00.44 km -
    1936-1938
    -
    -
    1993
    1938
    North carriageway
    South carriageway
    Modernization of both lanes planned
    Olszyna junction (km 0.633 - km 1.500) 00.87 km -
    2004-2005
     
    -
    3 million zloty
    (1 million euros)
    1993
    December 20, 2005
     
    North carriageway
    Modernization of the north carriageway,
    further modernization planned
    1936-1938
    -
    1938
    South carriageway
    Modernization of the southern carriageway planned
    Olszyna junction (km 1,500) - Żary Zachód junction (km 9,550) 08.05 km -
    2004-2005
    -
    28 million zlotys
    (7 million euros)
    1993
    December 20, 2005
    North carriageway
    Modernization of the north carriageway
    1936-1938
    -
    1938
    South carriageway
    Modernization of the southern carriageway planned
    Żary Zachód junction (km 9,550) - Jędrzychowice (km 11,860) 02.31 km 2004-2006 14 million zlotys
    (4 million euros)
    September 27, 2006 North carriageway
    1936-1938
    -
    1938
    South carriageway
    Modernization of the southern carriageway planned
    Jędrzychowice (km 11,860) - Żary Południe junction (km 24,730) 12.87 km 2004-2006 78 million zlotys
    (20 million euros)
    September 27, 2006 North carriageway
    1936-1938
    2019-2022
    -
    149 million zlotys
    (37 million euros)
    1938
    September 2022Template: future / in 2 years
    South carriageway
    Modernization of the south carriageway
    Żary Południe junction (km 24.730) - Lubieszów (km 33.760) 09.03 km 2004-2006 42 million zlotys
    (11 million euros)
    September 27, 2006 North carriageway
    1936-1938
    2019-2022
    -
    105 million zlotys
    (26 million euros)
    1938
    September 2022Template: future / in 2 years
    South carriageway
    Modernization of the south carriageway
    Lubieszów (km 33,760) - Iłowa junction (km 37,500) 03.74 km 2004-2006 17 million zloty
    (4 million euros)
    September 27, 2006 North carriageway
    1936-1938
    -
    1938
    South carriageway
    Modernization of the southern carriageway planned
    Iłowa junction (km 37,500) - Lubusz / Lower Silesia (km 50,000) 12.50 km 2004-2006 48 million zloty
    (12 million euros)
    November 6, 2006 North carriageway
    1936-1938
    -
    1938
    South carriageway
    Modernization of the southern carriageway planned
    Lubusz / Lower Silesia (km 50,000) - Golnice junction (km 70,899) 20.90 km 2004-2006 83 million zloty
    (21 million euros)
    November 6, 2006 North carriageway
    1936-1938
    -
    1938
    South carriageway
    Modernization of the southern carriageway planned
    Golnice junction (km 70.899) - Krzyżowa junction (km 75.200) 04.3 km 1936-1937
    1995-1996
    -
    -
    October 17, 1937
    1996
    Krzyżowa 01.27 km 2007-2009 August 10, 2009
    total 75.01 km

    Planned sections

    South carriageway:

    • Olszyna – Golnice (71 km): demolition and rebuilding of the southern lane. The unrealized construction work was planned for the period 2014 to 2020.
    South carriageway
    section length comment
    Border crossing - Olszyna 1.1 km Under construction
    Olszyna - Żary Zachód 8.6 km Under construction
    Żary Zachód - Iłowa 27.3 km Under construction
    Iłowa - Golnice 34.0 km

    See also

    Web links

    Commons : Autobahn A18  - Collection of pictures, videos and audio files

    Individual evidence

    1. autobahn-online.de
    2. A18 czeka na nową perspektywę. In: rynekinf Infrastruktury.pl. Rynek Infrastruktury, September 10, 2012, accessed January 12, 2020 (Polish).
    3. Elżbieta Pałys: Na S3 dobudowują już tylko MOP-y. Ruszyły prac przy A18. In: rynekinf Infrastruktury.pl. Rynek Infrastruktury, January 11, 2020, accessed January 12, 2020 (Polish).
    4. Overview map of all motorways and expressways (GDDKiA)