Droga ekspresowa S5

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking road / maintenance / PL-S
Droga ekspresowa S5 in Poland
Droga ekspresowa S5
 E261-PL.svg
map
Droga ekspresowa S5
   In operation     In construction    In planning  
Basic data
Operator: GDDKiA-2011-Logo.svg
Start of the street: Ostróda
( 53 ° 41 ′  N , 20 ° 1 ′  E )
End of street: Wroclaw
( 51 ° 10 ′  N , 17 ° 1 ′  E )
Overall length: 465 km / 437 km without
common sections
  of which in operation: 321.7 km / 292.9 km
  of which under construction: 88.1 km
  of which in planning: 90 km

Voivodeship :

Requirement for use: Truck route toll
Development condition: 1 × 2 and 2 × 2 lanes
S5 Bydgoszcz z węzła Lotnisko 2.jpg
The S5 near Bydgoszcz
Course of the road
Warmian-Masurian Voivodeship
Template: AB / Maintenance / Empty Currently signposted as DK16
Template: AB / Maintenance / Empty from here 4-lane
node Ostróda- PoludnieS7 E77
Junction Ostróda-Poludnie
Roundabout Ostróda-Ornowo DK15
Junction Ostróda-Ornowo DK15
Roundabout Wirwajdy DK16
Continue on section Ostróda − Nowe Marzy
Locality Iława
Locality Grudziądz
Kuyavian-Pomeranian Voivodeship
Template: AB / Maintenance / Empty Common section with DK91
node (1)  Nowe Marzy A1 E75 DK91
Gas station Rest stop MOP Święte Symbol: Up
Junction (2)  Sartowice
Gas station Rest stop MOP Wiąg Symbol: Down
Template: AB / Maintenance / Empty from here 2 lanes
Junction (3)  Świecie -Północ
Junction (4)  Świecie-Zachód DK91 DW240
Junction (5)  Świecie-Południe Symbol: Up
Junction (5)  Świecie-Południe
Junction (6)  Gruczno DW245
Gas station Rest stop MOP Małociechowo Symbol: Down
Junction (7)  Pruszcz DW248
Gas station Rest stop MOP Trzeciewiec Symbol: Up
Junction (8th)  Koronowo DK56 DW256
Template: AB / Maintenance / Empty from here 4-lane
Junction (9)  Bydgoszcz -PółnocDK5 DW244
Junction (10)  Maksymilianowo DW244
Junction (11)  Bydgoszcz-Opławiec DK25
Template: AB / Maintenance / Empty Common section with 25
Gas station Rest stop MOP Szczutki Icon: UpDownIcon: UpDown
Template: AB / Maintenance / Empty Common section with 25 & S10
node (12)  Bydgoszcz-Zachód S10 DK80
Junction (13)  Bydgoszcz-Miedzyń
node (14)  Bydgoszcz-Błonie S10 DW223
Gas station Rest stop MOP Kruszyn Krajeński Symbol: Up
Junction (15)  Rynarzewo
Junction (16)  Szubin -Północ
Junction (17)  Szubin-Południe
Junction (18)  Pałuki
Template: AB / Maintenance / Empty from here 4-lane
Junction (19)  Żnin -PółnocDW251
Junction (20)  Żnin-Zachód DW251
Gas station Rest stop MOP Bożejewiczki Symbol: Down
Gas station Rest stop MOP Żnin Symbol: Up
Junction (21)  Biskupin
Junction (22)  Rogowo
Junction (23)  Lubcz
Greater Poland Voivodeship
Junction (24)  Mieleszyn
parking spot with toilet MOP Modliszewko-Zachód (Cat. 1) Symbol: Down
parking spot with toilet MOP Modliszewko-Wschód (Cat. 1) Symbol: Down
Junction (25)  Gniezno -Północ
Junction (26)  Kłecko DW190
node (27)  Gniezno-Poludnie DW194
parking spot with toilet MOP Łubowo -Północ (Cat. 1)Symbol: Down
Gas station Rest stop Symbol: hotelMOP Łubowo -Północ (Cat. 3)Symbol: Down
Gas station Rest stop MOP Łubowo-Południe (Cat. 1) Symbol: Up
Gas station Rest stop Symbol: hotel MOP Łubowo-Południe (Cat. 3) Symbol: Up
Junction (28)  Łubowo DW434
Junction (29)  Czerniejewo
parking spot with toilet MOP Wagowo-Północ (Cat. 1) Symbol: Down
parking spot with toilet MOP Wagowo-Południe (Cat. 1) Symbol: Up
Junction (30)  Iwno
node (31)  Kostrzyn DK92
Junction (32)  Strumiany
parking spot with toilet MOP Czerlejnko -Północ (Cat. 1)Symbol: Down
Gas station Rest stop MOP Czerlejnko-Północ (Cat. 2) Symbol: Down
parking spot with toilet MOP Czerlejnko-Południe (cat. 1) Symbol: Up
Gas station Rest stop MOP Czerlejnko-Południe (Cat. 2) Symbol: Up
Junction (33)  Kleszczewo
Template: AB / Maintenance / Empty Common section with A2
node (34)  Poznań Wschód A2 E30
Gas station Rest stop Symbol: hotel MOP Krzyżowniki (cat. 3) Symbol: Down
Gas station Rest stop MOP Tulce (Cat. 2) Symbol: Up
Template: AB / Maintenance / Empty Common section with A2 & S11
node (11)  Poznań-Krzesiny S11 DW433
Template: AB / Maintenance / Empty from here on 6 lanes
flow (306 m)  Warthe (Lucjan Ballenstaedt Bridge)
Junction (10)  Poznań - Luboń DW430
tunnel (130 m)  Debina
node (9)  Poznań-Komorniki DW196
node (35)  Poznań-Zachód A2 E30 S11
Template: AB / Maintenance / Empty from here 4-lane
Junction (36)  Konarzewo
node (37)  Stęszew DK32
park Rest MOP Sorocko Symbol: Down
Gas station Rest stop MOP Zamysłowo Symbol: Up
Junction (38)  Mosina DW431
Junction (39)  Czempiń
Junction (40)  Kościan -PółnocDW308
Junction (41)  Kościan-Poludnie
Junction (42)  Śmigiel -Północ
Junction (43)  Śmigiel-Południe
Junction (44)  Lipno DW309
parking spot with toilet MOP Wilkowice-Zachód (Cat. 1) Symbol: Down
parking spot with toilet MOP Wilkowice-Wschód (Cat. 1) Symbol: Up
Junction (45)  Święciechowa
node (46)  Leszno -ZachódDK12
Junction (47)  Leszno-Poludnie DW323
Junction (48)  Rydzyna
Junction (49)  Bojanowo
parking spot with toilet MOP Gołaszyn-Zachód (Cat. 1) Symbol: Down
Gas station Rest stop MOP Gołaszyn-Zachód (Cat. 2) Symbol: Down
parking spot with toilet MOP Gołaszyn-Wschód (Cat. 1) Symbol: Up
Gas station Rest stop Symbol: hotel MOP Gołaszyn-Wschód (Cat. 3) Symbol: Up
Junction (50)  Rawicz DK36
parking spot with toilet MOP Folwark-Zachód (Cat. 1) Symbol: Down
Gas station Rest stop Symbol: hotel MOP Folwark-Zachód (Cat. 3) Symbol: Down
parking spot with toilet MOP Folwark-Wschód (Cat. 1) Symbol: Up
Gas station Rest stop MOP Folwark-Wschód (Cat. 2) Symbol: Up
Lower Silesian Voivodeship
Junction (51)  Korzeńsko
Junction (52)  Żmigródek DW439
Junction (53)  Żmigród DW339
Gas station Rest stop MOP Morzęcino-Zachód (Cat. 2) Symbol: Down
Gas station Rest stop Symbol: hotel MOP Morzęcino-Wschód (Cat. 3) Symbol: Up
Junction (54)  Krościna
Junction (55)  Prusice
Junction (56)  Trzebnica DK15 DW340
Gas station Rest stop Symbol: hotel MOP Wisznia Mała-Zachód (Cat. 3) Icon: UpDownIcon: UpDown
Gas station Rest stop MOP Wisznia Mała-Wschód (Cat. 2) Symbol: Up
Junction (57)  Kryniczno
Junction (58)  Wrocław -PółnocDK5 E261 Symbol: Down
node (58)  Wrocław-Północ A8 E67
  • Under construction
  • In planning
  • The Droga ekspresowa S5 ( Polish for "expressway S5") is a partially completed or under construction and in the planning state expressway in Poland . It should branch off from the S7 expressway at Ostróda and run via Grudziądz , where it crosses the A1 motorway , Bydgoszcz and Poznan to Wroclaw , where it meets the A8 motorway . In the course of this, the S5 will cross four voivodships and become part of European route 261 .

    Planning history

    A connection from Bydgoszcz via Poznan to Wroclaw is planned in the road construction plans of 1945/46. Today's A1 should follow this plan via Bydgoszcz and from there the route of the S5 should branch off. In the plans of 1963 and 1971, the route is included with slight modifications. Since 1976 the route has been included in the course it is now running. Since 1985 it has been known as Droga ekspresowa. From 2001 onwards, the route will be referred to as the S5. On October 13, 2015, the course of the road was extended by a government decision by about 100 kilometers in a north-easterly direction from Nowe Marzy near Grudziądz to Ostróda to the S7 expressway . On this route, the expressway is to run parallel to state road 16 and replace it.

    Completed sections

    section length construction time building-costs Traffic transfer
    Node Ostróda -Południe - Ostróda-Ornowo 008.7 km 2015-2018 623 million zlotys
    (156 million euros)
    June 22, 2018
    Node Świecie-Polnoc - node Świecie-Zachód (1) 007.2 km December 19, 1996
    Świecie-Zachód knot - Świecie-Południe knot (1) 005.6 km October 27, 1998
    Node Bydgoszcz -Północ - node Bydgoszcz Opławiec 014.7 km 2015-2019 369 million zlotys
    (92 million euros)
    December 31, 2019
    Node Bydgoszcz -Błonie 2008-2009 December 18, 2009
    Node Żnin -Północ - node Mieleszyn 025.1 km 2015-2019 422 million zlotys
    (106 million euros)
    23 December 2019
    Node Mieleszyn - node Gniezno -Południe 018.3 km 2014-2017 529 million zlotys
    (132 million euros)
    3rd July 2017
    Gniezno-Południe knot - Czerniejewo knot 014.9 km 2009–2012 527 million zlotys
    (126 million euros)
    4th June 2012
    Czerniejewo node - Poznań-Wschód node 020.1 km 2009–2012 537 million zlotys
    (128 million euros)
    4th June 2012
    Poznań-Wschód Junction - Poznań-Zachód Junction (2) 028.0 km Realization as a section of the A2 motorway
    Poznań-Zachód Knot - Mosina Knot 016.0 km 2015-2019 529 million zlotys
    (132 million euros)
    1st December 2018

    (east lane)

    September 14, 2019

    (western lane)

    Mosina knot - Kościan -Południe knot 019.0 km 2016-2019 359 million zlotys
    (90 million euros)
    December 14, 2019
    Kościan-Południe Knot - Lipno Knot 016.0 km 2016-2019 303 million zlotys
    (76 million euros)
    December 14, 2019
    Lipno Knot - Leszno- Poludnie Knot 019.2 km 2016-2018 443 million zlotys
    (111 million euros)
    November 2018
    Node Leszno -Południe - node Rydzyna 009.5 km 2016-2018 233 million zlotys
    (58 million euros)
    September 2018
    Node Rydzyna - node Korzeńsko 029.3 km 2010-2014 908 million zlotys
    (227 million euros)
    15th September 2014
    Korzeńsko Knot - Krościna Knot 015.0 km 2014-2017 576 million zloty
    (144 million euros)
    October 2017
    Krościna knot - Trzebnica knot 013.8 km 2014-2017 311 million zlotys
    (78 million euros)
    December 2017
    Trzebnica knot - Wrocław- Północ knot 019.3 km 2014-2017 598 million zlotys
    (150 million euros)
    December 2017
    total 0321.7 km
    0292.9 km *
    7.26 billion zloty
    (1.81 billion euros)
    * Kilometers without common sections
    (1) only one lane
    (2) Common section with the A2 motorway

    Sections under construction

    section length Contract
    signing
    construction time building-costs planned
    completion
    Node Nowe Marzy - node Świecie -Północ 010.5 km October 12, 2015 2015-2022 233 million zlotys
    (58 million euros)
    2022Template: future / in 2 years
    Świecie-Północ node - Świecie-Południe node (3) 012.8 km October 12, 2015 2015-2022 142 million zloty
    (36 million euros)
    2022Template: future / in 2 years
    Świecie-Południe node - Bydgoszcz- Północ node 022.3 km October 12, 2015 2015-2022 410 million zlotys
    (103 million euros)
    2022Template: future / in 2 years
    Node Bydgoszcz Opławiec - node Bydgoszcz -Błonie 013.5 km October 12, 2015 2015-2020 328 million zlotys
    (82 million euros)
    October 2020
    Bydgoszcz-Błonie knot - Szubin- Północ knot 009.7 km October 12, 2015 2015-2022 260 million zlotys
    (65 million euros)
    2022Template: future / in 2 years
    Node Szubin-Północ - node Żnin -Północ 019.3 km October 12, 2015 2015-2020 352 million zlotys
    (88 million euros)
    October 2020
    total 88.1 km 1.73 billion zlotys
    (524 million euros)
    (3) Construction of the second lane

    Planned sections

    section length planned construction time estimated construction costs
    Ostróda-Ornowo - Nowe Marzy node 090.0 km unknown

    particularities

    At Szubin , the S5 has only two lanes. Between the motorway junctions Poznan-Wschód and Poznan-Zachód S5 runs on a common section with the A2 highway and freeway S11 .

    Web links

    Commons : Expressway S5  - collection of pictures, videos and audio files

    Individual evidence

    1. History of the S5 motorways-exitlists.com (accessed on April 1, 2016)
    2. Eugeniusz Buszma: "Przegląd komunikacyjny" No. 3-4 September-October 1945th ( Memento of 18 December 2007 at the Internet Archive ) (Polish)
    3. Eugeniusz Buszma: "Drogowiec" No. 1 and 2 from 1946 ( Memento from December 18, 2007 in the Internet Archive ) (Polish)
    4. Network plans from 1939 to 2004
    5. Eugeniusz Buszma: "Drogowiec" No. 8 from 1971 ( Memento from December 18, 2007 in the Internet Archive ) (Polish)
    6. Decision of the regional council of January 23, 1976 ( memento of September 27, 2007 in the Internet Archive ) (Polish)
    7. Decision of the regional council of June 14, 1985 ( memento of December 18, 2007 in the Internet Archive ) (Polish)
    8. ^ Resolution of the Council of Ministers of September 28, 1993 (Polish)
    9. Decision of the Council of Ministers of January 23, 1996 (Polish)
    10. Decision of the Council of Ministers of September 29, 2001 (Polish)
    11. Decision of the Council of Ministers of August 26, 2003 (Polish)
    12. Decision of the Council of Ministers of May 15, 2004 (Polish)
    13. Decision of the Council of Ministers of July 13, 2007 (Polish)
    14. ^ Resolution of the Council of Ministers of October 20, 2009 (Polish)
    15. Decision of the Council of Ministers of October 13, 2015 (Polish)
    16. a b c overview map of all motorways and expressways (GDDKiA)
    17. ^ Droga S5 Żnin - Gniezno. Retrieved July 28, 2018 (pl-PL).