Droga ekspresowa S7

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking road / maintenance / PL-S
Droga ekspresowa S7 in Poland
Droga ekspresowa S7
 E28-PL.svg E77-PL.svg
map
Droga ekspresowa S7
   In operation     In construction    In planning  
Basic data
Operator: GDDKiA-2011-Logo.svg
Start of the street: Gdansk
( 54 ° 17 ′  N , 18 ° 35 ′  E )
End of street: Rabka-Zdrój
( 49 ° 37 ′  N , 19 ° 56 ′  E )
Overall length: 704.8 km / 674 km without
common sections
  of which in operation: 470.5 km / 439.7 km
  of which under construction: 162.1 km
  of which in planning: 73.5 km

Voivodeship :

Requirement for use: Truck route toll
Development condition: 2 × 2 and 2 × 3 lanes
ObwodnicagrojcaS7.jpg
Grójec bypass
Course of the road
Pomeranian Voivodeship
Template: AB / Maintenance / Empty Currently as S6dedicated
Template: AB / Maintenance / Empty from here 4-lane
crossing (1)  Gdynia -ChyloniaDK6 E28
Junction (2)  Gdynia port
Junction (3)  Gdynia-Chwarzno
node (4)  Gdynia-Wielki Kack DK20
node (5)  Chwaszczyno S6 E28
node (6)  Mieszewo
Junction (7)  Żukowo DK20
park Rest MOP Widlino (Cat. 1) Icon: UpDownIcon: UpDown
Junction (8th)  Lublewo DW221
Template: AB / Maintenance / Empty from here 4-lane
node (9)  Gdańsk- PoludnieS6 E28
Junction (10)  Gdańsk-Lipce DK91 E75 E77
bridge (2750m) 
flow Motława
Junction (11)  Gdańsk port
Junction (12)  Gdańsk-Wschód DW226
Gas station Rest stop MOP Koszwały (Cat. 2) Symbol: Up
Junction (13)  Żuławy -Zachód
bridge Canal Piastowski
Junction (14)  Cedry Małe
bridge Śledziowy Canal
flow Wisła
Junction (15)  Dworek
Gas station Rest stop MOP Mała Holandia Symbol: Down
Gas station Rest stop MOP Mirówko Symbol: Up
Junction (16)  Nowy Dwór Gdański DW502
node (17)  Żuławy-Wschód DK55
bridge Kanał Izbowa Łacha
Warmian-Masurian Voivodeship
flow Nogat
Junction (18)  Elbląg -Zachód
bridge (362m) 
Junction (19)  Elbląg -PołudnieDK22 DW500
flow Elbląg
Gas station Rest stop MOP Nowa Holandia Symbol: Down
node (20)  Elbląg-Wschód S22 E28 DW500
Junction (21)  Bogaczewo
Junction (22)  Pasłęk -PółnocDW527
Junction (23)  Pasłęk-Południe DW526
Junction (24)  Marzewo
Junction (25)  Małdyty DW519
parking spot with toilet MOP (Cat. 1) Symbol: Down
parking spot with toilet MOP (Cat. 1) Symbol: Up
Gas station Rest stop Symbol: hotel MOP Sople (Cat. 3) Symbol: Down
Gas station Rest stop MOP Sople (Cat. 2) Symbol: Up
Junction (26)  Miłomłyn -Północ
Junction (27)  Miłomłyn-Południe
Junction (28)  Ostróda -PółnocDW530
Gas station Rest stop MOP Ostróda (Cat. 2) Icon: UpDownIcon: UpDown
node (29)  Ostróda-Poludnie DK16
node (29)  Ostróda-Poludnie S5 DK16
parking spot with toilet MOP Gabin (Cat. 1) Icon: UpDownIcon: UpDown
Junction (30)  Rychnowo DW542
Gas station Rest stop MOP Olsztynek (Cat. 2)Icon: UpDownIcon: UpDown
node (31)  Olsztynek -ZachódS51
Junction (32)  Grunwald DW537
park Rest MOP Waplewo Symbol: Up
Junction (33)  Waplewo
Gas station Rest stop MOP Vitamovo Symbol: Down
Junction (34)  Rączki
Junction (35)  Nidzica -Północ
Junction (36)  Nidzica-Poludnie
parking spot with toilet MOP Pawliki (Cat. 1) Icon: UpDownIcon: UpDown
Junction (37)  Powierż
Junction (38)  Napierki
Masovian Voivodeship
Transition in DK7 E77
parking spot with toilet MOP Pepłowo (Cat. 1) Symbol: Down
Gas station Rest stop MOP Pepłowo (Cat. 2) Symbol: Up
Junction (39)  Mława -Północ
Junction (40)  Mława-Południe DW544
Junction (41)  Modła
parking spot with toilet MOP Kosiny (Cat. 1) Symbol: Down
Gas station Rest stop MOP Kosiny (Cat. 2) Symbol: Up
Junction (42)  Żurominek
Junction (43)  Strzegowo -PółnocDK7
Junction (44)  Strzegowo-Poludnie DK7
Junction (45)  Glinojeck DK60
Gas station Rest stop Symbol: hotel MOP Rybitwy (Cat. 3) Symbol: Down
Gas station Rest stop MOP Rybitwy (Cat. 2) Symbol: Up
Junction (46)  Pieńki Rzewińskie
Junction (47)  Dłużniewo
Gas station Rest stop Symbol: hotel MOP Dłużniewo (Cat. 3) Symbol: Down
Gas station Rest stop Symbol: hotel MOP Ćwiklinek (Cat. 3) Symbol: Up
Template: AB / Maintenance / Empty from here 4-lane
node (48)  Płońsk -CiechanówDK50
Junction (49)  Płońsk
Junction (50)  Płońsk-Siedlin DK10 DK50
Junction (51)  Przyborowice DW571
Template: AB / Maintenance / Empty from here 4-lane
Junction (52)  Załuski
Junction (53)  Zakroczym -OstrzykowiznaSymbol: Down DK62
Junction (54)  Nowy Dwór Mazowiecki -ModlinDK62
flow (531m)  Wisła
Junction (55)  Nowy Dwór Maz.-Błonie DK85 DW579
Junction (56)  Czosnów
Junction (57)  Palmiry
Gas station Rest stop MOP Icon: UpDownIcon: UpDown
Junction (58)  Warszawa -ŁomiankiSymbol: Down DK7
Junction (59)  Warszawa-Łomianki Symbol: Up
Junction (60)  Warsaw -Wólka WęglowaSymbol: Down
Junction (61)  Warszawa-Wólka Węglowa Symbol: Up
tunnel (1600m)  Bemowo
Junction (62)  Warszawa-Chomiczówka
Template: AB / Maintenance / Empty Together with S8
Template: AB / Maintenance / Empty from here on 6 lanes
node (63)  Warszawa-Północ S8 E67
Junction (R7)  Warszawa-Bemowo DW580
Junction (R8)  Warszawa-Zachód DK92
Template: AB / Maintenance / Empty Together with S2 S8
node (R9)  Konotopa A2 S2 E30
Junction (R10)  Warszawa-Opacz DW719 Symbol: Up
node (R10)  W. Opacz S2 E30 DK7
Template: AB / Maintenance / Empty Provisional course, together with S8
Junction (58)  Warszawa-Puchały
node (57)  Warszawa -JankiS8
Transition in DK7
Template: AB / Maintenance / Empty New, already existing route, together with S2
Junction (R10)  W. Opacz
node (R11 / 64)  Warszawa-Poludnie S2 E30 S79
Junction (65)  Zamy
Junction (66)  Lesznowola DW721
Junction (67)  Antoninów
Gas station Rest stop MOP Icon: UpDownIcon: UpDown
Junction (68)  Złotokłos
Junction (69)  Tarczyn-Północ DW876
Junction (70)  Tarczyn-Południe DK7
Gas station Rest stop MOP Icon: UpDownIcon: UpDown
Template: AB / Maintenance / Empty from here 4-lane
Junction (71)  Głuchów Symbol: Down
Junction (72)  Grójec -MszczonowskaDK50
Junction (72)  Grójec-Mogielnicka DW728
Junction (73)  Kępina Symbol: Down
Junction (74)  Skurów DW730
Junction (75)  Józefów
Junction (76)  Broniszew
Junction (77)  Białobrzegi -PółnocDW731
flow Pilica
Junction (78)  Białobrzegi DK48
Junction (79)  Kamień
Junction (80)  Gózd DW732
Junction (81)  Radom -PółnocDK7
park Rest MOP Icon: UpDownIcon: UpDown
Junction (82)  Radom-Zachód DW740
node (83)  Radom-Wolanów DK12
Junction (84)  Radom-Południe DK7
Gas station Rest stop MOP Icon: UpDownIcon: UpDown
Junction (85)  Szydłowiec -Północ
Junction (86)  Szydłowiec Center DW727
Junction (87)  Szydłowiec-Południe
Gas station Rest stop MOP Icon: UpDownIcon: UpDown
Holy Cross Voivodeship
Junction (88)  Skarżysko-Kamienna -Północ
Junction (89)  Skarżysko-Kamienna Center
Junction (90)  Skarżysko-Kamienna -Południe DK42
Junction (91)  Suchedniów
Gas station Rest stop MOP Suchedniów-Zachód (Cat. 2) Symbol: Down
Gas station Rest stop MOP Suchedniów-Wschód (Cat. 2) Symbol: Up
Junction (92)  Zalezianka
Junction (93)  Barcza DW750
node (94)  Kielce -PółnocDK73
Junction (95)  Kielce-Zachód DK74, in the futureS74
Junction (96)  Kielce-Jaworznia DW761
park Rest MOP Szewce-Zachód Symbol: Down
park Rest MOP Szewce-Wschód Symbol: Up
Junction (97)  Kielce-Południe DW762
Junction (98)  Tokarnia
Junction (99)  Brzegi
Gas station Rest stop MOP Smyków (Cat. 2) Symbol: Up
Junction (100)  Mnichów
parking spot with toilet MOP Podlesie (Cat. 1) Symbol: Down
Junction (101)  Jędrzejów -PółnocDK78
Junction (102)  Jędrzejów-Wschód DK78
Junction (103)  Jędrzejów-Południe
parking spot with toilet MOP Potok Mały (Cat. 1) Symbol: Up
Junction (104)  Mierzawa
parking spot with toilet MOP Klemencice (Cat. 1) Symbol: Down
Junction (105)  Wodzislaw
Transition in DK7 E77
Lesser Poland Voivodeship (km 603)
Green bridge
Junction (106)  Książ
Gas station Rest stop MOP (Cat. 2) Icon: UpDownIcon: UpDown
Green bridge
Junction (107)  Miechów DW783
Template: AB / Maintenance / Empty Section Miechów - Szczepanowice
Junction (108)  Szczepanowice DK7
Gas station Rest stop MOP (Cat. 2) Icon: UpDownIcon: UpDown
Junction (109)  Widoma DK7
Junction (110)  Raciborowice
node (111)  Kraków -MistrzejowiceS52
Junction (112)  Kraków-Grebałów DW776
Template: AB / Maintenance / Empty from here on 6 lanes
Junction (113)  Kraków-Nowa Huta DK79
flow (706m)  Wisła
Junction (114)  Kraków-Przewóz
bridge (257m) 
Template: AB / Maintenance / Empty Together with A4
node (115)  Kraków-Bieżanów A4 E40
Junction (50)  Kraków-Wieliczka DK94
Junction (49)  Kraków-Łagiewniki
Template: AB / Maintenance / Empty from here 4-lane
node (116)  Kraków-Południe A4 E40
Junction (117)  Libertów
Junction (118)  Mogilany
Junction (119)  Głogoczów DK52
Junction (120)  Jawornik DW955
Junction (121)  Myślenice -Północ
Template: AB / Maintenance / Empty from here 4-lane
Junction (122)  Myślenice Center DW967
Junction (123)  Myślenice-Poludnie
Junction (124)  Stróża
Junction (125)  Pcim
Junction (126)  Lubień DW968
Template: AB / Maintenance / Empty from here 2 lanes
Template: AB / Maintenance / Empty 4-lane expansion to Naprawa
Gas station Rest stop MOP Lubień (Cat. 2) Symbol: Down
Gas station Rest stop Symbol: hotel MOP Krzeczów (Cat. 3) Symbol: Up
crossing Naprawa (provisional)
tunnel (2058m)  Luboń Mały tunnel
Template: AB / Maintenance / Empty from here 4-lane
Junction (127)  Skomielna Biała DK28
bridge (992m) 
Gas station Rest stop MOP Zbójecka Góra (Cat. 2) Symbol: Down
Junction (128)  Rabka -ZaborniaDK7 E77
Continue on DK47Zakopane
  • Under construction
  • In planning
  • The Droga ekspresowa S7 ( Polish for "expressway S7") is an expressway in planning or under construction in Poland and is intended to connect the greater Gdansk , Warsaw and Krakow areas. On it is between the node Gdansk -Południe and Elbląg -Wschód the European route 28 and between the node Żuławy -Zachód and the expansion end in Rabka the Europastraße 77 extend.

    Planning history

    A connection from Gdańsk via Elbląg to Warszawa was already provided in the expressway network plans of Poland from 1945 and 1946, which largely corresponded to the route planned today for the S7. In contrast, the Warsaw-Kraków route was not included in these plans. In 1963 the entire route to Zakopane was included for the first time , as was the plans for 1971. In 1976, the network plans included the entire route from Gdańsk to the southern border of Poland near Chyżne with continuation towards Budapest. This plan lasted until 1996. With the plan from 2001 the section from Rabka to Chyżne was omitted but contained a new connection from Rabka-Zdrój to Zakopane as S47. In 2003, the S47 from Rabka to Zakopane was also omitted, in the following years these variants were no longer included. The R3 expressway was planned in Slovakia from the Chyżne border crossing , which would lead to Budapest via Martin , Zvolen , and Šahy .

    Completed sections

    section length construction time building-costs Traffic transfer
    Node Gdańsk -Południe - node Żuławy-Zachód 017.9 km 2009–2012 1.1 billion zloty
    (262 million euros )
    June 9, 2012
    Żuławy-Zachód Knot - Nowy Dwór Gdański Knot 0020.5 km 2015-2018 1.64 billion zlotys
    (411 million euros)
    October 18, 2018
    Node Nowy Dwor Gdanski - node Elblag-Zachód 19.1 km 2015-2018 1.58 billion zlotys
    (394 million euros)
    October 18, 2018
    Node Elblag -Zachód - node Elbląg-Wschód 006.5 km 2004-2007 250 million zlotys
    (65 million euros)
    September 14, 2007
    Elbląg-Wschód knot - Pasłęk- Północ knot 013.7 km 2008-2011 662 million zlotys
    (157 million euros)
    July 28, 2011
    Pasłęk-Północ knot - Miłomłyn-Północ knot 036.5 km 2010–2012 1.1 billion zloty
    (260 million euros)
    August 1, 2012
    Node Miłomłyn -Północ - node Miłomłyn-Południe (1) 002.6 km 1995-1997 24 million zlotys
    (7 million euros)
    December 9, 1997
    Node Miłomłyn -Północ - node Ostróda -Północ (2) 9.5 km 2014-2017 292 million zlotys
    (74 million euros)
    19th December 2016
    Node Ostróda -Północ - node Ostróda-Południe 9.7 km 2015-2017 706 million zlotys
    (177 million euros)
    20th June 2018
    Ostróda-Południe node - Rychnowo node 8.8 km 2015-2017 299 million zlotys
    (75 million euros)
    11th August 2017
    Node Rychnowo - node Olsztynek -Zachód 11.2 km 2015-2017 389 million zlotys
    (97 million euros)
    December 6, 2017
    Node Olsztynek -Zachód - node Nidzica -Północ 027.8 km 2010–2012 1.3 billion zloty
    (314 million euros)
    November 7, 2012
    Node Nidzica -Północ - node Nidzica-Południe 9.1 km 2015-2017 229 million zloty
    (57 million euros)
    23rd June 2017
    Nidzica-Południe knot - Napierki knot 13.6 km 2015-2017 263 million zlotys
    (66 million euros)
    23rd June 2017
    Node Płońsk -Ciechanów - node-Płońsk Siedlin 004.3 km 2007-2009 17 million zlotys
    (44 million euros)
    June 3, 2009
    Node Zakroczym -Ostrzykowizna - node Czosnów
    (bypassing Novy Dwór ) (3)
    014.6 km - - June 16, 1999
    Node Warszawa -Północ - node Konotopa (4) 008.7 km Realization as a section of the S8 expressway
    Konotopa knot - Warszawa-Południe knot (5) 011.1 km Realization as a section of the S2 expressway
    Głuchów junction - Kępina junction
    ( Grójec bypass )
    008.3 km 2006-2008 207 million zlotys
    (54 million euros)
    September 19, 2008
    Kępina Knot - Białobrzegi Knot 017.8 km 2007-2009 494 million zlotys
    (124 million euros)
    May 26, 2010
    Białobrzegi Knot - Radom- Północ Knot 015.7 km 2006-2008 404 million zlotys
    (105 million euros)
    July 16, 2008
    Node Radom -Północ - node-Południe Radom 24.7 km 2015-2018 729 million zlotys
    (182 million euros)
    19th October 2018
    Node Radom -Południe - border W. Mazovia / W. Holy Cross 22.0 km 2014-2017 677 million zlotys
    (169 million euros)
    July 12, 2017
    Border W. Mazovia / W. Holy Cross - node Skarżysko -Południe 7.6 km 2017-2019 260 million zlotys
    (59 million euros)
    18th December 2019
    Node Skarżysko -Południe - node Suchedniów
    (bypass skarżysko-kamienna )
    001.9 km 2004-2005 58 million zloty
    (15 million euros)
    December 19, 2005
    Suchedniów - Występa node 016.7 km 2009-2011 643 million zloty
    (152 million euros)
    April 27, 2011
    Występa - node Kielce -Północ 007.3 km 2007-2009 227 million zlotys
    (57 million euros)
    October 16, 2009
    Node Kielce -Północ - node Kielce-Południe 022.7 km 2010-2013 642 million zloty
    (153 million euros)
    July 10, 2013
    Node Kielce -Południe - node Jędrzejów -Północ 21.6 km 2015-2017 586 million zlotys
    (147 million euros)
    December 21, 2018
    Node Jędrzejów -Północ - node-Jędrzejów Wschód 002.3 km 2003-2005 50 million zlotys
    (12 million euros)
    July 2, 2005
    Jędrzejów-Wschód junction - W. Heiligkreuz / W. Lesser Poland border 19.9 km 2014-2017 368 million zlotys
    (92 million euros)
    23 September 2017
    Node Kraków -Nowa Huta - node Kraków-Przewóz 4.3 km 2014-2017 529 million zlotys
    (132 million euros)
    June 29, 2017
    Node Kraków -Przewóz - node Kraków-Bieżanów 002.7 km 2008-2010 198 million zlotys
    (48 million euros)
    November 16, 2010
    Kraków-Bieżanów node - Kraków-Południe node (6) 011.0 km Realization as a section of the A4 motorway
    Node Myślenice - node Pcim 012.2 km 2004-2008 295 million zloty
    (76 million euros)
    March 20, 2008
    Node Pcim - node Lubień 004.0 km 2006-2009 133 million zloty
    (34 million euros)
    October 22, 2009
    Node Skomielna Biala - node Rabka -Zabornia 5.2 km 2016-2018 615 million zlotys
    (154 million euros)
    September 28, 2019
    total 470.5 km
    439.7 km *
    16.9 billion zlotys
    (3.86 billion euros)
    * Kilometers without common sections
    (1) only one lane
    (2) partly second lane
    (3) Modernization and six-lane expansion planned
    (4) Joint section planned with the S8 expressway
    (5) Common section with the S2 expressway
    (6) Section shared with the A4 motorway

    Sections under construction

    section length Contract
    signing
    construction time building-costs planned
    completion
    Node Napierki - node Mława -Południe 14.0 km 20th December 2017 2017-2021 295 million zlotys
    (67 million euros)
    May 2021
    Node Mława -Południe - node Strzegowo -Północ 21.5 km 20th December 2017 2017-2021 446 million zlotys
    (101 million euros)
    May 2021
    Node Strzegowo -Północ - node Pieńki 22.0 km January 12, 2018 2018-2021 516 million zlotys
    (119 million euros)
    May 2021
    Pieńki Knot - Płońsk -Ciechanów Knot 13.7 km January 12, 2018 2018-2021 312 million zloty
    (72 million euros)
    May 2021
    Warszawa-Południe knot - Lesznowola knot 6.6 km February 14, 2020 2020-2022 457 million zlotys
    (104 million euros)
    October 2022Template: future / in 2 years
    Lesznowola node - Tarczyn- Północ node 14.8 km 17th August 2018 2018-2021 389 million zlotys
    (88 million euros)
    December 2021
    Node Tarczyn -Północ - node Głuchów / Grójec 7.9 km 17th August 2018 2018-2021 203 million zlotys
    (46 million euros)
    December 2021
    Border W. Heiligkreuz / W. Lesser Poland - Miechów node 18.7 km February 18, 2020 2020-2023 753 million zlotys
    (171 million euros)
    June 2023Template: future / in 2 years
    Szczepanowice node - Widoma node 14.0 km January 8, 2018 2018-2021 508 million zlotys
    (115 million euros)
    June 2021
    Widoma node - Kraków -Nowa Huta node 18.3 km September 27, 2018 2018-2022 1.07 billion zloty
    (243 million euros)
    June 2022
    Lubień junction - Naprawa provincial crossing 7.6 km June 29, 2016 2016-2021 522 million zlotys
    (131 million euros)
    March 2021
    prov. Naprawa intersection - Skomielna Biała junction
    ( Luboń Mały tunnel )
    3.0 km June 29, 2016 2016-2020 969 million zlotys
    (243 million euros)
    December 2020
    total 162.1 km 6.44 billion zlotys
    (1.5 billion euros)

    Planned sections

    section length planned construction time estimated construction costs
    Node-Płońsk Siedlin - node Zakroczym -Ostrzykowizna 021.5 km unknown 1.7 billion zloty
    (425 million euros)
    Czosnów node - Warszawa- Północ node 022.5 km unknown 3 billion zlotys
    (750 million euros)
    Miechów node - Szczepanowice node 04.5 km 2016-2020
    Kraków-Południe node - Myślenice center node 025.0 km unknown
    total 73.5 km 4.7 billion zloty
    (1.18 billion euros)

    particularities

    In the area of Nowy Dwór Gdański and Ryki, the route is still designated as national road 7 , as is the sections at Skarżysko-Kamienna. At Elbląg, the E28 merges with the S22 expressway . After the completion of the S10 expressway , national road 10 and national road 50 at the Płońsk-Siedlin junction will be rededicated as the S10. The line between Lesznowola and Antoninów has been expanded to three lanes. At the Radom-Południe junction, state road 7 will be rededicated to S12 after the S12 expressway . At Kielce-Zachód this will be done with the national road 74 , which is to be rededicated as the S74 expressway . The S7 runs along the A4 route between Kraków- Bieżanów and Kraków-Południe .

    Web links

    Commons : Expressway S7  - Collection of pictures, videos and audio files

    Individual evidence

    1. Course of the S7 at motorways-exitlists.com (accessed April 2, 2016)
    2. Eugeniusz Buszma: "Przegląd komunikacyjny" No. 3-4 September-October 1945th ( Memento of 18 December 2007 at the Internet Archive ) (Polish)
    3. Eugeniusz Buszma: "Drogowiec" No. 1 and 2 from 1946 ( Memento from December 18, 2007 in the Internet Archive ) (Polish)
    4. Network plans from 1939 to 2004
    5. Eugeniusz Buszma: "Drogowiec" No. 8 from 1971 ( Memento from December 18, 2007 in the Internet Archive ) (Polish)
    6. Decision of the regional council of January 23, 1976 ( memento of September 27, 2007 in the Internet Archive ) (Polish)
    7. Decision of the regional council of June 14, 1985 ( memento of December 18, 2007 in the Internet Archive ) (Polish)
    8. ^ Resolution of the Council of Ministers of September 28, 1993 (Polish)
    9. Decision of the Council of Ministers of January 23, 1996 (Polish)
    10. Decision of the Council of Ministers of September 29, 2001 (Polish)
    11. Decision of the Council of Ministers of August 26, 2003 (Polish)
    12. Decision of the Council of Ministers of May 15, 2004 (Polish)
    13. Decision of the Council of Ministers of July 13, 2007 (Polish)
    14. ^ Resolution of the Council of Ministers of October 20, 2009 (Polish)
    15. a b c overview map of all motorways and expressways (GDDKiA)
    16. Kolejna droga szybkiego ruchu otwarta… GDDKiA
    17. Dwie jezdnie z Olsztynka do Nidzicy GDDKiA
    18. Płońsk bypass opened (Polish)
    19. S7 Obwodnica Radomia GDDKiA
    20. a b S7 Radom - Skarżysko Kamienna GDDKiA
    21. S7 Węzeł drogowo - kolejowy w Skarżysku Kamiennej GDDKiA
    22. S7 na odcinku Skarżysko-Występa oddana do ruchu GDDKiA (Polish) accessed on April 28, 2011
    23. S7 Odcinek Chęciny - Jędrzejów GDDKiA
    24. S7 Odcinek Jędrzejów - granica województwa GDDKiA
    25. S7 - Kraków (Węzeł Igołomska) - Kraków Christo Botewa (Węzeł Rybitwy) GDDKiA
    26. ^ S7 - Lubień - Rabka GDDKiA
    27. a b c d S7 gr. Woj - Płońsk GDDKiA
    28. Komplet umów na budowę S7 między Płońskiem a Warmińsko-Mazurskiem :: Generalna Dyrekcja Dróg Krajowych i Autostrad - Serwis informacyjny. Retrieved September 5, 2019 .
    29. a b c S7 Warszawa - Grójec GDDKiA
    30. a b c d S7 - granica województwa świętokrzyskiego - Kraków (Węzeł Igołomska) GDDKiA
    31. ^ S7 Płońsk - Czosnów GDDKiA
    32. ^ S7 Czosnów - Warszawa GDDKiA