Droga ekspresowa S17

from Wikipedia, the free encyclopedia
Template: Infobox high-ranking road / maintenance / PL-S
Droga ekspresowa S17 in Poland
Droga ekspresowa S17
 E372-PL.svg
map
Droga ekspresowa S17
   In operation     In construction    In planning  
Basic data
Operator: GDDKiA-2011-Logo.svg
Start of the street: Ząbki
( 52 ° 18 ′  N , 21 ° 7 ′  E )
End of street: Hrebenne
( 50 ° 16 ′  N , 23 ° 35 ′  E )
Overall length: 325.2 km / 252.3 km without
common sections
  of which in operation: 183.2 km / 110.3 km
  of which under construction: 14.0 km
  of which in planning: 127.9 km

Voivodeship :

Requirement for use: Truck route toll
Development condition: 2 × 2 lanes
Course of the road
Masovian Voivodeship
node (R22)  Ząbki-Drewnica S8 E67
Junction (R21)  Zielonka DW631
Junction (R20)  Warszawa - Rembertów DW637
tunnel (800 m) 
Junction (R29)  Warszawa- Wesoła
node (R18)  Warszawa-Zakręt DK2
node (R17 / 1)  Warszawa-Lubelska
A2 E30 S2 E30
node (1)  Warszawa-Lubelska
A2 E30 Symbol: Down
Start of the road Transition off DK17 E372
Template: AB / Maintenance / Empty from here on 6 lanes
Junction (2)  Góraszka
Junction (3)  Wiązowna DW721
Template: AB / Maintenance / Empty from here 4-lane
Junction (4)  Otwock
Gas station Rest stop MOP (Cat.2) Icon: UpDownIcon: UpDown
Junction (5)  Ostrów
node (6)  Kołbiel DK50
Gas station Rest stop Symbol: hotel MOP (Cat. 3) Symbol: Down
Gas station Rest stop MOP (Cat. 2) Symbol: Up
Junction (7)  Lipówki DW805
Junction (8th)  Garwolin -Północ
Junction (9)  Garwolin-Zachód DK76
Junction (10)  Garwolin-Południe
Gas station Rest stop MOP (Cat. 2) Symbol: Up
Junction (11)  Górzno
Junction (12)  Gończyce DW807
Gas station Rest stop Symbol: hotel MOP (Cat. 3) Icon: UpDownIcon: UpDown
Junction (13)  Trojanów
Province Lublin
Gas station Rest stop MOP Niwa Babicka (Cat. 2) Symbol: Down
Junction (14)  Ryki -PółnocDK17 E372
Junction (15)  Ryki-Poludnie DK48
Gas station Rest stop MOP Sarny (Cat. 2) Symbol: Up
Junction (16)  Skrudki
Junction (17)  Żyrzyn DW824
Template: AB / Maintenance / Empty Common section with S12
node (18)  Kurów -ZachódS12 E373
Junction (7)  Kurów-Wschód
parking spot with toilet MOP (I) Markuszów-Południe Symbol: Down
Gas station Rest stop MOP (II) Markuszów-Południe Symbol: Down
parking spot with toilet MOP (I) Markuszów-Północ Symbol: Up
Gas station Rest stop Symbol: hotel MOP (III) Markuszów-Północ Symbol: Up
Junction (8th)  Nałęczów
Junction (9)  Jastków
Template: AB / Maintenance / Empty Common section with S12 & S19
Template: AB / Maintenance / Empty from here on 6 lanes
node (10)  Lublin -SlawinekS19 DK82
Junction (11)  Lublin-Czechów DW809
Gas station Rest stop MOP (II) Niemce Icon: UpDownIcon: UpDown
node (12)  Lublin-Rudnik DK19
Template: AB / Maintenance / Empty Common section with S12
Template: AB / Maintenance / Empty from here 4-lane
Junction (13)  Lublin-Tatary DK82
node (14)  Lublin-Zadębie Symbol: Airport DW822
node (15)  Lublin-Felin
Junction (16)  Świdnik
parking spot with toilet MOP (I) Bystrzejowice Symbol: Down
Gas station Rest stop Symbol: hotel MOP (III) Bystrzejowice Symbol: Down
parking spot with toilet MOP (I) Wierzchowiska Drugie Symbol: Up
Gas station Rest stop Symbol: hotel MOP (III) Wierzchowiska Drugie Symbol: Up
Junction (17)  Piaski -Zachód
node (18)  Piaski-Wschód S12 E373 DK17
Junction (19)  Piaski-Południe
Gas station Rest stop MOP Ignasin Symbol: Down
node (20)  Fajslawice DW838
Gas station Rest stop MOP Suchodoły Symbol: Up
Junction (21)  Łopiennik
Gas station Rest stop MOP Łopiennik Symbol: Down
Junction (22)  Krasnystaw -Północ
Junction (23)  Krasnystaw-Poludnie DW842
flow (1310 m)  Wieprz
park Rest MOP Ostrzyca Icon: UpDownIcon: UpDown
Junction (24)  Izbica
Junction (25)  Stary Zamość
Junction (26)  Zamość -SitaniecDK17
Gas station Rest stop MOP Kolonia Sitaniec Icon: UpDownIcon: UpDown
Junction (27)  Zamość-Północ DW843
node (28)  Zamość-Wschód DK74
Junction (29)  Zamość-Poludnie
Gas station Rest stop MOP Krynice Icon: UpDownIcon: UpDown
Junction (30)  Tarnawatka
Motorway junction (31)  Tomaszów Lubelski -PółnocDW850
Junction (31)  Tomaszów Lubelski -PółnocDW850
node (32)  Tomaszów Lubelski-Południe DK17
Junction (33)  Bełżec DW865
Junction (34)  Lubycza Królewska
Junction (35)  Hrebenne DW867
Border crossing Border crossing Hrebenne ( PL ) -
Rawa-Ruska ( UA )
Ukraine Continue on  M09Lviv
  • Under construction
  • In planning
  • The Droga ekspresowa S17 ( pol. For 'expressway S17') is a partly completed, mostly planned expressway in Poland and is to connect Warsaw with Lublin and the Polish- Ukrainian border. It becomes part of the European route 372 .

    Planning history

    An expressway connection from Warsaw via Lublin, Lemberg and Ivano-Frankiwsk to Romania was already provided for in the network plan of Poland from 1939 . The plans from 1945 and 1946 included a line branching off the Warsaw – Košice line at Radom , which was to be led via Lublin to Lemberg. In 1963 only the Warsaw - Lublin line was included. In the 1971 plan, this line was extended beyond Lublin to Zamość . Nothing was changed in 1976 either. It was not until 1985 that a continuous connection from Warsaw to Lviv was considered again. Since then, this line has remained unchanged in the network plans for 1993, 1996, 2001, 2003 and 2004, although the designation S17 has been used in the plans for the planned route since 2001.

    Completed sections

    section length construction time building-costs Traffic transfer
    Warszawa-Lubelska junction (A2) - Kołbiel 015.2 km 2016-2019 370 million zlotys
    (93 million euros )
    17th July 2020
    Kołbiel bypass 008.7 km 2016-2019 225 million zloty
    (56 million euros)
    17th July 2020
    Kołbiel - Garwolin 013.0 km 2016-2019 290 million zlotys
    (73 million euros)
    23 December 2019
    Bypassing Garwolin 012.8 km 2005-2007 223 million zlotys
    (56 million euros)
    September 26, 2007
    Garwolin - node Gończyce 12.2 km 2015-2019 289 million zlotys
    (72 million euros)
    4th July 2019
    Gończyce node - W. Mazovia / W. Lublin border 13.0 km 2015-2019 314 million zlotys
    (79 million euros)
    4th July 2019
    Border of W. Mazovia / W. Lublin - Skrudki node 20.2 km 2015-2019 609 million zlotys
    (152 million euros)
    September 6, 2019
    Node Skrudki - node Kurów -Wschód 13.2 km 2015-2019 Zloty 271 million
    (EUR 68 million)
    19th June 2019
    Node Kurów -Wschód - node  Jastków (1) 024.9 km 2011-2013 Realized as sections of the S12 expressway
    Node  Jastków - node Lublin -Sławinek (1) 007.7 km 2011-2014
    Lublin-Sławinek junction - Lublin-Rudnik junction (1) 010.2 km 2011-2014
    Node Lublin -Rudnik - node Lublin-Felin (1) 013.8 km 2011-2014
    Lublin-Felin junction - Piaski -Zachód junction (1) 012.1 km 2010–2012
    Piaski-Zachód junction - Piaski-Wschód junction (1)
    (bypassing Piaski )
    004.2 km 2002-2004
    Bypass Hrebenne (2) 002.0 km 2006-2008 34 million zloty
    (9 million euros)
    May 1, 2008
    total 0183.2 km
    0110.3 km *
    5.84 billion zlotys
    (1.47 billion euros)
    * Kilometers without common sections
    (1) common sections with the expressway S12
    (2) a lane

    Sections under construction

    section length Contract
    signing
    construction time building-costs planned
    completion
    Warszawa-Zakręt node - Warszawa-Lubelska node (A2) 002.5 km July 25, 2017 2017-2021 225 million zlotys
    (53 million euros)
    April 2021
    Warszawa-Lubelska junction (A2) 001.9 km July 25, 2017 2017-2021 190 million zlotys
    (44 million euros)
    April 2021
    Tomaszów Lubelski-Północ node - Tomaszów Lubelski-Południe node
    ( Tomaszów Lubelski bypass ) (3)
    009.6 km 17th November 2017 2017-2021 194 million zlotys
    (43 million euros)
    April 2021
    total 14.0 km 609 million zlotys
    (140 million euros)
    (3) a lane

    Planned sections

    section length planned construction time estimated
    construction costs
    Node  Warszawa -Drewnica (S8) - node Warszawa-Zakręt 014.6 km 2018-2021 2 billion zlotys
    (500 million euros)
    Piaski-Zachód node - Łopiennik node  015.6 km unknown 5.72 billion zlotys
    (1.43 million euros)
    Łopiennik Knot - Krasnystaw Knot  010.8 km
    Krasnystaw node - Zamość-Sitaniec node 027.1 km
    Zamość-Sitaniec node - Zamość-Wschód node 013.0 km unknown
    Zamość-Wschód node - Tomaszów Lubelski-Północ node 029.5 km
    Tomaszów Lubelski-Północ node - Tomaszów Lubelski-Południe node
    ( Tomaszów Lubelski bypass ) (4)
    009.6 km unknown
    Tomaszów Lubelski-Południe node - Hrebenne node  017.3 km unknown
    total 127.9 km 7.72 billion zloty
    (1.93 billion euros)
    (4) second lane
    S17 in Warsaw

    particularities

    The line between the Zielonka and Warszawa- Lubelska nodes will have three lanes. The S17 runs together with the S12 between the Kurów -Zachód and Piaski -Zachód junctions . There is also the S19 between the Lublin -Sławinek and Lublin-Rudnik nodes .

    Web links

    Individual evidence

    1. ^ Course of the S17 at motorways-exitlists.com; accessed December 28, 2010
    2. MW Nestorowicz: "Drogowiec" No. 9 of March 5, 1939.. ( Memento of 3 October 2011 at the Internet Archive ) (Polish)
    3. Eugeniusz Buszma: "Przegląd komunikacyjny" No. 3–4 September – October 1945. ( Memento of December 18, 2007 in the Internet Archive ) (Polish)
    4. Eugeniusz Buszma: "Drogowiec" No. 1 and 2 from 1946. ( Memento of December 18, 2007 in the Internet Archive ) (Polish)
    5. Network plans from 1939 to 2004
    6. Eugeniusz Buszma: "Drogowiec" No. 8 from 1971. ( Memento from December 18, 2007 in the Internet Archive ) (Polish)
    7. ^ Resolution of the regional council of January 23, 1976 ( Memento of September 27, 2007 in the Internet Archive ) (Polish)
    8. ^ Decision of the regional council of June 14, 1985 ( memo of December 18, 2007 in the Internet Archive ). (Polish)
    9. ^ Resolution of the Council of Ministers of September 28, 1993 (Polish)
    10. Decision of the Council of Ministers of January 23, 1996 (Polish)
    11. Decision of the Council of Ministers of September 29, 2001 (Polish)
    12. Decision of the Council of Ministers of August 26, 2003 (Polish)
    13. Decision of the Council of Ministers of May 15, 2004 (Polish)
    14. Decision of the Council of Ministers of July 13, 2007 (Polish)
    15. ^ Resolution of the Council of Ministers of October 20, 2009 (Polish)
    16. a b c overview map of all motorways and expressways (GDDKiA)
    17. Kolejne 30 km S17 otwarte - Inwestycje. Retrieved July 16, 2019 (Polish).
    18. 13 km trasy S17 Lublin-Warszawa już gotowe - Inwestycje. Retrieved June 20, 2019 (Polish).