Ore Railway (Bochum)

from Wikipedia, the free encyclopedia
Railway tracks in the central Ruhr area converted as cycle paths
Elevation profile of the ore railway line
RVR information board at Erzbahnbrücke 6 with a map and background information

The ore railway in Bochum was a railway line to supply the blast furnaces of the Bochum Association with iron ore . It began in Gelsenkirchen on the Rhine-Herne Canal and led for about nine kilometers south to the former Bochum club on the edge of Bochum city ​​center .

The railway line was built in several sections south of the Rhine-Herne Canal ; the bridges on the railway line give an insight into the respective bridge construction technology over a period of 30 years. Construction began in 1901 and the Schalker Verein steelworks, among other things, was connected to the rail network. Due to the numerous traffic connections in the east-west direction along the ore line, the route was laid on an approximately 15-meter-high dam with 15 bridges. With the construction of the pillar bridge in 1918/19 the Alma colliery in Gelsenkirchen was connected to the railway. It was not until the final expansion stage in 1930 that the line was expanded to the Bochumer Verein steelworks and was used for transporting ore. At the same time, it was an important siding for the Carolinenglück colliery and its coking plant , which was only 1.5 kilometers north of the Bochumer Verein's blast furnaces.

Creation of the cycle path

After the blast furnace operation at the Bochumer Verein ended in the sixties, the ore railway was no longer needed and gradually fell into disrepair. Earlier plans for other uses of the route were not carried out, so a green corridor in a north-south direction in a densely populated area was retained. From 2002 to 2008 the route was dismantled to a cycle path . This enabled the Westpark to be connected to the Emscher cycle path without crossing . The course of the route on a dam allows an excellent view of the surrounding industrial and residential landscape. In the course of the route there are some larger, sometimes spectacular bridge structures, including the newly built ore railway swing over Gahlensche Strasse , the pillar bridge and the Grimberger Sichel . In 2012, the stretch from the Erzbahnschwinge (Bochum) to the pillar bridge (Gelsenkirchen) was paved throughout. In October 2016 the section to the north (from the pier bridge towards Gelsenkirchen) was paved.

Description of the route

Former cable car from the Carolinenglück colliery to the Bochumer Verein

The ore railway line has a total length of nine kilometers and begins at Westpark in Bochum (western city center). To the northwest of the Jahrhunderthalle , the route runs over the Erzbahnschwinge ( 51 ° 29 ′ 3.4 ″  N , 7 ° 11 ′ 43.4 ″  E ) , which initially runs parallel to the Thyssen-Krupp works' railway connection, which is still being used . After crossing the Ruhr Schnellweg A 40, the route touches the site of the Carolinenglück colliery , which for a long time did not deliver the coking coal for the Bochum association via the railway line but by means of a cable car . Above shaft 2 there is an inconspicuous Malakow tower built around 1856 and above shaft 3 one of the rare German strut scaffolding of the Zschetzsche type , which was erected around 1912. The shaft is still being driven on and is used for central drainage. The colliery was shut down in 1964. After the colliery shut down, industrial companies (Bochum galvanizing plant, scrap yard) have settled next to the route.

In the further course, the route touches the Dahlhauser Heide settlement in Bochum-Hordel. The embankment towers above the site by ten to twelve meters. The massive Malakow Tower (shaft 1 of the Hannover colliery ) rises above the tree tops. In Wattenscheid-Günnigfeld, a longer bridge structure crosses the street of the same name. At the Ückendorf junction, the connection to the Zollverein cycle path was created in 2005 via the Kray-Wanner railway line . From here, the Zeche Zollverein in Essen-Stoppenberg can be reached via a completely completed cycle path.

A particularly impressive section follows the ore railway line, the pier bridge ( 51 ° 30 ′ 46.9 ″  N , 7 ° 8 ′ 19 ″  E ) . The first part spans the Herne-Wanne-Gelsenkirchen freight railway. This is followed by an intermediate part made up of 21 fields made up of riveted box profiles. The bike path now rests on the profiles. Railings were attached in the course of the renovation. Riveted steel and concrete supports were used. The last part is the bridge over the line of the Cologne-Mindener Eisenbahn-Gesellschaft .

The bridge over Elfriedenstrasse and Gelsenkircher Strasse consists of two sections. While the eastern part has been converted into a cycle path, the tracks are still on the western part. The route now forms the border between the cities of Gelsenkirchen and Herne. Bridge structures follow at shorter intervals, and the Emschertal Railway is passed. To the east you have a view of the Pluto-Wilhelm shaft , which, like shaft XII of the Zollverein colliery, was also designed by Fritz Schupp . The height of the embankment above the ground level decreases continuously in the further course.

The double bridge trailer follows on Wilhelmstrasse. The embankment above the surrounding level flattens towards the port. The route leads along the Pluto heap, which has so far been barely accessible. The canalised Hüller Bach runs on the western side. The motorway A 42 is crossed under and then the port of Grimberg on the Rhine-Herne Canal in Gelsenkirchen is reached, which is the end point of the former ore railway.

In a new continuation, the cycle path here initially runs next to Grimbergstrasse in the Gelsenkirchen city area. The Hüller Bach will be crossed with a new bridge for the footpath and bike path. Shortly afterwards you reach the eastern boundary of the ZOOM Erlebniswelt (former Ruhrzoo), where you can look into the landscape. A bridge over the Rhine Herne channel has been established at the northeast corner of the zoos, as Grimberger sickle is referred to ( 51 ° 32 '50.3 "  N , 7 ° 6' 48.5"  O ) . The bridge parts were joined together on October 25, 2008 with the help of a floating crane. The official inauguration of the last section of the ore railway line took place as part of a ceremony on October 26, 2008. The bridge was opened to the public at the end of April 2009; the official opening ceremony for the bridge took place on June 20, 2009. Guests were among others the responsible Minister of North Rhine-Westphalia Uhlenberg , the mayors of the participating cities and those responsible for the RVR.

With the crossing of the canal, the forest area of ​​the Emscherbruch is reached. From there there are connections to the Canal Cycle Path or the Emscher Cycle Path. The König-Ludwig-Trasse can be reached via these cycle paths in an easterly direction, which in turn is to be extended to the Münsterland in the long term . In a northerly direction, the cycle path to the Hoheward and Hoppenbruch dumps and the Ewald colliery can be reached by crossing the B 226. At this point, a pedestrian traffic light should defuse the unsafe traffic situation.

Pit water pipe

The bill Carolinenglück still serves the since their demise in 1964 dewatering , the pumped-salt-rich mine water was until 2008 in the channeled Hüller Mühlebach initiated, which flows into the Emscher. The permit for this discharge into natural watercourses expired in 2010. Deutsche Steinkohle (DSK) therefore built a pit water pipe in the route as well as under or next to the bridge structures at the same time and in cooperation with the repair of the ore railway by the RVR. The lines consist of steel pipes that are lined with concrete casing on the inside. One of the two 400 mm pipes is constantly in operation, the other is used as a reserve. One of the two 100 mm pipes is designed as a drainage facility, the other accommodates the control technology. On the route there are inspection openings in the ground, on the bridges the pipes are partly routed below the bridge body (e.g. pier bridge), partly next to the bridge (see photo on Florastraße below).

In 2009, leaks occurred on the kinking pipe parts, which have since been fixed as part of the warranty.

The bridges in detail

km designation Illustration annotation place
0.0 Ore rail swing arm Erzbahnschwinge Bochum closeup.jpg The Erzbahnschwinge is located at the Jahrhunderthalle in Bochum. On it you leave the Westpark towards the northwest. This bridge was designed by Jörg Schlaich . Bochum
0.5 Bridge over the Marbach and the freight railway track Erzbahn2.jpg On the works railway between the Krupp factories in Bochum.

Seen from the southwest.

Bochum
0.6 Bridge over the Rheinische Bahn Erzbahn Bochum Bridge overRheinischeBahn.jpg Riveted, single-track and 46 meter long truss bridge from 1928 Bochum
1.0 Bridge over the A 40 Ore Railway Bochum Bridge over A40.jpg Double-track, sheet steel privacy protection on one side and grille on the other. Bochum
1.1 Bridge over the Darpestrasse Erzbahn3.jpg The bridge over Darpestrasse is located next to the A 40 in Bochum. Shaft 3 of the Carolinenglück colliery can be seen in the background . The shaft will continue to be kept open for the central dewatering.

View from the south.

Bochum
3.2 'Red Bridge' Ruhr area Erzbahn bridge.jpg 1926–1928 built bridge with a span of 45 meters, which crosses the approximately six meter high dam of the former Reichsbahn line Gelsenkirchen-Wattenscheid to Wanne.

Seen from the northeast

Bochum
3.6 Bridge over the street Am Blumenkamp Ruhr area Erzbahn bridge 4.jpg Looking north-west Bochum
3.9 Bridge over Günnigfelder Strasse Ore Railway Bridge Günnigfelder Strasse.JPG A 99-meter-long bridge, probably built in 1928, which was extensively restored for use as a cycle path.

Direction of view: southeast

Bochum
4.7 Bridge over the path between the shelter and the cemetery Erzbahnbrücke Tierheim.jpg After the line was closed, the bridge section was dismantled. In the course of the new use, the steel bridge was placed on the refurbished abutments. Herne
5.1 Bridge over Hofstrasse Erzbahn bridge over Hofstrasse.JPG The bridge trailer, made of a steel box and handrail bracing, was put on in place of the dismantled bridge part as part of the new use in 2005. Herne
5.7 Pier bridge Ore Railway Bochum pillar bridge-2.jpg At 344 m, the pier railway is the longest bridge section of the ore railway. It was built in 1918-1919 to connect the Alma colliery to the railway. The bridge's roadway is 14 meters above ground level. The structure spans the Gelsenkirchen-Wanne freight railway line with two half-timbered constructions of 33 meters in length and the Cologne-Minden railway with 45.6 meters. In between there are 21 steel fields with a length of 13.35 meters each, which are bolted to the foundation and could thus be readjusted if mining damage occurred. The repair of the bridge was completed at the end of 2005. The box bridges were lifted during the renovation.
The picture showed the view from the northwest, about 2/3 of the bridge length can be seen.
Gelsenkirchen
6.1 Bridge over Elfrieden- and Gelsenkircher Str. Erzbahn Bridge Gelsenkircher Str.JPG The bridge over Elfrieden- or Gelsenkircher Str. And the Hüller Bach was built between 1912 and 1914.

Recording from November 2005

Gelsenkirchen / Herne
6.9 Bridge over the Florastrasse Erzbahnbrücke Florastraße.jpg Seen from the south. On the right some pipes from the pit water pipe Herne
7.2 Bridge east of the Gelsenkirchen Ostfriedhof Erzbahn bridge east of Gelsenkirchen's Ostfriedhof AufDerTrasse.jpg The second track was deliberately not dismantled to demonstrate the original route. Herne
7.5 Bridge over the Bickernstrasse Erzbahn Bridge Bickernstrasse AufDerTrasse.jpg Bickerer Höfe Herne
7.8 Bridge over Wilhelmstrasse Erzbahnbrücke Wilhemstrasse.JPG The span of this bridge is 20.2 meters.

On this picture from December 2006, the cycle and hiking trail north of Wilhelmstrasse (in the background) is not yet completed.

Herne
9.5 Bridge over the Hüller Bach Ruhr area Erzbahn bridge 5.jpg The bridge built in 2008 between the zoo and the harbor over the Hüller Bach at the Grimberg harbor parallel to Grimbergstraße in Gelsenkirchen-Bismarck, seen from the north-west Gelsenkirchen
10.2 Grimberger Sichel over the Rhine-Herne Canal Grimberg-Bruecke-2009-05-30.jpg The asymmetrical steel structure crosses the canal in a semicircular arc. Hanging only from a 48 meter high steel pylon on the north side of the canal, the curved bridge has a span of around 150 meters. The northern, 37-meter-long ramp is formed by concrete retaining walls, the southern, 34-meter-long ramp is made as an earth dam. More than 600 cubic meters of concrete and 235 meters of large bored piles were used for the abutments, as well as 400 tons of steel and 465 meters of rope for the suspension structure. In September 2010 the Grimberger Sichel received the European Steel Bridges Award 2010 in the category "Pedestrian Bridges". Gelsenkirchen

More pictures

literature

  • Rüdiger Harnach, Oliver Buckenauer, Ute Kartenberg: Historical, technical study of the ore railway route. October 2001.
  • Regional Association Ruhr, Department of Leisure and Tourism (Ed.): Erzbahn-Emscherbruch (theme route 8 of the “Route of Industrial Culture”). Essen 2005, ISBN 3-932165-43-8 .

Individual evidence

  1. ^ Information service Ruhr: "Grimberger Sichel": Awarded RVR bridge now has a name from August 27, 2010
  2. ^ "Erzbahntrasse and Kray-Wanner-Bahn asphalted" , ADFC Bochum, accessed on May 24, 2012
  3. Erzbahntrasse closed - section gets new asphalt . WAZ, Gelsenkirchen edition, September 21, 2016.
  4. lecture by Christoph Haep, RVR Ruhr green, along the rail trail on 19 May 2009 at the House of History of the Ruhr .
  5. ^ Information service Ruhr: RVR bridge over the Rhine-Herne Canal receives European bridge construction award from August 13, 2010

Web links

Commons : Erzbahn (Bochum)  - Collection of pictures, videos and audio files